Infor LN PMC Solution and Patch Installation Checklist
This checklist covers installing Infor LN solutions and patches through PMC (Product Maintenance and Control) on an on-prem LN 10.x system. Work through it per solution or per patch, from reading release notes to recording what reached production.
0 of 33 items complete
12 critical items still open - these are the highest-risk gaps.
Before download
Installation in test
Customization collisions
Testing
Production
Every critical item should be checked before production installation. If any item in Customization collisions is open, the solution is not ready for production even if it installed cleanly in test.
Get your pending solutions reviewed against your customizations
Send us the solution list and your customer VRC object list and we will flag likely collisions and missing dependencies before your patch window.
Optional. The tool and every export work without this. No spam.
How to use it
Open a copy per change and tick items as they are done. Critical items block production. The groups follow the real order of work: read and check dependencies before downloading anything, install and retrofit in test, test, then repeat in production with the same solutions in the same order. Export the completed list to PDF or Excel and attach it to the change record so auditors and the next administrator can see what was checked. For a cumulative patch, treat the patch as one unit for installation but still review the solutions inside it for collisions with your own code.
Where this lives in LN
PMC on the recipient side is in the Tools package. You scan a delivered solution or patch file into PMC, then install solutions in Process Solutions (ttpmc2101m000) or patches in Process Patches (ttpmc2102m000). From either session you can view the dependencies of a solution: the prerequisites and co-requisites that must be installed before or with it. Defining dependencies is a distributor-side task, used only when you build and deliver your own solutions, for example to transport customizations. Installed objects go into the update VRC connected in PMC; customer VRCs derived from it are not changed.
- Install solutions: Process Solutions (ttpmc2101m000)
- Install patches: Process Patches (ttpmc2102m000)
- Dependencies: viewed from either session before installing
- Logs: $BSE/log on the application server
Worked example: a solution that touches a customized script
A solution fixes rounding in a sales order line script. The release notes list two prerequisites, one already installed. You order the missing one, scan both, install the prerequisite first and then the fix in test. The object list shows the script also exists in your customer VRC because a developer changed it two years ago. Users running that session would still execute the customer copy, so the fix would appear not to work. The developer merges the standard change into the customer copy, recompiles, and the key user retests the original scenario plus normal order entry before the solution is scheduled for production.
Gotchas
Most failed patch weekends come from three things. First, a missing co-requisite: two solutions that must be installed together were split. Second, customized objects shadowing the fix, as above. Third, table definition changes that trigger table reconfiguration on large tables and run far longer than planned. Check the release notes for table changes and time the reconfiguration in test on production-sized data. Some solutions can be uninstalled through PMC, but do not plan on it for solutions that change tables or data, so treat a backup as the real rollback.
Frequently Asked Questions
Where do I find Infor LN release notes for a solution?
Each solution on the Infor support portal has its own description and, where relevant, a KB article with symptoms, cause and manual steps. Release-level notes for a feature pack or update are on docs.infor.com and the support portal. Read both: the solution text tells you what changes, the KB tells you what else you must do.
What is the difference between a solution and a patch in LN PMC?
A solution is a single fix or change set. A patch bundles a set of solutions delivered together, often cumulatively. Solutions are installed in Process Solutions (ttpmc2101m000) and patches in Process Patches (ttpmc2102m000). Inside an opened patch you can see and handle the individual solutions it contains.
How do I check which LN version and solutions are installed?
Process Solutions and Process Patches show each solution with its status, so you can filter on Installed for an update VRC. The package VRCs used by your package combination show the base version. Keep your own register of installed solutions too, because it is faster for audits and comparing environments.
Can I install a solution directly in production?
PMC will let you, but it is a bad idea on any customized system. Customized objects in derived VRCs, missing co-requisites and table reconfiguration only show up when you install and test. Use a test environment copied from production and install the same set in the same order in both.
If you want your LN admins to ask in plain English which customized objects a pending solution touches, we can set that up on your own servers.
Related Tools
Infor LN VRC Development and Change Control Checklist
IT general controls checklist for custom development on an on-prem Infor LN 10.x system: VRC layout, developer access, change approval, transport and the evidence auditors ask for.
Infor LN & BaanInfor LN New Company Creation Checklist
Step-by-step checklist for adding a company to an on-prem Infor LN 10.x system, from planning the company number and table sharing to validating the first transactions.
Infor LN & BaanInfor LN Regression Test Effort Calculator
Estimate test hours, defects and calendar weeks for an LN upgrade or change, and see how adding testers shortens the schedule.
Infor LN & BaanInfor LN Customization Complexity Scorer
Score how manageable your Infor LN customization portfolio is - and how much risk it adds to every upgrade, CloudSuite move, and support handover.
More Infor LN & Baan tools
See all- Infor LN Session and Module Code Reference
- Infor LN Production Order Status and Lifecycle Reference
- Infor LN 4GL Session Script Template
- Infor LN Company and Enterprise Unit Design Worksheet
- Infor LN DAL Hook Review Checklist
- Infor LN Warehousing Order Origins and Types Reference
- Infor LN Table Name and SQL Query Builder
- Infor LN and Baan Customization Inventory Worksheet
- Baan to Infor LN Data Conversion Mapping Worksheet
Keep exploring
Free tools
- Infor LN PMC Solution Backlog Patch Effort CalculatorSize the work of installing a backlog of LN solutions with PMC, including missing prerequisites, collisions with your customizations and regression testing.
- Infor LN Go-Live Readiness ChecklistGo or no-go checklist for an LN implementation, upgrade or Baan migration, with critical items flagged.
- Infor LN User Access Review ChecklistA practical checklist for periodic review of who can do what in Infor LN, covering roles, privileged access and segregation of duties.