Inventory Planning Parameter Governance Checklist

Most inventory problems trace back to parameters that nobody owns: a lead time set years ago, a safety stock copied from another plant, a mass update with no approval. This checklist covers ownership, data quality, review and change control.

0%

0 of 30 items complete

7 critical items still open - these are the highest-risk gaps.

Download checklist:

Ownership and policy

Data quality

Calculation and review

Change control and audit

Performance feedback

Count the items you can answer yes to. Critical items are the ones that cause the largest real problems when missing; fix those before anything else.

Parameter exception scan

Optional: an automated scan of your item master for the issues above.

Optional. The tool and every export work without this. No spam.

How to use the checklist

Work through each group with the planning lead and the ERP administrator. Tick the items that are true today, not those that are planned. Critical items are marked because their absence tends to produce visible failures such as stockouts, wrong order quantities or unexplained changes. Export the result as the baseline for an improvement plan.

  • Do it with two people to avoid optimistic answers
  • Check evidence, such as a change log, for at least three items
  • Repeat every six months and compare

Why parameters need governance

MRP and reorder point logic execute whatever the master data says. If lead time is understated by a week, orders are placed late every time, and the planner works around it with expedites. If a mass update doubles safety stock for a class, inventory value rises and nobody sees why until the quarter close.

Evidence to collect

For lead time, compare the planned delivery time with the distribution of actual receipt days from purchase history. For safety stock, compare the value with calculated need at the target service level. For change control, pull a change log for a month and trace two changes back to approval. These checks take little time and show whether the process works.

Common mistakes

Treating governance as a one-time cleanup, giving everyone access to edit planning fields, and adjusting values without recording the reason. Another is optimizing each parameter alone: raising safety stock to hide a bad lead time only masks the cause and ties up cash.

Frequently Asked Questions

How often should planning parameters be reviewed?

Fast moving and critical items monthly, the rest quarterly or twice a year. Lead times need a review at least every six months or whenever a supplier changes, since they feed safety stock directly.

Who should own safety stock values?

Usually the planner for the item group, under a policy set by the supply chain manager. Finance should be informed of large changes because they alter inventory value and the working capital position.

Do I need approvals for every change?

No. Use a threshold, for example any change above a set percentage or any mass update, to require a second approval. Small corrections by the planner can follow the normal log.

Is this specific to one ERP?

No. The checks apply to any ERP with planning parameters, including SAP, Oracle, Infor, Epicor, Dynamics and NetSuite. The place where changes are logged differs by system.

Netray can build read-only checks that scan your item master for the issues in this checklist and list the exceptions for planner review.