OracleFree calculatorPDF, Excel, Word exportJD Edwards EnterpriseOneAll JD Edwards EnterpriseOne tools

JD Edwards EnterpriseOne AI Assistant Sizing and Value Calculator

This calculator sizes an on-prem AI assistant for JD Edwards EnterpriseOne and turns the numbers into a monthly value and a simple payback. Enter users, usage, document volume and GPU cost and read off peak load, GPU count and index size.

Your numbers

users

Users with a login to JD Edwards EnterpriseOne who could use the assistant.

20 %

Share of named users who ask at least one question on a typical day. 10 to 30 percent is common after launch.

questions
tokens

Includes retrieved context sent to the model. 2,000 to 6,000 is typical with retrieval.

documents

For EnterpriseOne, count media object attachments (images, PDFs, text) plus any shared-drive documents you index.

pages
minutes

Be conservative. Count only time that would otherwise be spent searching or running a report.

$/hr
$/month

Hardware amortised over 36 months plus power, hosting and support for one data-centre GPU.

tokens/s

Aggregate batched throughput for your model and GPU. Measure it; 500 to 3,000 is a wide range.

Your results

GPUs required
1
Peak tokens per second divided by tokens per second per GPU. Add a second node for availability.
Net monthly value
$16,590
Daily active users
84
Questions per day
420
Tokens per day
1,470,000
Questions times tokens per question.
Peak concurrent requests
1
Assumes 20 percent of daily questions land in the busiest hour and an average of 20 seconds per answer.
Peak tokens per second
82
Vector index size
5.4
About 1.2 chunks per page and 6 KB per chunk (embedding plus text and metadata). Result in GB.
Hours saved per month
462 hrs
22 working days per month.
Monthly value of time saved
$20,790
Monthly GPU cost
$4,200
Simple payback on GPU hardware
9.1 months
Hardware treated as 36 times the monthly figure divided by net monthly value. Zero means no payback at these inputs.

Planning model. Peak hour share (20 percent) and 20 seconds per answer are fixed assumptions. Hours saved is the most uncertain input: measure it in a pilot before relying on the value figures. Excludes implementation, licences, staff and storage costs.

Free, optional. Reopen it on any device.
Save results:

Monthly value and GPU cost vs named users

Sweeps Named users from 50 to 5000, holding your other inputs fixed.

Optional: validate these numbers in a pilot

We can run a small pilot on your hardware to measure real questions per user, tokens per answer and minutes saved for JD Edwards EnterpriseOne.

Optional. The tool and every export work without this. No spam.

Was this tool useful?

How to use it

Start with named users and the share who will ask questions on a typical day. Then estimate questions per active user and tokens per question (a retrieval-based answer often uses 2,000 to 6,000 tokens including context). Enter the number of documents and average pages to be indexed, the minutes saved per question and a loaded hourly cost. Adjust the tokens per second per GPU to match a benchmark of your own model on your own hardware.

  • Use pilot data for questions per user as soon as you have it
  • Keep minutes saved conservative, 2 to 5 for most lookups
  • For EnterpriseOne, count media object attachments (images, PDFs, text) plus any shared-drive documents you index.

The formulas

Questions per day = users x daily active share x questions per user. Tokens per day = questions x tokens per question. Peak tokens per second = tokens per day x 0.2 / 3,600, assuming 20 percent of traffic in the busiest hour. GPUs = peak tokens per second / tokens per second per GPU, rounded up with a minimum of one. Index size = documents x pages x 1.2 chunks x 6 KB. Hours saved per month = questions per day x 22 x minutes saved / 60. Value = hours x loaded rate. Payback = 36 x monthly GPU cost / net monthly value.

Reading the result

A single GPU often covers a few hundred users because traffic is bursty and answers are short, so the GPU count is usually driven by availability and model size more than throughput. The sweep chart shows value rising linearly with users while GPU cost rises in steps, which is why value per GPU improves as you add users. If net value is negative, check whether minutes saved is realistic or whether the use cases are too narrow.

Common mistakes

People often assume every named user will ask questions daily; real adoption is lower. Others count the cheap tokens of a short question but forget the retrieved context that is sent with it. Do not forget implementation effort, staff time, licensing and storage, which this model excludes, and measure savings with a pilot rather than trusting a guess.

Frequently Asked Questions

Why only 20 percent of traffic in the busiest hour?

It is a common planning rule for office workloads, where use clusters in a few hours. If your usage is more concentrated, such as shift starts or month-end close, increase the factor by scaling questions per day or the tokens per second margin.

How do I get tokens per second per GPU?

Run your chosen model on your GPU under a serving stack such as vLLM with realistic concurrency, and record aggregate output plus input tokens per second. Published figures vary widely with model size, quantisation and batch size, so measure.

Does the model include licences and staff?

No. It covers GPU cost and time saved only. Add implementation, database licensing, storage, security review and support staff to get a full business case. Use the TCO and ROI calculators for a broader view.

What does a zero payback mean?

It means net monthly value is zero or negative with your inputs, so the hardware never pays back in this model. Raise realistic adoption or time saved, narrow the scope, or reconsider whether the use case justifies a dedicated GPU.

If you want these numbers validated against your JD Edwards EnterpriseOne environment, Netray can run a short sizing review and a pilot on your own hardware.

Get JD Edwards EnterpriseOne alerts

Support and maintenance deadlines, release changes that affect JD Edwards EnterpriseOne sites, and new free JD Edwards EnterpriseOne tools. A couple of emails a month at most.

Free. Unsubscribe with one click from any email.

ArchRay builder
Design the on-prem AI stack for JD Edwards EnterpriseOne: model, GPUs, RAG pipeline, guardrails
See memory, speed and cost as you swap parts, then export the diagram. Free, in your browser.
Open the builder

New to JD Edwards EnterpriseOne? Start with the JD Edwards EnterpriseOne guide and toolkit, or plan with Training Path Builder, Upgrade Path Planner, ERP Table and Field Explorer.

Keep exploring

Free tools

ERP fixes and how-tos

Runs with your ERP

Guides

AI on your ERP

Integrations

Software