SAP PM Catalog and Code Group Design Worksheet
Failure data is only useful if the codes were well chosen before anyone started using them. This worksheet helps you draft the code groups and codes for each equipment class, with a way to see which failure modes matter most.
| Catalog type | Applies to equipment class | Code group | Code | Code text (max 40 characters) | Expected events per year | Typical repair (hours) | Typical cost per event | Annual cost exposure | Annual repair hours | |
|---|---|---|---|---|---|---|---|---|---|---|
$0 | 0 hrs | |||||||||
$2,700 | 24 hrs | |||||||||
$2,400 | 18 hrs | |||||||||
$0 | 0 hrs | |||||||||
$0 | 0 hrs | |||||||||
$2,700 | 24 hrs |
Catalogs are maintained with code groups (QS41) and codes (QS51 style maintenance), then combined into catalog profiles assigned to equipment or functional location types. Keep text within the 40-character code text limit and confirm transaction names in your release.
Test codes on your history
Optional: we map your past notification text to a draft code list and show how many fall into each code.
Optional. The tool and every export work without this. No spam.
How to use the worksheet
Work class by class, starting with the equipment that causes the most downtime. For each, define object parts (what failed), damage (how it showed up), cause (why) and activity (what was done). Give each code group a short name and each code a clear text of up to 40 characters. Add estimated events per year and a cost per event, and the sheet ranks cost exposure. That tells you which codes deserve the most careful definition. Export the list and use it as your configuration load sheet.
- Keep 5 to 15 codes per group, more makes operators guess
- Make damage codes observable symptoms, not diagnoses
- Keep cause codes distinct from damage codes
How catalogs work in SAP PM
Catalog types in plant maintenance include object parts, damage, cause, activities and tasks. Within a type you create code groups, and within a group the codes. A catalog profile then determines which code groups are offered for a given technical object, so a pump operator sees pump codes and not conveyor codes. Codes are chosen on notifications and in order confirmations, so the same list feeds both fault reporting and the maintenance history you analyse later.
Common mistakes
Common faults are a long, generic list shared across all equipment, an Other code that absorbs most records, and cause codes that mirror damage codes. Another is changing the codes after a year of data, which splits the history. Start with a pilot class, review the usage of each code after three months and merge or retire codes with no hits before adding the next class.
Frequently Asked Questions
What catalog types exist in SAP PM?
Standard catalog types include B for object parts, C for damage (problems), 5 for causes, A for activities and 2 for tasks. Plants can define others, so check your configuration.
How many codes should a group have?
Keep it short enough that a user can scan it quickly, often under 15. If a group needs more, split it by equipment class or by failure area.
Can I change codes later?
You can add codes at any time. Changing the meaning of an existing code corrupts history, so retire it and create a new one instead of reusing the number.
What is a catalog profile?
It is a configuration object that decides which code groups are offered on a notification for an object, and is assigned in the technical object or notification type settings.
If you already have years of free-text notifications, Netray can classify them against a draft code list on your own servers, read-only, so you can test the codes before configuring them.
Related Tools
SAP PM Breakdown Notification Request Form Template
A paper-or-PDF form that captures every field a planner needs to key a malfunction report (M2) into SAP PM, so nothing is chased by phone afterwards.
SAPSAP PM Maintenance KPI Calculator (MTBF, MTTR, Backlog)
Enter a period's breakdown hours, failures, backlog and crew data to get MTBF, MTTR, availability, planned-work share and weeks of backlog.
SAPSAP PM Measuring Point and Counter Readings Worksheet
Log counter readings for running hours or cycles, compute daily usage and the days left until a performance-based service is due.
SAPSAP PM Work Clearance and Work Permit Template
A permit-to-work form tied to a SAP maintenance order, covering isolation, hazards, authorizations and close-out signatures.
More SAP tools
See all- SAP QM Inspection Types Reference
- SAP QM Usage Decision Codes Worksheet
- SAP QM Sampling Procedure Design Template
- SAP QM Quality Notification Types Reference
- SAP Master Inspection Characteristic Upload Worksheet
- SAP QM in Procurement Setup Checklist
- SAP QM Inspection Lot Origins Reference
- SAP QM Dynamic Modification Rule Calculator
- SAP PM Maintenance BOM and Spare Parts Cost Worksheet