ISO 14224 Failure Mode Codes: Searchable Reference for CMMS Design
ISO 14224 defines a common vocabulary for collecting reliability and maintenance data, including a short list of three-letter failure mode codes. This lookup table lets you search those codes and use them as the starting point for the failure code list in your CMMS or ERP maintenance module.
| Code | Failure mode | What it means in practice | Typical equipment |
|---|---|---|---|
AIR | Abnormal instrument reading | Instrument shows a false alarm, a faulty indication or a reading that does not match the process | Transmitters, gauges, sensors |
BRD | Breakdown | Serious damage such as seizure or a major mechanical failure that stops the item | Pumps, compressors, gearboxes |
ELP | External leakage, process medium | Process fluid or gas escapes to the outside | Pumps, valves, heat exchangers |
ELU | External leakage, utility medium | Utility fluid such as lube oil, coolant or hydraulic oil escapes to the outside | Hydraulic units, gearboxes, coolers |
ERO | Erratic output | Output is unstable, hunting or oscillating | Controllers, drives, sensors |
FTC | Fail to close on demand | Item does not close when commanded | Valves, dampers, breakers |
FTF | Fail to function on demand | Item does not perform its function when called on | Safety systems, standby equipment |
FTO | Fail to open on demand | Item does not open when commanded | Valves, dampers, breakers |
FTR | Fail to regulate | Item cannot hold or adjust the controlled variable | Control valves, regulators |
FTS | Fail to start on demand | Item does not start when commanded | Motors, pumps, generators |
HIO | High output | Output is above the specified level | Pumps, generators, drives |
INL | Internal leakage | Fluid passes internally between zones that should be isolated | Valves, cylinders, heat exchangers |
LCP | Leakage in closed position | Fluid passes through a valve that is commanded closed | Isolation and control valves |
LOO | Low output | Output is below the specified level | Pumps, compressors, generators |
NOO | No output | Item runs or is energised but produces no output | Pumps, sensors, power supplies |
OHE | Overheating | Temperature exceeds the allowed limit | Motors, bearings, gearboxes |
PDE | Parameter deviation | A monitored parameter drifts outside tolerance | Instruments, process equipment |
PLU | Plugged or choked | Flow path is restricted or blocked | Filters, strainers, heat exchangers |
SER | Minor in-service problems | Small defects such as loose parts, minor leaks or discolouration that do not stop the item | Most equipment |
SPO | Spurious operation | Item operates without a command (false trip, false start) | Safety and control systems |
STD | Structural deficiency | Cracking, wear, corrosion or loss of structural integrity | Frames, supports, vessels, pipework |
STP | Fail to stop on demand | Item does not stop when commanded | Motors, pumps, conveyors |
UST | Spurious stop | Item stops without a command | Motors, compressors, drives |
VIB | Vibration | Vibration level is above the acceptable limit | Rotating equipment |
OTH | Other | A failure mode not covered by the other codes | Any |
UNK | Unknown | Failure mode could not be determined from the available information | Any |
Summary of the commonly used generic failure mode codes. ISO 14224 is a copyrighted standard: buy it for the full taxonomy, equipment class tables and data-quality rules. Descriptions here are plain-language summaries, not standard text.
Failure code design review
Optional: send us your current failure code list and we will comment on overlaps, gaps and how to map it to your ERP.
Optional. The tool and every export work without this. No spam.
How to use this table
Search by code, by symptom word such as leakage, or by equipment type. When you design failure codes for a CMMS, pick the subset that your technicians can actually tell apart at the machine. A list of 25 modes is usually the ceiling for a good drop-down: more than that and technicians choose the first item or Other.
- Filter on a symptom word to see candidate modes
- Keep the code and the plain-language name together in the CMMS drop-down
- Export to Excel to review the list with your technicians
- Remove modes that do not apply to your asset base
Failure mode, cause and mechanism are different things
A failure mode is how the item failed (for example INL, internal leakage). A failure mechanism is the physical process behind it (wear, corrosion, fatigue). A failure cause is the root reason (poor lubrication, wrong material, operating outside design). Mixing these in one code list is the most common reason failure data cannot be analysed later. Capture the mode at the work order, and the cause during the review of significant failures.
Mapping to ERP and CMMS fields
Most maintenance systems have a coded structure for this. SAP PM uses catalog profiles with code groups and codes for damage, cause and activity. Other CMMS products use problem, cause and remedy fields. Whichever you use, keep three separate fields for what was observed, why it happened and what was done, and map the ISO mode into the first one so cross-site reports line up.
Common mistakes
Teams copy a very long standard list into the system and then never use most of it. Others allow free text only, which makes Pareto charts impossible. A third mistake is treating the code as proof of root cause: the code classifies the symptom and does not replace an investigation. Review the unknown and other percentages monthly; if either is above about 15 percent of closed failures, the list or the training needs work.
