Injection Mold Gate Types Reference
The gate controls how plastic enters the cavity, so gate type changes cosmetics, stress, warpage and cycle time. This table compares common gate types and where each is normally used, so you can discuss options with your toolmaker.
| Gate type | Description | Best for | Advantages | Drawbacks | Gate removal |
|---|---|---|---|---|---|
Sprue gate | Melt flows directly from the sprue into the cavity | Single cavity, large or thick parts, round parts | Low pressure loss, simple tool, good pack | Large gate vestige, needs manual removal, stress at the gate | Manual cut or trim |
Edge gate | Rectangular gate at the parting line feeding the edge of the part | Flat parts, multi-cavity tools, general purpose parts | Easy to machine and modify, good packing, flexible location | Gate mark on part edge, runner must be removed | Manual or automatic trim |
Fan gate | Edge gate that widens like a fan across the cavity edge | Wide flat parts, thin panels, reducing warpage | Even flow front, lower shear, less orientation | Larger vestige to trim | Trim |
Film (flash) gate | Very wide thin gate along the full part edge | Thin flat parts, lenses, parts needing low warpage | Uniform fill, low orientation and stress | Large gate area to remove, hard to trim cleanly | Trim or die cut |
Tab gate | Small tab between gate and part to move shear away from the part | Parts sensitive to gate stress, clear resins, jetting prevention | Moves gate stress and jetting off the part, good surface | Extra step to remove tab | Manual trim |
Pin-point gate (three-plate) | Small round gate fed by a runner between two plates | Multi-cavity tools, center gating of cup-shaped parts | Small vestige, automatic degating, center gating possible | Three-plate mold is more complex, runner waste, higher pressure loss | Automatic when mold opens |
Submarine (tunnel) gate | Gate angled below the parting line into the part | Small to medium parts, automatic degating of runner | Automatic degating, small mark, no separate trim | Not for brittle or very stiff resins, gate wear, needs ejector design | Automatic at ejection |
Cashew (banana) gate | Curved submarine gate that enters from the ejector side | Parts that need gating on an inside surface, hidden gates | Gate mark can be hidden, automatic degating | Complex to machine, limited resin suitability | Automatic at ejection |
Ring gate | Melt flows around a core through a ring before entering the cavity | Cylindrical or tubular parts | Even filling around the part, reduces weld lines and eccentricity | Needs trimming of the ring, more material | Machined or trimmed off |
Diaphragm gate | Disc-shaped gate across the inside of a hollow part | Round hollow parts such as bottle caps or gears, concentric parts | Uniform concentric fill, no weld lines, good roundness | Disc must be removed, cut mark inside | Machined or punched off |
Hot tip gate | Hot runner nozzle with heated tip directly gating the part | High-volume parts, runnerless molding | No runner scrap, short cycle, good pack | Gate vestige or blemish, needs temperature control, not for heat sensitive resins without care | None (runnerless) |
Valve gate | Hot runner nozzle with a pin that opens and closes the gate | Cosmetic parts, large parts, sequential valve gating | Clean gate mark, control of open and close timing, helps weld line control | Higher tool cost, more maintenance, more components | None (runnerless) |
Gate type and location are best decided with flow simulation and the tool designer. This table gives general guidance and does not replace a design review.
Tool records and shot counts from your ERP
Optional: we can outline how to report tool, gate rework and shot counts from your existing systems.
Optional. The tool and every export work without this. No spam.
How to pick a gate
Start with the part shape and where a gate mark is acceptable. A cosmetic outer surface needs a hidden or very small gate, a flat panel may need a fan or film gate for even flow, and a round hollow part often uses a diaphragm or ring gate. Then consider volume and automation: if you need unattended running, a submarine or hot runner gate removes the gate without manual work. Finally check resin: brittle or glass-filled materials can break at a submarine gate and may need an edge or hot tip gate.
- Gate near the thickest section so pack reaches it
- Aim the gate at a wall to avoid jetting
- Keep flow length within what the resin and wall can fill
Size, shear and freeze time
Gate size sets shear rate and freeze time. A gate that is too small raises shear, causes blush and degrades the melt, while a gate that is too large leaves a large vestige and may not freeze quickly enough to limit pack. The gate should freeze after the part is packed but before the cycle is wasted waiting. Gate seal studies, which increase hold time and weigh the part until weight stops rising, show exactly when the gate freezes.
Hot runner and valve gates
Hot runner systems keep plastic molten up to the gate, which removes runner scrap and shortens cycle. Valve gates add a mechanical pin for clean gate marks and sequential filling, helpful for large parts and weld line control. They cost more and add maintenance, so they pay back mainly in high volume or cosmetic work. Watch for leaking, thermocouple faults and heater failures, and log these in your maintenance system.
