SAP ABAP Report Generator: Materials Below Safety Stock (MARC and MARD)
A quick list of materials under their safety stock is one of the most requested custom reports in SAP MM. This generator writes a plain Open SQL report joining MARC and MARD that you can adapt, test and transport.
Fill in
Report source
REPORT ZMM_BELOW_SAFETY_STOCK.
PARAMETERS: p_werks TYPE marc-werks DEFAULT '1000' OBLIGATORY,
p_dispo TYPE marc-dispo DEFAULT '001'.
TYPES: BEGIN OF ty_low,
matnr TYPE marc-matnr,
werks TYPE marc-werks,
eisbe TYPE marc-eisbe,
minbe TYPE marc-minbe,
labst TYPE mard-labst,
END OF ty_low.
DATA lt_low TYPE STANDARD TABLE OF ty_low WITH EMPTY KEY.
SELECT m~matnr, m~werks, m~eisbe, m~minbe,
SUM( d~labst ) AS labst
FROM marc AS m
INNER JOIN mard AS d
ON d~matnr = m~matnr
AND d~werks = m~werks
WHERE m~werks = @p_werks
AND m~dispo = @p_dispo
AND m~eisbe > 0
GROUP BY m~matnr, m~werks, m~eisbe, m~minbe
HAVING SUM( d~labst ) < m~eisbe
ORDER BY m~matnr
INTO CORRESPONDING FIELDS OF TABLE @lt_low
UP TO 500 ROWS.
IF lt_low IS INITIAL.
WRITE: / 'No materials below safety stock.'.
ELSE.
LOOP AT lt_low INTO DATA(ls_low).
WRITE: / ls_low-matnr, ls_low-werks, ls_low-eisbe, ls_low-minbe, ls_low-labst.
ENDLOOP.
ENDIF.Variant: include shortfall and open purchase requisition quantity
* Shortfall = safety stock - unrestricted stock LOOP AT lt_low ASSIGNING FIELD-SYMBOL(<l>). DATA(lv_short) = <l>-eisbe - <l>-labst. WRITE: / <l>-matnr, 'short by', lv_short. ENDLOOP. * Open requisitions: check table EBAN (fields MATNR, WERKS, MENGE, BSMNG, LOEKZ) * before recommending new orders, to avoid duplicates.
Requires ABAP 7.40 SP08 or later for the inline declarations and @ host variable syntax; on older releases use classic declarations. Unrestricted stock (LABST) in MARD excludes quality inspection and blocked stock. Test in a sandbox, run through your transport process and add an authority check for plant (M_MATE_WRK) before production use.
Planner-ready stock exception report
Optional: convert this select into a governed report with approvals.
Optional. The tool and every export work without this. No spam.
How to use the generator
Enter a report name in your customer namespace, the plant and the MRP controller, and a row limit. Copy the code into SE38, activate it and run it with the selection screen. Replace the WRITE statements with an ALV grid when the output goes to end users, and add an authority check before it goes anywhere near production.
- Use a Z or Y report name
- Run first in a development or quality system
- Keep the row limit while testing
How the select works
MARC holds plant level planning data including safety stock EISBE and reorder point MINBE. MARD holds stock by storage location, with unrestricted use stock in LABST. The join groups by material and plant, sums LABST over all storage locations, and keeps only rows where the sum is below EISBE. The HAVING clause compares an aggregate with a grouped column, which Open SQL allows when that column is in the group by list.
What it does not include
The report ignores stock in quality inspection (INSME), blocked stock (SPEME) and stock in transit. It also ignores open purchase orders, production orders and requisitions, so a material flagged here may already have supply coming. Use MD04 on any material you plan to act on, and cross check EBAN and EKPO for open documents.
Common mistakes
Forgetting that MARD has one row per storage location leads to counting each one separately. Selecting without a plant filter on a large system causes slow runs. Another mistake is treating time based safety stock, which uses range of coverage profiles, as if it were a fixed quantity in EISBE.
