Mold Shrinkage Calculator: Cavity Dimension from Part Dimension
Plastic parts come out of the mold smaller than the cavity because the resin shrinks as it cools. This calculator turns a nominal part dimension and a shrinkage rate into the cavity dimension to machine, and shows how much of your tolerance the shrink variation uses up.
Your numbers
The finished dimension on the part drawing.
From the resin datasheet or your own molded data. Unfilled semi-crystalline resins are usually higher than amorphous or glass-filled grades.
Lot to lot and process variation you expect around the mean shrink rate.
Half of the total tolerance band on the drawing.
Your results
Shrinkage depends on gate location, wall thickness, packing, mold temperature and fiber orientation. Use as a starting point and confirm with sample parts.
Shrink allowance (mm) vs shrink rate
Sweeps Resin shrinkage rate from 0.2 to 3, holding your other inputs fixed.
Capture measured shrink data from your ERP
Optional: we can review how your inspection results are stored and show how to build a shrink history per mold and resin lot.
Optional. The tool and every export work without this. No spam.
How to use it
Enter the finished dimension from the drawing, the shrinkage rate from the resin datasheet (or from your own measured parts), the variation you expect around that rate, and the plus or minus tolerance. The cavity dimension is the main result. Run it per critical dimension, because shrink differs in the flow direction and across it, and a long dimension sees more absolute shrink than a short one.
- Use the mean shrink rate for the molding conditions you will run in production
- Enter tolerance as one side only, for example 0.3 for a 0.6 mm band
- Check the tolerance consumed figure before committing to steel
The formula
Shrinkage S is defined against the cavity: S = (cavity - part) / cavity. Solving for the cavity gives cavity = part / (1 - S). Many shops use the shortcut cavity = part x (1 + S), which is fine for small S and short dimensions but understates the cavity slightly. At 1.5 percent shrink on 120 mm the exact value is 121.83 mm and the shortcut gives 121.80 mm. Mold designers also cut critical features steel-safe so they can be opened up after the first samples.
Reading the tolerance figure
Shrink variation is a process-driven error that tooling cannot remove. If a dimension swings by 0.24 mm from shrink alone and your tolerance is 0.3 mm, 80 percent of the band is gone before measurement error, tool wear and warpage are counted. When the consumed figure approaches or exceeds 100 percent, options are a lower-shrink or filled resin, tighter process control, a different gate location, or a conversation about the tolerance.
Common mistakes
Using the datasheet shrink for a different wall thickness is the usual error, because thick sections shrink more. Others are ignoring post-mold shrinkage in nylons that absorb moisture, applying one rate to both flow and cross-flow directions in glass-filled resins, and forgetting that the shrink allowance applies to hole and boss dimensions in the opposite sense: pins and cores are cut smaller for holes to end up at size.
- Measure parts 24 hours after molding for stable readings
- Record the shrink actually achieved in your ERP item master notes
- Re-run when the resin grade or supplier changes
Frequently Asked Questions
What is a typical shrinkage rate for injection molded plastics?
Amorphous resins such as ABS and polycarbonate are often around 0.4 to 0.8 percent. Semi-crystalline resins such as polypropylene and polyethylene are commonly 1 to 2.5 percent. Glass fiber filling usually lowers it. Always confirm with the datasheet for your exact grade.
Why is the exact formula different from part times one plus shrink?
Shrinkage is defined as the loss relative to the cavity size, not the part size. Dividing by one minus S accounts for that. The gap is tiny at low shrink rates and short dimensions but grows with larger parts and higher shrink resins.
Does shrinkage differ in flow and cross-flow directions?
Yes, especially in fiber filled or highly oriented resins. Fibers align with flow and restrict shrink in that direction, so cross-flow shrink is often higher. Mold designers use separate rates per direction where the datasheet supplies them.
Can I use this for rubber or die casting?
The same relationship applies to any process where the part shrinks from a cavity, but the shrink rates, temperatures and units are different. Enter the rate for your material and treat the result as a starting point.
