Thermoplastic Resin Processing Temperature and Shrinkage Reference
Choosing starting settings for a new resin means knowing its typical melt temperature, mold temperature, drying requirement and shrinkage. This table puts those ranges for common thermoplastics in one searchable place so you can plan a trial or sanity check a setup.
| Resin | Abbreviation | Typical melt temp (F) | Typical mold temp (F) | Typical shrinkage (%) | Drying before molding | Structure |
|---|---|---|---|---|---|---|
Polypropylene | PP | 390-500 | 70-140 | 1.0-2.5 | Not normally required | Semi-crystalline |
High-density polyethylene | HDPE | 400-500 | 60-140 | 1.5-4.0 | Not normally required | Semi-crystalline |
Low-density polyethylene | LDPE | 330-450 | 70-110 | 1.5-5.0 | Not normally required | Semi-crystalline |
General purpose polystyrene | GPPS | 360-480 | 50-120 | 0.4-0.7 | Not normally required | Amorphous |
High-impact polystyrene | HIPS | 375-500 | 50-130 | 0.4-0.8 | Not normally required | Amorphous |
Acrylonitrile butadiene styrene | ABS | 410-520 | 100-180 | 0.4-0.7 | About 180 F for 2-4 h | Amorphous |
Styrene acrylonitrile | SAN | 400-500 | 100-180 | 0.3-0.7 | About 180 F for 2-3 h | Amorphous |
Polycarbonate | PC | 520-620 | 160-220 | 0.5-0.7 | About 250 F for 3-4 h | Amorphous |
Polycarbonate / ABS blend | PC/ABS | 450-550 | 120-180 | 0.5-0.7 | About 200-230 F for 3-4 h | Amorphous |
Polymethyl methacrylate (acrylic) | PMMA | 400-500 | 120-180 | 0.2-0.8 | About 170-185 F for 3-4 h | Amorphous |
Nylon 6 | PA6 | 480-540 | 150-200 | 0.7-1.5 | About 175 F for 4-6 h (dry as molded) | Semi-crystalline |
Nylon 66 | PA66 | 520-570 | 150-200 | 0.8-1.5 | About 175 F for 4-6 h (dry as molded) | Semi-crystalline |
Polybutylene terephthalate | PBT | 450-500 | 120-180 | 1.2-2.0 | About 250 F for 3-4 h | Semi-crystalline |
Polyethylene terephthalate | PET | 500-550 | Varies by grade and goal | 1.2-2.0 | About 250-300 F for 4-6 h | Semi-crystalline |
Acetal copolymer | POM | 360-440 | 120-200 | 1.8-2.2 | Usually not required, check supplier | Semi-crystalline |
Thermoplastic polyurethane | TPU | 380-430 | 70-120 | 0.5-1.5 | About 180-200 F for 2-3 h | Elastomer |
Modified polyphenylene ether | PPE/PPO | 480-600 | 150-210 | 0.5-0.7 | About 200-220 F for 2-4 h | Amorphous |
Polyphenylene sulfide | PPS | 580-650 | 275-325 | 0.2-1.0 | About 300 F for 3 h | Semi-crystalline |
Polyether ether ketone | PEEK | 700-750 | 340-400 | 1.0-1.3 | About 300 F for 3 h | Semi-crystalline |
Rigid polyvinyl chloride | PVC | 340-400 | 70-120 | 0.2-0.6 | Not normally required, avoid long residence | Amorphous |
Values are typical ranges for unfilled general grades and are for planning only. Glass or mineral filled grades shrink less, and fiber orientation makes shrinkage different along and across flow. Always use the resin supplier's datasheet for the exact grade, and validate with a measured sample from your tool.
Tie resin lots and drying records to quality data
Optional: we can sketch how to connect resin lot, dryer log and scrap records in your ERP or MES.
Optional. The tool and every export work without this. No spam.
How to use these ranges
Find your resin by name or abbreviation and use the ranges as a starting window, not a recipe. Start in the middle of the melt range, set the mold temperature near the recommended value, and adjust from there during the trial. Check the drying column before the material goes near the press, since wet nylon, PC or PET produces splay and loses strength. The datasheet for your specific grade always has the final say, especially for flame retardant, glass filled or high flow grades.
- Start mid-range and adjust in small steps
- Dry hygroscopic resins before molding, using a desiccant dryer with a dew point check
- Record the actual settings in your process sheet for repeat runs
Understanding shrinkage
Shrinkage is the difference between the cavity dimension and the cooled part, expressed as a percent. Semi-crystalline resins such as PP, HDPE, POM and PA shrink more than amorphous resins such as ABS, PC and PS because crystals pack more densely as they form. Shrinkage also rises with thicker walls, higher mold temperature and lower pack pressure, and varies with direction when fibers or flow orientation are present. Mold designers use the shrinkage value to size the cavity: cavity size is roughly part size divided by (1 minus shrinkage).
