Discrete ManufacturingFree referencePDF, Excel, Word exportPlastics

Injection Molding Process Values and Calculations (PDF Reference)

Setting up or quoting an injection molding job needs a handful of numbers over and over: clamp tonnage, shot size, pressures, cooling time and drying conditions. This reference collects them in one searchable table with the formula, a typical range and the unit, and exports to PDF or Excel for the floor.

Download:
ParameterFormula or ruleTypical value or rangeUnitNote
Clamp force required
Projected area x cavity pressure x number of cavities
2 to 5 for general parts
US tons per sq in of projected area
Thin wall and long flow paths need more. Add a margin and check the machine rating.
Clamp utilization
Required clamp force / machine clamp force
Up to about 80 percent
percent
Running near 100 percent risks flash and mold wear.
Projected area
Part area seen in the direction of mold opening, plus runner area
Part dependent
sq in or sq cm
Include runner in cold runner molds.
Shot size (volume)
Part volume x cavities + runner volume
Part dependent
cu in or cm3
Add cushion, usually a few millimetres of screw travel.
Shot weight
Shot volume x melt density
Resin dependent
g or oz
Use melt density, which is lower than solid density.
Barrel utilization
Shot size / machine shot capacity
About 20 to 80 percent
percent
Very small shots risk long residence time and degradation.
Melt pressure
Hydraulic pressure x intensification ratio
5,000 to 20,000
psi
Ratio is machine specific. Electric machines read pressure differently.
Hold pressure
Set as a fraction of injection pressure
About 50 to 80 percent
percent of injection pressure
Set using a gate seal study.
Back pressure
Set at the screw during recovery
50 to 300
psi (hydraulic)
Higher improves mixing and color but raises shear and recovery time.
Injection time
Fill time to transfer point
0.5 to 5
s
Depends on wall thickness and flow length.
Cooling time
t = s squared / (pi squared x alpha) x ln[ 4/pi x (Tmelt - Tmold) / (Teject - Tmold) ]
Often the largest part of the cycle
s
s is wall thickness, alpha thermal diffusivity. Cooling grows roughly with the square of wall thickness.
Cycle time
Injection + hold + cooling + mold open and close + ejection + dwell
10 to 60 for typical parts
s
Cooling usually drives it. Measure with a stopwatch before estimating.
Parts per hour
3600 / cycle time x cavities
Part dependent
parts per hour
Multiply by expected yield to get good parts.
Screw recovery rate
Shot weight / recovery time
Machine rated
g/s or lb/h
Check plasticizing capacity against shot weight and cooling time.
Screw L/D ratio
Flight length / screw diameter
About 20:1
ratio
General purpose screws for common resins.
Mold shrinkage allowance
Cavity size = part size x (1 + shrinkage)
Resin and fill dependent
percent
Use the resin supplier's shrinkage data and verify with a first article.
Wall thickness uniformity
Keep walls even, ribs about 50 to 60 percent of nominal wall
1 to 4 mm for most parts
mm
Thick sections cause sink and long cooling.
Drying: nylon (PA6, PA66)
Hot air or desiccant dryer
About 80 C for 4 hours
C and h
Dew point near minus 40 C. Follow the supplier datasheet.
Drying: polycarbonate (PC)
Desiccant dryer
About 120 C for 3 to 4 hours
C and h
Moisture causes splay and loss of strength.
Drying: ABS
Hot air or desiccant dryer
About 80 C for 2 to 4 hours
C and h
Follow the grade datasheet.
Drying: PET
Desiccant dryer
About 150 C for 4 to 6 hours
C and h
Very sensitive to moisture.
Drying: polypropylene (PP)
Usually not required
No drying for most grades
-
Check filled and specialty grades.
Typical melt temperature: PP
Supplier datasheet range
About 200 to 250
C
Always use the datasheet range for the exact grade.
Typical melt temperature: ABS
Supplier datasheet range
About 210 to 250
C
Higher heat can discolor and degrade.
Typical melt temperature: PC
Supplier datasheet range
About 280 to 320
C
Hot, dry resin needed.
Typical melt temperature: PA66
Supplier datasheet range
About 270 to 295
C
Narrow processing window.
Typical mold temperature: PP
Supplier datasheet range
About 20 to 60
C
Hotter molds improve surface and reduce warpage but lengthen cooling.
Typical mold temperature: ABS
Supplier datasheet range
About 40 to 80
C
Affects gloss and stress.
Typical mold temperature: PC
Supplier datasheet range
About 80 to 120
C
Affects stress and surface.
Typical mold temperature: PA66
Supplier datasheet range
About 70 to 100
C
Controls crystallinity and shrinkage.
Typical shrinkage: ABS
Datasheet range
About 0.4 to 0.8
percent
Varies with grade and direction.
Typical shrinkage: PC
Datasheet range
About 0.5 to 0.7
percent
Varies with grade.
Typical shrinkage: PP
Datasheet range
About 1.0 to 2.5
percent
Semi-crystalline, direction dependent.
Typical shrinkage: PA66 unfilled
Datasheet range
About 0.8 to 2.0
percent
Glass fill lowers it, with directional differences.

