Scientific Molding Viscosity Curve Worksheet
A viscosity curve shows how easily the resin flows at different injection speeds, and it guides which fill speed makes a stable process. Record each run here, compute relative viscosity and a shear rate index, and export the data to plot your curve in Excel.
| Run | Injection speed setting (mm/s) | Fill time (s) (s) | Peak injection pressure (bar) (bar) | Relative viscosity (bar x s) | Shear rate index (1/s) | Part weight (g) | Observations | |
|---|---|---|---|---|---|---|---|---|
2,400 | 0.25 | |||||||
1,920 | 0.3333 | |||||||
1,420 | 0.5 | |||||||
1,155 | 0.6667 | |||||||
880 | 1 | |||||||
760 | 1.25 | |||||||
630 | 1.6667 |
Relative viscosity here is fill time multiplied by peak injection pressure, a common scientific molding index. Plot viscosity (y) against shear rate index (x) and choose a fill speed on the flat part of the curve, where viscosity is least sensitive to speed. Keep melt temperature, transfer position and tool the same across all runs, and fill 95 to 99 percent in velocity control, then complete the fill with pack.
Store process studies with tool and lot data
Optional: we can outline how to keep process study results linked to tool and resin lot records.
Optional. The tool and every export work without this. No spam.
How to run the study
Fill the cavity to about 95 to 99 percent with velocity control only, with pack and hold off, at a series of injection speeds from slow to fast. Record the fill time and peak injection pressure for each run. Keep melt temperature, transfer position and back pressure constant. Let each setting stabilize for several shots before recording. Enter the numbers in the table, and the worksheet calculates relative viscosity as fill time multiplied by peak pressure and a shear rate index as one divided by fill time.
- Stop pack and hold so only the fill phase is measured
- Use the same tool, resin lot and melt temperature
- Record part weight to confirm the fill is consistent
Reading the curve
Plot relative viscosity against the shear rate index. Most thermoplastics are shear thinning, so viscosity falls as speed rises, then flattens. Choose a fill speed on the flat part of the curve, where small speed changes barely change viscosity, which makes the process robust against variation in melt temperature and material. Avoid the steep slow-speed region, where viscosity changes quickly with speed, and avoid speeds so high that flash, burning or shear damage begin.
Using the result in your process
Once you pick the speed, document it in the process sheet along with the viscosity curve and the date. Repeat the study when you change resin grade, lot, tool or machine, and compare curves over time to detect material variation. A shift in the curve between lots may mean a melt flow difference, which you can correlate with resin lot data in your quality or ERP system.
Common mistakes
Frequent errors are mixing pack effects into the fill measurement, changing melt temperature between runs, using the set speed instead of measured fill time, and choosing the fastest speed because pressure looks lower. Pressure behavior differs from viscosity, so decide using the viscosity curve. Remember the index is relative, not an absolute material property, so compare only runs from the same tool and machine.
Frequently Asked Questions
What is relative viscosity in scientific molding?
It is an index calculated as fill time multiplied by peak injection pressure. It is not an absolute viscosity, but it shows how resistance to flow changes with injection speed on the same tool and machine.
Which fill speed should I choose?
Choose a speed on the flat part of the viscosity curve, where viscosity changes little with speed. That gives a robust process. Also confirm that the part has no flash, burning or visible shear problems at that speed.
Why must I turn off pack and hold?
Pack and hold add pressure after fill and distort the pressure and time readings. A study of the fill phase alone, at about 95 to 99 percent fill, shows how the melt flows, which is what the curve is meant to capture.
Can I compare curves from different machines?
Only with care. The index depends on pressure measurement, screw geometry and tool, so compare curves from the same tool and press. Use curves from different machines as a guide only.
If you want process studies stored with the tool and resin lot in your ERP or MES, Netray can help you structure and query them on your own network.
Related Tools
Injection Molding Process Sheet Template
A fill-in setup sheet that records the validated process window for a mold, press and resin, ready to print or export.
Discrete ManufacturingInjection Molding Cooling Time Calculator
Estimate the cooling time of a molded part from wall thickness, resin thermal diffusivity, melt, mold and ejection temperatures, and see how it drives total cycle time.
Discrete ManufacturingThermoplastic Resin Processing Temperature and Shrinkage Reference
Typical processing windows, drying needs and shrinkage ranges for common injection molding resins, in a searchable table.
Quality & InspectionInjection Molding Defects, Causes and Fixes Reference
A searchable troubleshooting table for common molded part defects, with the usual causes and the first adjustments to try.
MES & Shop FloorMolding Shift Production Report Template
A shift report for a molding department capturing output, downtime, scrap and issues for the next shift.
More MES & Shop Floor tools
See all- Mold Changeover Time Log Worksheet
- Injection Press Startup and Shutdown Checklist
- Injection Molding Press Selection Worksheet (Tonnage and Shot Utilization)
- Oracle Fusion OEE Work Center Calculator
- Infor VISUAL Shop Labor Ticket Log Worksheet
- VISUAL Shop Load Versus Capacity Calculator
- VISUAL Shop Resource Capacity and Load Calculator
- IFS Shop Order Status and Lifecycle Reference
- Plex Smart Manufacturing Data Source Request Template
Keep exploring
Free tools
- Injection Molding OEE CalculatorCalculate availability, performance, quality and overall equipment effectiveness for a molding press from a shift or day of production data.
- Molding Shift Production Report TemplateA shift report for a molding department capturing output, downtime, scrap and issues for the next shift.
- Injection Molding Process Sheet TemplateA fill-in setup sheet that records the validated process window for a mold, press and resin, ready to print or export.
Guides
- Scientific Molding Documentation: What Records to Keep and WhereScientific molding documentation for injection molders: viscosity curves, gate seal, pressure drop, process windows, decoupled molding records and how to store them.
- Injection Molding Job Costing: Finding Where Quoted Margin DisappearsHow injection molders find margin leaks: compare quoted and actual cycle, scrap, resin and downtime by job and part, and fix machine rates and overhead.
- How to Quote Injection Molding Jobs FasterHow injection molders cut RFQ turnaround: standard cost build-up, cycle time and press selection rules, resin pricing, and where AI drafts quotes for review.
AI on your ERP
- AI on Infor SyteLine for Plastics Injection Molders: Presses, Molds, Resin and ScrapAI on Infor SyteLine for injection molders: mold and press scheduling, resin and regrind lots, scrap and cycle variance, on-prem and read-only by default.
- Epicor Kinetic AI for Injection Molders: Resin, Tooling, Scrap and Cycle Time Questions AnsweredPrivate AI on Epicor Kinetic for injection molders: query resin lots, tooling, scrap and cycle-time variance in plain English, with the query shown.