Amorphous versus semi-crystalline
Amorphous resins soften gradually and are generally dimensionally stable with lower shrinkage. Semi-crystalline resins melt sharply, need enough heat to form crystals, and tend to be tougher and more chemically resistant but more prone to warpage. The distinction also affects mold temperature: higher mold temperature raises crystallinity, improves surface and stability, but lengthens cooling. Use the Structure column to remind yourself which behavior to expect.
Common mistakes
Typical errors include using one shrinkage value for every direction and wall thickness, skipping drying because the bag looks sealed, and running the barrel at the top of the range with a long residence time. Degraded resin shows up as splay, black specks or brittle parts. Match shot size to barrel capacity so material does not sit too long, and purge when you change resins with incompatible temperature ranges.
Frequently Asked Questions
Are these values exact for my resin grade?
No. They are typical ranges for general unfilled grades. Filled, flame retardant and high-flow grades differ. Use the supplier datasheet for the exact melt temperature, mold temperature, drying and shrinkage of your grade.
Why do semi-crystalline resins shrink more?
As they cool, molecules arrange into crystals that pack more densely than the amorphous melt, which reduces volume. Amorphous resins lack this ordered structure, so they shrink less and are generally more stable.
Do I need to dry polypropylene?
Normally no. PP absorbs very little moisture. Hygroscopic resins like nylon, PC, PET, PBT and ABS do need drying. If the supplier states a moisture limit, measure it rather than guessing.
How do I calculate cavity size from shrinkage?
A common approximation is cavity dimension equals part dimension divided by (1 minus shrinkage as a fraction). For a 100 mm part with 1.5 percent shrinkage, the cavity is about 101.52 mm. Validate with a measured trial because real shrinkage depends on process.
If you track resin lots, dryer settings and process parameters in your ERP or MES, Netray can help you connect them to scrap and quality results on-premises.
Related Tools
Resin Lot and Dryer Log Worksheet
Record resin lots, dryer settings and drying hours, and see at a glance which lots were under dried.
Discrete ManufacturingInjection Molding Cooling Time Calculator
Estimate the cooling time of a molded part from wall thickness, resin thermal diffusivity, melt, mold and ejection temperatures, and see how it drives total cycle time.
Industry TemplatesInjection Molding Process Sheet Template
A fill-in setup sheet that records the validated process window for a mold, press and resin, ready to print or export.
Quality & InspectionInjection Molding Defects, Causes and Fixes Reference
A searchable troubleshooting table for common molded part defects, with the usual causes and the first adjustments to try.
MES & Shop FloorScientific Molding Viscosity Curve Worksheet
Log a rheology (viscosity curve) study at several injection speeds and see relative viscosity and shear rate index calculated per run.
More Discrete Manufacturing tools
See all- OEE Calculator (Overall Equipment Effectiveness)
- Scrap Rate Cost Calculator
- Takt Time Calculator
- Cycle Time & Capacity Calculator
- Inventory Carrying Cost Calculator
- Economic Order Quantity (EOQ) Calculator
- MRP Nervousness Assessment
- Production Scheduling Maturity Assessment
- Shop Floor Digitization Scorecard
Keep exploring
Free tools
- Resin Drying Time and Temperature ReferenceTypical drying temperature, time and maximum moisture for common injection molding resins, in a table you can search and export.
- Injection Molding Process Values and Formulas ReferenceSearchable reference of key injection molding parameters, formulas and typical ranges, including clamp tonnage, pressure, cooling time, drying and shrinkage, exportable to PDF.
- Injection Molding Process Sheet TemplateA fill-in setup sheet that records the validated process window for a mold, press and resin, ready to print or export.
Guides
- Injection Molding Production Scheduling: Matching Molds, Presses and ResinHow to schedule injection molding: match molds to presses by tonnage and shot size, plan changeovers and resin drying, and keep capacity honest with real cycle data.
- Handling Resin Price Increases in Injection Molding QuotesHow injection molders handle resin price swings in quotes: index clauses, quote validity, material surcharges, pass-through rules and ERP price tracking.
- AI for Injection Molding RFQ Review: From Package to Draft QuoteHow AI reads molding RFQ packages: extracting resin, tolerances, volumes and secondary ops, finding similar parts in your ERP, and drafting quotes for estimator review.
AI on your ERP
- AI on Infor SyteLine for Plastics Injection Molders: Presses, Molds, Resin and ScrapAI on Infor SyteLine for injection molders: mold and press scheduling, resin and regrind lots, scrap and cycle variance, on-prem and read-only by default.
- Epicor Kinetic AI for Injection Molders: Resin, Tooling, Scrap and Cycle Time Questions AnsweredPrivate AI on Epicor Kinetic for injection molders: query resin lots, tooling, scrap and cycle-time variance in plain English, with the query shown.