Other ERPsFree referencePDF, Excel, Word exportInfor XAAll Infor XA tools

Infor XA (MAPICS) AMFLIB Database File Reference

A searchable list of the 50 core Infor XA (MAPICS) physical files in library AMFLIB, grouped by application area, with what one record represents and the usual join partner. File names and descriptions are taken from the XA 9.2.0 table definition list and apply to XA 9.x and 10.

Download:
File (system name)Application areaDescriptionOne record representsTypical join partnerNotes
ITMRVA
M8E
Item revision-A
One item revision (general item data)
ITMRVB, ITMRVC, ITMSIT
Engineering view of the item; revisions sit side by side
ITMRVB
M8E
Item revision-B costing and planning info
Costing and planning data for one item revision
ITMRVA
Read with ITMRVA for the same item and revision
ITMRVC
M8E
Item revision-C purchasing information
Purchasing data for one item revision
ITMRVA, VENITF
Buyer and purchasing defaults at revision level
ITMSIT
M7X
Item Enterprise (item current revision)
The current revision of an item
ITMRVA, ITEMBL
Start here when you only need today's item data
ITEMBL
M75
Item balance file
Balance of one item in one warehouse
ITMSIT, WHSMST, SLQNTY
On-hand and related quantities by warehouse
ITMPLN
M75
Item planning information
Planning data for an item
ITEMBL, PLNORD
Used by MRP alongside REQMTS and PLNORD
PSTHDR
M8E
Product structure header
One parent item's product structure (BOM) header
PSTDTL
BOM header
PSTDTL
M8E
Product structure detail
One component line in a parent's structure
PSTHDR, ITMSIT
BOM components; explode recursively for multi-level BOMs
RTGHDR
M8E
Routing header
One routing header for an item
RTGOPR
Routing header
RTGOPR
M8E
Routing-standard operations for items
One operation in an item's standard routing
RTGHDR
Operation descriptions are held separately in RTGODS
WHSMST
M7X
Warehouse master file
One warehouse
ITEMBL, SITMST
Warehouse codes used across inventory files
SITMST
M7X
Site master
One site
WHSMST
Multi-site setups link warehouses to sites
SLDATA
M79
Location detail file
One stock location
SLQNTY
Location definitions
SLQNTY
M75
Location quantity file
Quantity of an item held at a location
SLDATA, ITEMBL
Detail behind the warehouse balance
MOMAST
M75
Manufacturing order master file
One open manufacturing order
MODATA, MOROUT
Open MOs; closed orders move to MO history
MODATA
M75
Manufacturing order detail
One component requirement on an MO
MOMAST
Pick list and material issue detail
MOROUT
M71
Open order operations detail
One operation on an open MO
MOMAST, MOTRAN
Production Control (M71) operation status
MOTRAN
M71
Shop activity transaction file
One shop floor activity transaction
MOROUT
Labour and quantity reporting against operations
MOHMST
M75
Order history-summary
One closed MO (summary)
MOHDTA, MOHRTG
History counterpart of MOMAST
MOHDTA
M75
Order history-component detail
One component line of a closed MO
MOHMST
History counterpart of MODATA
MOHRTG
M71
Order history-operations detail
One operation of a closed MO
MOHMST
History counterpart of MOROUT
MOHTRN
M71
Shop activity transaction history
One historical shop activity transaction
MOHRTG
History counterpart of MOTRAN; often large
POMAST
M75
Purchase order master file
One open purchase order header
POITEM, VENNAM
Open POs
POITEM
M75
Purchase order item detail file
One line item on an open PO
POMAST, ITMSIT
PO lines
POHSTM
M7K
Purchase order history master file
One historical PO header
POHISTI
Purchasing (M7K) history
POHISTI
M7K
Purchase order history-item file
One historical PO line
POHSTM
Note the 7-character name
VENNAM
M7X
Vendor master
One vendor
POMAST, OPNPAYM
Shared by purchasing and payables
VENITF
M7K
Vendor/item master file
One vendor and item combination
VENNAM, ITMRVC
Approved vendor and vendor item data
MBC6REP
M79
Quote/order header physical file
One customer quote or order header
MBCDREP, MBBFREP
Customer Order Management (COM) uses MBxxREP names
MBCDREP
M79
Line item physical file
One CO or quote line item
MBC6REP
COM line items
MBBFREP
M79
Customer physical file
One customer
MBC6REP, MBDEREP, OPENAR
COM customer master
MBDEREP
M79
Ship to physical file
One ship-to address for a customer
MBBFREP
Ship-to addresses
MBDHREP
M79
Shipment header physical file
One shipment
MBC6REP
Shipment header
MBF9REP
M79
Invoice header physical file
One customer invoice header
MBC6REP, OPENAR
Invoice header
MBFBREP
M79
CO history header physical file
One historical customer order header
MBDRREP
History counterpart of MBC6REP
MBDRREP
M79
CO history line item physical file
One historical CO line
MBFBREP
History counterpart of MBCDREP
IMHIST
M75
(PRE)-Inventory transaction history file
One posted inventory transaction
ITMSIT, WHSMST
Usually the largest history file; restored history goes to IMHGEN
INVTXN
M75
Transaction file
One inventory transaction
IMHIST
Inventory transaction file
GELMAS
M77
General ledger master
One GL account master record
TEMGEN
General Ledger (M77)
TEMGEN
M77
Temporary general ledger
One GL entry waiting to be posted
GELMAS
Check it is empty before period close
OPENAR
M74
Open receivables detail
One open receivable item
MBBFREP, ARHSTS
Accounts Receivable (M74)
ARHSTS
M74
Current paid item history
One paid receivable item
OPENAR
AR history
OPNPAYM
M73
Open payables invoice header
One open payables invoice
OPNPAYN, VENNAM
Accounts Payable (M73)
OPNPAYN
M73
Open payables item detail
One item detail of an open payables invoice
OPNPAYM
Invoice item detail
CHECKH
M73
Check history
One issued check
VENNAM, APHSTS
Payments history
APHSTS
M73
Current invoice payment history
One paid payables invoice
CHECKH
AP history
PLNORD
M7B
Planned order
One planned order from MRP
ITMPLN, REQMTS
MRP (M7B) output
REQMTS
M7B
Requirements physical file
One requirement used in planning
PLNORD
MRP requirements
MZF0REP
M7X
User physical file
One XA application user
MZGUCPP
XA users are defined here as well as being IBM i profiles
MZGUCPP
M7X
User security physical file
One user security entry
MZF0REP
XA application security, separate from IBM i object authority