Common mistakes
Typical errors include placing the gate where the part will be loaded and warping, gating a thin wall into a thick section so the thick area has no pack, and ignoring where weld lines will form. Changing gate size later by welding and re-cutting steel is possible but must be tracked. Document gate type, size and location on the tool drawing and the process sheet so repairs return it to the qualified condition.
Frequently Asked Questions
Which gate type avoids a visible gate mark?
Submarine and cashew gates on a hidden surface, and hot runner valve gates, leave small or hidden marks. The right choice depends on the part geometry, the resin and acceptable cosmetic standards.
What is the purpose of a tab gate?
A tab gate moves the high shear and jetting at the gate away from the functional surface of the part. The tab is removed after molding, which adds a trimming step but improves surface quality and reduces stress.
How do I know when the gate has frozen?
Run a gate seal study: increase hold time in steps and weigh the parts. When part weight stops increasing, the gate has frozen. Use a hold time slightly above that point to avoid wasting cycle time.
Why choose a three-plate mold?
Three-plate molds allow pin-point gating almost anywhere on the part surface and automatic separation of the runner. They cost more and generate runner scrap, so teams compare them with hot runners.
If you want gate seal, scrap and cycle data from the press tied to the tool record in your ERP, Netray can help you build that reporting inside your own environment.
Related Tools
Mold Steel Grades Selection Reference
Common mold steels and cavity materials with typical working hardness and the situations where each is normally chosen.
Quality & InspectionInjection Molding Defects, Causes and Fixes Reference
A searchable troubleshooting table for common molded part defects, with the usual causes and the first adjustments to try.
Discrete ManufacturingInjection Molding Cooling Time Calculator
Estimate the cooling time of a molded part from wall thickness, resin thermal diffusivity, melt, mold and ejection temperatures, and see how it drives total cycle time.
MES & Shop FloorScientific Molding Viscosity Curve Worksheet
Log a rheology (viscosity curve) study at several injection speeds and see relative viscosity and shear rate index calculated per run.
Quality & InspectionMolded Part First Article Inspection Report Template
A fill-in first article report for molded parts covering material, mold, cavity measurements and approval.
More Engineering & PLM tools
See all- Injection Mold Cavitation Optimizer (Total Cost per Part)
- Mold Cooling Channel Reynolds Number, Flow and Heat Removal Calculator
- SAP Super BOM Design Worksheet
- SAP Engineering Change Number Checklist
- SAP Document Info Record Template
- SAP Change Master and Revision Level Log
- SAP Engineering Change Request (ECR) Template
- SAP BOM Usage and Item Category Reference
- SAP Engineering Change Obsolescence Exposure Calculator
Keep exploring
Free tools
- Injection Mold Maintenance ChecklistA practical preventive maintenance checklist for injection molds, from daily checks at the press to full overhaul and storage.
- Mold Steel Grades Selection ReferenceCommon mold steels and cavity materials with typical working hardness and the situations where each is normally chosen.
- Injection Mold Qualification Report TemplateA fill-in IQ, OQ and PQ style report for qualifying a new or transferred injection mold, with process window and capability tables.
Guides
- Injection Molding Production Scheduling: Matching Molds, Presses and ResinHow to schedule injection molding: match molds to presses by tonnage and shot size, plan changeovers and resin drying, and keep capacity honest with real cycle data.
- Best ERP for Injection Molders: What to Check Before You BuyWhat to look for in ERP for injection molders: mold and press tracking, resin lots, MES integration, scrap and regrind, and how DELMIAworks, Plex and Epicor compare.
- Scientific Molding Documentation: What Records to Keep and WhereScientific molding documentation for injection molders: viscosity curves, gate seal, pressure drop, process windows, decoupled molding records and how to store them.
AI on your ERP
- AI on Infor SyteLine for Plastics Injection Molders: Presses, Molds, Resin and ScrapAI on Infor SyteLine for injection molders: mold and press scheduling, resin and regrind lots, scrap and cycle variance, on-prem and read-only by default.
- Epicor Kinetic AI for Injection Molders: Resin, Tooling, Scrap and Cycle Time Questions AnsweredPrivate AI on Epicor Kinetic for injection molders: query resin lots, tooling, scrap and cycle-time variance in plain English, with the query shown.
Manufacturing hubs
- Ningbo and Yuyao, Zhejiang: Molds, Plastics and Hardware ManufacturingGuide to Ningbo and Yuyao manufacturing: mold making, injection molding and hardware, the port, typical ERP and quoting problems, and where private AI helps.
- Plastics Industry Association (PLASTICS): Molders, Processors and ERP RealitiesHow injection molders and plastics processors work in the PLASTICS ecosystem: NPE, safety standards, quoting, ERP and MES, and private AI on shop data.