Frequently Asked Questions
Do I have to buy ISO 14224 to use these codes?
You can use a simple failure code list without the standard, and this table is a plain-language summary. If you plan to share data with other sites or companies, or follow the equipment class tables and data quality guidance, you should buy the standard from ISO or your national standards body.
How many failure codes should a CMMS have?
As few as will still support analysis. Many plants do well with 15 to 30 modes, a short cause list and a short remedy list. Test the list with technicians: if two codes are routinely confused, merge them. Add detail only when someone will act on the report.
What is the difference between failure mode and failure code?
The failure mode is the concept of how the item failed. The failure code is the short label you store in the CMMS or ERP to record it. A good code list maps each code to a defined mode with a one-line description so every technician records the same thing.
Can I use these codes in SAP PM?
Yes. You can create a code group in a catalog (for example damage codes) and load the codes as entries, then assign the catalog to your notification and order types through catalog profiles. Plan the structure first, because changing codes after history exists makes trends harder to read.
If you want failure modes pulled from closed work orders in your ERP and ranked automatically, we can build that as a read-only report on your own data.
Related Tools
SAP PM Catalog and Code Group Design Worksheet
Plan code groups and codes for damage, cause, object part and activity, so failure data becomes something you can analyze.
MES & Shop FloorDowntime Reason Code Hierarchy Reference
A starter list of downtime reason codes arranged in a hierarchy, mapped to the six big losses and to planned or unplanned status.
Maintenance & ReliabilityEquipment Failure Investigation (RCFA) Report Template
A fill-in report for a significant equipment failure covering impact, timeline, cause analysis, corrective actions and sign-off, ready to export.
Maintenance & ReliabilityMTBF and MTTR From a Failure Log Python Script Generator
Name the columns in your CSV export and get a pandas script that works out MTBF, MTTR, failure count and availability for each asset.
More Maintenance & Reliability tools
See all- MTBF and MTTR Worksheet
- TPM Autonomous Maintenance CIL Standard Template
- TPM Autonomous Maintenance Standard Template
- TPM Pillars and Autonomous Maintenance 7 Steps Reference
- Preventive Maintenance Schedule Template
- Maintenance Work Order Template
- Inherent vs Operational Availability Calculator (MTBF, MTTR)
- Spare Parts Criticality Scoring Worksheet
- Maintenance Backlog Calculator (Weeks of Work and Crew Size)
Keep exploring
Free tools
- Process FMEA Failure Mode LibraryA searchable starter list of typical failure modes, effects and causes for common manufacturing processes, to seed a PFMEA brainstorm instead of starting from a blank sheet.
- Intrastat Nature of Transaction and Transport Mode Codes ReferenceA searchable reference of the EU Intrastat nature of transaction codes and mode of transport codes used when setting up ERP movement types.
- FMEA Failure Mode Brainstorm WorksheetCapture process steps, functions, failure modes, effects and causes in one structured table before you score severity, occurrence and detection.
ERP fixes and how-tos
- Dynamics 365 Supply Chain Warehouse Only Mode: What It Is and Its LimitsWhat warehouse management only mode is in Dynamics 365 Supply Chain Management, how to enable it, how orders arrive as shipment orders, and its limits.
- How to Add a Custom Field to an IFS Cloud PageStep-by-step guide to adding a custom field in IFS Cloud with configuration mode, plus data types, permission needs, upgrade safety and why a field may not show.
- SyteLine EDI or BOD inbound document fails to create a sales orderWhy an inbound EDI order or ION BOD fails to create a SyteLine sales order, and how to trace the failure through the EDI error log or ION BOD inbox to the root cause.
Guides
- SyteLine REST API Error Codes and Troubleshooting ReferenceComplete SyteLine REST API error code reference. Diagnose HTTP status codes, IDO error responses, and ION API Gateway errors in CloudSuite Industrial integrations.
- Diagnosing SyteLine Integration FailuresDiagnose SyteLine integration failures: map the message path, rule out certificate and token expiry, read ION errors, and replay safely without duplicates.
- AI Agent Failure Modes in Manufacturing and How to Catch ThemAI agent failure modes in manufacturing: silent data drift, tool-call errors, hallucinated part numbers, and the monitoring that catches them before users do.
AI on your ERP
- AI for SAP Plant Maintenance: Notifications, Work Orders, and Predictive SignalsAI grounded on SAP PM data that triages notifications, drafts work orders, standardizes failure codes, and flags predictive maintenance signals, on-prem.
- AI for IBM Maximo That Reads Your Work Orders and Failure History Without Leaving Your BoundaryAdd grounded, private AI to IBM Maximo Manage or 7.6: ask questions over work orders, assets and failure codes via the REST API, on-prem or sovereign cloud.