Frequently Asked Questions
Which SAP tables does this use?
MARC for plant level planning data such as EISBE, MINBE and DISPO, and MARD for storage location stock with LABST for unrestricted use. Both are standard tables in ECC and S/4HANA.
Will this work on S/4HANA?
MARC and MARD remain available as compatibility tables, but S/4HANA holds stock in MATDOC with MARD as a view in many releases. The select usually still works, so test it, and check your release notes.
Does it include stock in quality inspection?
No. Only unrestricted use stock LABST is summed. Add INSME for stock in quality inspection if your policy counts it toward safety stock.
Can I schedule it?
Yes. Create a variant and schedule the program in SM36, or send the result by email. Add an ALV output or a spool for the planners first.
Netray can turn reports like this into a read-only ERPray question that planners ask in plain language, with the select shown for review.
Related Tools
SQL Days of Supply and Coverage Query Generator
Fill in your table and column names to produce a days of supply and below-safety-stock SQL query for any relational ERP database.
Supply Chain & InventoryInventory Planning Glossary with Formulas and SAP Fields
A searchable glossary of inventory planning terms with the working formula and the matching SAP MARC material master field where one exists.
Supply Chain & InventoryInventory Planning Parameter Governance Checklist
A checklist for keeping safety stock, reorder point, lot size and lead time parameters controlled, reviewed and traceable.
Costing & FinanceInventory Write-Down Approval Memo Template
A memo for requesting approval to write down or dispose of excess and obsolete inventory, with the evidence finance and auditors expect.
More SAP tools
See all- SAP Tables for Plant, Country, Project and Business Partner
- SAP MM Fit-Gap Analysis Template with Examples
- SAP MM Standard Reports and Report T-Codes
- SAP Movement Types Reference
- SAP Purchasing Document Types Reference
- SAP MIGO Goods Receipt Checklist
- SAP GR/IR Clearing Worksheet
- SAP Release Strategy Design Template
- SAP Source List Upload Template
New to SAP HANA and Basis? Start with the SAP HANA and Basis guide and toolkit.
Keep exploring
Free tools
- SAP ECC Stock/Requirements List ABAP Generator (MD_STOCK_REQUIREMENTS_LIST_API)Enter material, plant or MRP controller and a horizon to get a report that prints the MD04 stock/requirements list, optionally only lines with exception messages.
- SAP Reorder Point and Safety Stock Field CalculatorWork out the reorder point and safety stock values to enter in the SAP MRP 1 view for reorder point planning materials.
- SAP Configurable Material Selection ABAP GeneratorFill in plant and material type to get an ABAP report that lists configurable materials and counts them by plant.
ERP fixes and how-tos
- Fix SAP Business One 'Quantity falls below zero' (-2028) on Production IssueFix 'Quantity falls below zero' (-2028) when issuing to a production order in SAP Business One: causes, negative stock settings, backflush and posting dates.
- SAP MMBE Stock Overview: How to Run It, Read It and When to Use MB52 or MD04SAP MMBE explained: how to run the stock overview by plant, storage location and batch, what each stock column means, the tables behind it, and MB52 or MD04.
- API_MATERIAL_STOCK_SRV: reading SAP stock by plant and storage location with ODataHow to call the SAP API_MATERIAL_STOCK_SRV OData service: activate it, read A_MatlStkInAcctMod, filter by plant and storage location, and fix auth errors.
AI on your ERP
- AI for ABAP Development: A Private Code LLM That Knows Your Z ObjectsUsing an LLM for ABAP on ECC and S/4HANA: what SAP's own ABAP AI covers, where a private code model helps, and how to keep transports governed.
- AI for SAP Business One Inventory: Stock, Batches, Bins and ValuationPrivate AI over SAP Business One inventory: OITW stock, batches, serials, bins and valuation. Answers grounded in live data via Service Layer or SQL views.