Values are typical starting points and rules of thumb for general grades, not specifications. Always use the resin supplier's datasheet, the machine manual and a documented process window for the actual job.

Compare quoted and actual process values

Optional: we review how cycle times and scrap flow from the press into your ERP and how quotes could use them.

Optional. The tool and every export work without this. No spam.

Was this tool useful?

How to use the reference

Type a parameter or resin name in the search box to filter the table. Use the formula column to calculate your own job values, then compare with the typical range as a sanity check. Export to PDF to pin it at the press or to Excel to add your own materials. Treat every range as a starting point to be replaced by datasheet values and your validated process window.

  • Search by resin (PC, ABS, PA66, PP) or topic (drying, shrinkage)
  • Use ranges as a sanity check, not as a setpoint
  • Record the validated value on the process sheet

The key calculations

Clamp force is projected area multiplied by cavity pressure, then checked against machine capacity with margin. Shot size is part volume times cavities plus runner, then compared with barrel capacity. Cycle time is the sum of injection, hold, cooling, mold motion and ejection, and cooling dominates for thick walls because it grows with the square of thickness. Parts per hour is 3600 divided by cycle time, times cavities, before yield loss.

Reading the ranges

A range tells you whether a number is plausible, not whether it is right. A clamp requirement of 0.5 tons per square inch or 12 should prompt a recheck of area units. Melt and mold temperatures vary by grade, fillers and wall thickness, so use the supplier's window. Drying matters most for hygroscopic resins such as nylon, polycarbonate and PET, where moisture causes splay, brittleness and viscosity loss.

  • Check units first when a result looks off by ten times
  • Hygroscopic resins need drying before every run
  • Verify shrinkage with a first article before cutting steel

Common mistakes

Frequent errors include forgetting runner area in the projected area, using solid density for shot weight, running a press at full tonnage, and copying a melt temperature from another grade. Another is quoting from the cycle time of a similar part rather than from a calculated cooling time. Record actual cycle times and scrap in the ERP so future quotes use real data.

Frequently Asked Questions

What is the formula for clamp tonnage in injection molding?

Clamp force equals the projected area of the part and runner multiplied by the cavity pressure, with a safety margin. A common starting point is 2 to 5 US tons per square inch of projected area, higher for thin walls and long flow paths.

How do I estimate injection molding cooling time?

Cooling time depends on wall thickness squared, the resin's thermal diffusivity and the melt, mold and ejection temperatures. The result is a starting estimate; confirm it with a trial and adjust for part geometry and mold cooling.

Are these values valid for every resin grade?

No. They are typical ranges for general grades. Filled, flame retardant and specialty grades differ, so always use the supplier datasheet and the process window validated on your machine and mold.

Can I get this as a PDF?

Yes. Use the export button to save the table as a PDF for the press, or as Excel to add your own materials and notes.

If your actual cycle times and scrap sit in the ERP and MES, we can help you build a private assistant on your own servers that compares quoted and actual process values by mold.

Get ERP alerts and new tools

Support deadlines, release changes and new free tools for the ERP you run. A couple of emails a month at most.

Free. Unsubscribe with one click from any email.

ArchRay builder
Design the on-prem AI stack: model, GPUs, RAG pipeline, guardrails
See memory, speed and cost as you swap parts, then export the diagram. Free, in your browser.
Open the builder

Keep exploring

Free tools

Guides

AI on your ERP

Manufacturing hubs