File names and descriptions are from the Infor XA 9.2.0 table definition list (all in library AMFLIB). Key fields are deliberately not listed: run DSPFFD AMFLIB/<file> on your system for the field layout. Sites often run several environments (for example AMFLIB plus AMFLIBx libraries), and XA 10 can add files.

Map your XA environment libraries

Send us your DSPFD output for the files you report on and we will check it against this list, including any site-added files or extra environment libraries.

Optional. The tool and every export work without this. No spam.

Was this tool useful?

How to confirm a file on your system

Before you build a query, confirm the file and its layout on the IBM i that runs your environment. DSPFD AMFLIB/MOMAST shows the file description, record length, member count and number of deleted records. DSPFFD AMFLIB/MOMAST lists every field with its type, length and text, and is the only safe source for column names, which this page does not list. From SQL, QSYS2.SYSCOLUMNS and QSYS2.SYSTABLESTAT give the same information per library. If your site uses more than one environment, check which library the job's library list puts first, because the same file name can exist in several environment libraries.

  • DSPFD FILE(AMFLIB/ITEMBL): description, size, deleted records
  • DSPFFD FILE(AMFLIB/ITEMBL): field names, types, lengths
  • DSPDBR FILE(AMFLIB/ITEMBL): logical files built over the physical
  • SELECT * FROM QSYS2.SYSCOLUMNS WHERE TABLE_SCHEMA = 'AMFLIB' AND TABLE_NAME = 'ITEMBL'

Why Customer Order files are called MBxxREP

Most XA files carry readable names such as MOMAST or POITEM, but Customer Order Management (application area M79) uses generated names like MBC6REP (quote/order header), MBCDREP (line item) and MBBFREP (customer). The same pattern appears in system files such as MZF0REP (user) and MZCFREP (application exit). These files belong to the object-based parts of XA, so the physical name tells you nothing about the content. Keep this reference or the definition list at hand when reading COM programs or building order reports, and alias the files in SQL (h for MBC6REP, l for MBCDREP) so the query stays readable.

Item revision files versus ITMSIT

Engineering data in XA is revision based. ITMRVA holds general item data per revision, ITMRVB holds costing and planning data and ITMRVC holds purchasing data, so a full revision record is spread across three files. ITMSIT (Item Enterprise, item current revision) gives the current revision, which is what most reports and integrations want. Use ITMSIT for today's item master values and go to the ITMRVx files only when you need a specific or future revision, for example when checking an engineering change. Balances are separate: ITEMBL holds the item balance by warehouse and SLQNTY holds quantities by location.

History files versus open files

XA keeps open and historical records in different files. Open manufacturing orders live in MOMAST, MODATA, MOROUT and MOTRAN; once closed and moved to history they sit in MOHMST, MOHDTA, MOHRTG and MOHTRN. Purchasing has POMAST and POITEM for open orders and POHSTM and POHISTI for history. Customer orders move from MBC6REP and MBCDREP to MBFBREP and MBDRREP. Inventory transactions accumulate in IMHIST. A report covering all orders for a period therefore needs a UNION of the open and history files, and a report that reads only open files will drop recently closed orders without any error.

Frequently Asked Questions

What library holds the Infor XA tables?

The standard XA application files are in AMFLIB. Many sites also have additional environment libraries, for example a test or second company environment, that hold the same file names. Check the library list of the job or user you are querying for, and qualify the library in SQL so you do not read the wrong environment.

Where is the customer order header in MAPICS XA?

In Customer Order Management the quote and order header is MBC6REP and the line items are in MBCDREP, both in AMFLIB. Closed orders move to MBFBREP (CO history header) and MBDRREP (CO history line item). The customer master is MBBFREP and ship-to addresses are in MBDEREP.

Which file has the bill of material in Infor XA?

Product structures are held in PSTHDR (product structure header) and PSTDTL (product structure detail), application area M8E. Each PSTDTL record is one component line under a parent. For a multi-level BOM you explode recursively, for example with a recursive common table expression in Db2 for i SQL.

Why does this reference not list column names?

Field names differ by release and by site modification, and a wrong column name wastes more time than no column name. Run DSPFFD against the file in your environment, or query QSYS2.SYSCOLUMNS, to get the exact field names, types and lengths before writing SQL or an extract.

If you want planners and buyers to ask XA these questions in plain English, with read-only queries against AMFLIB on your own servers, we can set that up.

Get Infor XA alerts

Support and maintenance deadlines, release changes that affect Infor XA sites, and new free Infor XA tools. A couple of emails a month at most.

Free. Unsubscribe with one click from any email.

ArchRay builder
Design the on-prem AI stack for Infor XA: model, GPUs, RAG pipeline, guardrails
See memory, speed and cost as you swap parts, then export the diagram. Free, in your browser.
Open the builder

New to Infor XA? Start with the Infor XA guide and toolkit.

Keep exploring

Free tools

ERP fixes and how-tos

Guides

AI on your ERP

Integrations

Software