Supply Chain & InventoryFree referencePDF, Excel, Word exportSAP

Inventory Planning Glossary with Formulas and SAP MARC Fields

Planners, buyers and ERP consultants use the same words with slightly different meanings. This glossary pins down each inventory planning term with a working formula and, for SAP shops, the exact MARC field where the value lives.

Download:
TermMeaningFormula or ruleSAP field (MARC)
Safety stock
Buffer held to absorb demand and supply variation during replenishment
Z x sigma(demand over lead time)
EISBE
Reorder point
Stock level that triggers a replenishment order
Average daily demand x lead time + safety stock
MINBE
MRP type
Planning method key: MRP, reorder point or no planning
PD, VB, VM, VV, ND and others
DISMM
Lot size key
Rule for how requirements are grouped into order quantities
EX lot for lot, FX fixed, HB replenish to maximum
DISLS
Procurement type
Whether the item is made in house, bought or both
E in house, F external, X both
BESKZ
Planned delivery time
Calendar days from order to receipt for purchased items
Vendor lead time in days
PLIFZ
GR processing time
Working days to receive and put away after delivery
Added to planned delivery time
WEBAZ
In-house production time
Working days to make an item, independent of lot size
Fixed lead time for scheduling
DZEIT
Minimum lot size
Smallest quantity MRP will propose
Order qty = max(requirement, minimum)
BSTMI
Maximum lot size
Largest quantity in a single proposal
Larger needs split into several orders
BSTMA
Fixed lot size
Quantity ordered each time with lot size key FX
Order qty = fixed value
BSTFE
Rounding value
Order quantity is rounded up to a multiple of this value
ceil(requirement / rounding) x rounding
BSTRF
Maximum stock level
Upper level used by lot size HB replenish to maximum
Order qty = maximum - available stock
MABST
Service level
Target probability of not stocking out in a cycle
Drives the Z score for safety stock
LGRAD
MRP controller
Planner group responsible for the item
Used to filter MD04 and MD07 lists
DISPO
Special procurement key
Overrides the standard procurement, such as transfer or subcontract
Configured per plant
SOBSL
Planning time fence
Horizon in which MRP does not change firmed orders automatically
Number of workdays
FXHOR
Cycle stock
Average stock that results from ordering in lots
Order quantity / 2
n/a
Pipeline stock
Stock in transit between nodes
Demand rate x transit time
n/a
Days of supply
How long current stock lasts at the forecast rate
On hand / average daily demand
n/a
Inventory turns
How many times stock is consumed and replaced in a year
Annual COGS / average inventory value
n/a
Fill rate
Share of demand quantity shipped from stock on first request
Units shipped complete / units ordered
n/a
Economic order quantity
Order size that minimises ordering plus holding cost
sqrt(2 x D x S / H)
n/a

SAP field names are the technical names in table MARC (plant data for material) as commonly shown in the MRP views of MM02. Confirm labels in your own release before building reports.

Parameter review against live data

Optional: have your item parameters compared with actual receipts and usage.

Optional. The tool and every export work without this. No spam.

Was this tool useful?

How to use the glossary

Type a term, a formula fragment or a field name in the search box to filter the table. Use it when writing a planning policy, reviewing a material master extract or briefing a new planner. Export to Excel to hand a teammate a short reference for the fields that matter in your plant, and add your own rows for local terms.

  • Search by SAP field name to decode an extract from SE16N
  • Search by formula to find the definition behind a KPI
  • Use the n/a rows for concepts that are policy rather than master data

Terms that get confused

Reorder point and safety stock are the pair most often mixed up. Safety stock is only the buffer; the reorder point includes demand during the lead time as well. Planned delivery time (PLIFZ) is calendar days for purchased items while in-house production time (DZEIT) is working days for made items, so the two cannot be compared directly. Service level is a target probability per cycle, not the same as fill rate, which measures quantities shipped.

Reading MARC fields safely

A blank or zero in EISBE does not mean the item has no buffer policy; the plant may rely on a time based safety stock instead or on a different MRP type. Before drawing conclusions from an extract, check DISMM, DISLS and BESKZ together, because the same safety stock figure means different things under reorder point planning than under forecast based or deterministic MRP.

Common mistakes

The most common mistake is mixing units: demand per week with lead time in days, or annual cost with monthly stock. Another is treating a master data value as true without a reality check against actual receipts. Compare PLIFZ with the observed lead time from goods receipts at least once a year, and align the glossary to what your planners actually do.

Frequently Asked Questions

Is the reorder point the same as safety stock?

No. Safety stock is only the protection buffer. The reorder point is the expected demand during the replenishment lead time plus that buffer, so it is always higher than safety stock for any item that has lead time demand.

Where is safety stock stored in SAP?

In the MRP 1 view of the material master, table MARC, field EISBE. The reorder point sits in MINBE and is only used with reorder point MRP types such as VM or VB.

What is the difference between service level and fill rate?

Service level is the probability of no stockout in a replenishment cycle. Fill rate is the proportion of demand quantity met from stock. A 95 percent service level usually gives a fill rate well above 95 percent.

Can I use this outside SAP?

Yes. The meanings and formulas are system neutral. Only the last column is SAP specific, and rows marked n/a have no single master data field in any ERP.

If you want these terms checked against live material master data, Netray can build a read-only review that flags items whose parameters disagree with actual behavior.

Get ERP alerts and new tools

Support deadlines, release changes and new free tools for the ERP you run. A couple of emails a month at most.

Free. Unsubscribe with one click from any email.

ArchRay builder
Design the on-prem AI stack: model, GPUs, RAG pipeline, guardrails
See memory, speed and cost as you swap parts, then export the diagram. Free, in your browser.
Open the builder

Keep exploring