Infor LN & BaanFree referencePDF, Excel, Word exportInfor LNAll Infor LN and Baan tools

Infor LN Production Order Status Reference

A production order in Infor LN moves through a defined lifecycle in shop floor control (tisfc). This table lists the stages in order, what each one means for the shop floor, the transactions usually done there and the traps that cause stuck or unclosable orders.

Download:
StepStatus or eventWhat it meansTypical transactionsWatch for
1
Planned order
Order proposed by planning, not yet a firm production order
Review, change quantity and dates, firm or transfer to shop floor
Planned orders are rebuilt by the next planning run, so edits can be lost
2
Planned
Production order exists in shop floor control but is not yet released to the floor
Check BOM and routing, estimate materials and operations, print documents
BOM or routing missing or not effective for the order date
3
Released
Order is released for production and can start to be worked
Material availability check, material issue, shop floor documents
Component shortages and unavailable work center capacity
4
Active
Production has started: material issued or operations reported
Report material, report operations and hours, scrap and rework
Backflush versus manual issue settings per item and operation
5
Completed
Quantity is reported complete and the item is received to stock
Report completed quantity, receive to inventory, quality inspection if used
Over and under reporting, wrong receipt warehouse
6
Closed
Order is financially and logistically finished, no further reporting
Final cost and variance calculation, archive
Open material or hour transactions that block closing
7
Cost variance review
Compare standard or planned cost with actual after completion
Review material, labor and overhead variance
Wrong cost price basis or late hour reporting skews variance
8
Rework order
Additional order or operations to correct nonconforming output
Create rework order, report separately for cost visibility
Reworked quantity double counted on the parent order

Status names and the exact transitions allowed depend on your LN version, order type and parameters (for example material issue method and cost settings). Confirm against the status domain in your own Tools data dictionary and test a transition in a non-production company before you rely on it.

Aged production order report from your LN data

Optional: see a read-only list of open production orders with the likely blocking reason.

Optional. The tool and every export work without this. No spam.

Was this tool useful?

How to use the lifecycle table

Find the stage your order is in, then read across: what the status allows, which transactions belong to it and what commonly blocks the next step. Planners use it to explain why an order cannot be released, supervisors use it to know when reporting is allowed, and consultants use it to design training. Search for a keyword such as backflush or variance to jump to the relevant row, and export the table to add your own plant-specific rules, such as who may release and who may close.

The method behind the lifecycle

The sequence is the normal planned-to-closed path of discrete manufacturing: planning proposes, the planner firms, the order is released against a verified BOM and routing, material and labor are reported against it, the output is received, and the order is closed with variances. In LN the exact parameters that govern this live in the shop floor control and costing setup. Treat the table as a map of intent, not a substitute for your configuration.

  • Release checks material availability and routing validity
  • Reporting posts inventory and labor transactions
  • Closing locks the order and finalizes cost

Common mistakes

Orders that will not close are usually blocked by open transactions: unreported hours, un-issued backflush material or a pending receipt. Orders released with an outdated BOM carry the wrong components into the floor, so check the BOM effectivity before release. Teams also confuse planned orders from planning with production orders in shop floor control, and then wonder why edits disappear after a planning run. Keep a short written rule for who firms, releases and closes orders, and review aged open orders weekly.

Frequently Asked Questions

Why will my LN production order not close?

Typically there are open transactions: hours not reported, backflushed material not issued, or a completed quantity not received. Review the order's material and operation lines, post or cancel the open items, then try closing again. Cost settings can also block closing.

Where do production orders live in Infor LN?

In the ti manufacturing package, shop floor control module (tisfc). Related data comes from bill of material (tibom) and routing (tirou), and costing is in ticst. Item data sits in tcibd.

What is the difference between a planned order and a production order?

A planned order is a proposal created by planning that can be rebuilt on the next run. A production order is an order in shop floor control that is firm and carries materials, operations and reporting. Planned orders are transferred to become production orders.

Can I reopen a closed production order?

Normally a closed order accepts no more reporting. Whether and how it can be reopened depends on your version and authorizations. If it is needed, test the procedure in a non-production company and involve cost accounting, because costs are finalized at closing.

If stuck or aged production orders are a weekly chore, we can show how an LN-aware agent lists them with the blocking reason, read-only, from your own data.

Get Infor LN and Baan alerts

Support and maintenance deadlines, release changes that affect Infor LN and Baan sites, and new free Infor LN and Baan tools. A couple of emails a month at most.

Free. Unsubscribe with one click from any email.

ArchRay builder
Design the on-prem AI stack for Infor LN and Baan: model, GPUs, RAG pipeline, guardrails
See memory, speed and cost as you swap parts, then export the diagram. Free, in your browser.
Open the builder

New to Infor LN and Baan? Start with the Infor LN and Baan guide and toolkit, or plan with Training Path Builder, Upgrade Path Planner, ERP Table and Field Explorer.

Keep exploring

Free tools

ERP fixes and how-tos

Runs with your ERP

Guides

AI on your ERP

Integrations

Comparisons

Software