If your molding data lives in an ERP or MES, Netray can pull measured part dimensions and lot data into a shrink history so the next tool is cut on your own numbers.
Related Tools
Injection Molding Cooling Time Calculator
Estimate the cooling time of a molded part from wall thickness, resin thermal diffusivity, melt, mold and ejection temperatures, and see how it drives total cycle time.
Discrete ManufacturingBarrel Residence Time Calculator
Estimate how long resin sits in the barrel and how much of the machine capacity a shot uses, to spot degradation risk from oversized presses.
Quality & InspectionInjection Molding Defects Troubleshooting Guide
A searchable table of common injection molding defects with the usual causes and the first thing to check, grouped by process area.
MES & Shop FloorMolding Process Window Study Record Template
A fill-in record for the approved process and a low, nominal, high process window study on a mold and machine combination.
More Discrete Manufacturing tools
See all- Injection Molding Process Values and Formulas Reference
- OEE Calculator (Overall Equipment Effectiveness)
- Scrap Rate Cost Calculator
- Takt Time Calculator
- Cycle Time & Capacity Calculator
- Inventory Carrying Cost Calculator
- Economic Order Quantity (EOQ) Calculator
- MRP Nervousness Assessment
- Production Scheduling Maturity Assessment
Keep exploring
Free tools
- Mold Steel Grades Selection ReferenceCommon mold steels and cavity materials with typical working hardness and the situations where each is normally chosen.
- Thermoplastic Resin Processing Temperature and Shrinkage ReferenceTypical processing windows, drying needs and shrinkage ranges for common injection molding resins, in a searchable table.
- Injection Molding Clamp Tonnage CalculatorEstimate the clamp force a mold needs from projected area, cavity count and average cavity pressure, and see which press size fits.
ERP fixes and how-tos
- Business Central: "Select a Dimension Value Code for the Dimension Code"Fix 'Select a Dimension Value Code for the Dimension Code' in Business Central: Default Dimensions, Value Posting settings, priorities and blocked combinations.
- Infor M3 chart of accounts: structure and setupHow the Infor M3 chart of accounts works: account as dimension 1, accounting dimensions, accounting control objects, and a safe order to set it up.
- Dynamics 365 Supply Chain Traceability: Lot and Serial Tracking for RecallsSet up lot (batch) and serial traceability in Dynamics 365 Supply Chain Management: tracking dimension groups, item tracing and how to run a recall trace.
Guides
- Injection Molding Production Scheduling: Matching Molds, Presses and ResinHow to schedule injection molding: match molds to presses by tonnage and shot size, plan changeovers and resin drying, and keep capacity honest with real cycle data.
- Best ERP for Injection Molders: What to Check Before You BuyWhat to look for in ERP for injection molders: mold and press tracking, resin lots, MES integration, scrap and regrind, and how DELMIAworks, Plex and Epicor compare.
- Casting Defect Root Cause: Porosity, Shrinkage and Scrap AnalysisFind root causes of porosity, shrinkage, cold shuts and inclusions by linking scrap to heat, die, pattern, shift and process data, and use AI to spot patterns.
AI on your ERP
- AI on Infor SyteLine for Plastics Injection Molders: Presses, Molds, Resin and ScrapAI on Infor SyteLine for injection molders: mold and press scheduling, resin and regrind lots, scrap and cycle variance, on-prem and read-only by default.
- Epicor Kinetic AI for Injection Molders: Resin, Tooling, Scrap and Cycle Time Questions AnsweredPrivate AI on Epicor Kinetic for injection molders: query resin lots, tooling, scrap and cycle-time variance in plain English, with the query shown.
Manufacturing hubs
- Plastics Industry Association (PLASTICS): Molders, Processors and ERP RealitiesHow injection molders and plastics processors work in the PLASTICS ecosystem: NPE, safety standards, quoting, ERP and MES, and private AI on shop data.
- Ningbo and Yuyao, Zhejiang: Molds, Plastics and Hardware ManufacturingGuide to Ningbo and Yuyao manufacturing: mold making, injection molding and hardware, the port, typical ERP and quoting problems, and where private AI helps.