OracleFree referencePDF, Excel, Word exportJD Edwards EnterpriseOneAll JD Edwards EnterpriseOne tools

JD Edwards EnterpriseOne 9.2 Tools Release History and How to Check Your Tools Release

This page lists the JD Edwards EnterpriseOne 9.2 tools releases and maps Oracle's yearly Release 22 to Release 26 names to Tools 9.2.6 through 9.2.26, with update months and headline tools features. It also explains how to check which tools release you are running and what the numbers mean.

Download:
Tools releaseRelease nameUpdate months / availabilityHeadline tools featuresPlatform notes
9.2.0
Applications 9.2 launch
Shipped with Applications 9.2 (October 2015)
Base tools for Applications 9.2. Point releases 9.2.0.x followed.
See Oracle Certifications tab on My Oracle Support
9.2.5
Before Release 2x naming
See Oracle Update Center / release notes
Last tools line before the Release 22 naming. Oracle lists Oracle JET 10 as certified with 9.2.5.4.
Last line before tools became 64-bit only (Release 22 / 9.2.6 is 64-bit Tools Foundation only)
9.2.6
Release 22
October 2021, January 2022, April 2022, June 2022 updates
Logic Extensions; files as orchestration input and output; media object attachments in orchestrations and notifications; Workflow Modeler in Orchestrator Studio; environment as an orchestration system value; Orchestrator Monitor messages
64-bit Tools Foundation only; as of 9.2.6 EnterpriseOne is fully 64-bit. Certifications include WebLogic 14.1.1 and Oracle Analytics Server 5.9
9.2.7
Release 23
October 2022, January 2023, April 2023, June 2023 updates
Call an orchestration from a workflow; launch logic extensions from form extensions; logic extension aggregation and array support; read-only Orchestrator database connection for joins and complex SQL; file selector for orchestrations on pages; Update Manager apply updates via web client
64-bit only. Certifications include WebCenter Portal 12.2.1.4, JDeveloper 12.2.1.4, Visual Studio 2022
9.2.8
Release 24
November 2023, January 2024, May 2024, June 2024 updates
Workflow Monitor; task tracking; notification reminders; Output Stream Access from the Orchestrator report step; user-defined CSV delimiter; Automated Tools Release Configuration (P96ATRC) replacing special instructions for the Tools Rollup ESU; Server Manager centralized configuration; Web OMW business view design and promote to package
64-bit only. Certifications include Windows Server 2022, SQL Server 2022, Oracle Analytics Server 23
9.2.8.x (e.g. 9.2.8.2)
Release 24 point release
Delivered as a point release on the 9.2.8 line
Four-part number = tools 9.2, update 8, point release 2. A point release is a maintenance level of the same update; read its release notes for fixes and minor features
Upgrade Server Manager to the same or later level first
9.2.9
Release 25
October 2024, January 2025, April 2025, June 2025 updates
Enterprise Process Modeler; Orchestrator access to OCI services; call orchestrations, notifications and logic extensions from row and form exits; list variables in rule criteria; text and image tiles on pages; Server Manager Performance Workbench; Update Manager web planner ESU; optimized full package build
64-bit only. Certifications include Oracle Analytics Server 24 and WebSphere 9.0.5.20
9.2.26
Release 26
October 2025, January 2026, April 2026 updates
Update names now match release numbers (Applications Update 26, Tools 9.2.26). Widgets with user input; Enterprise Automation Dashboard; notifications on EnterpriseOne pages; printer output options as orchestration variables; debug orchestrations with file; form extensions for power edit forms; web Scheduler
Certifications include Oracle Linux 9, Red Hat Enterprise Linux 9, Oracle Analytics Server 25
Check: HTML client
Open the user menu at the top right of the web client and choose About. It shows the Tools release and the Applications release of the session.
Fastest check for an end user
Check: Server Manager
The Server Manager console lists every managed instance (enterprise, HTML, AIS, deployment) with its tools release. Mixed releases across servers show here.
Check after every tools upgrade
Check: F00942
EMRLS in Object Path Master shows the Applications release (e.g. E920) per path code, not the tools release.
Do not confuse the two
Term: SP
'SP' (service pack) is the older name for a tools release used on earlier EnterpriseOne and OneWorld releases. On 9.2 the equivalent of 'SP 9.2.8.2' is Tools release 9.2.8.2.
Term: Release 9.2 continuous delivery
Applications stay at 9.2. New application and tools features arrive through yearly releases (22, 23, 24, 25, 26) and their quarterly updates, applied as ESUs and tools releases instead of a full upgrade.

Release names, update months, features and certifications for Release 22 to 26 are taken from Oracle's LearnJDE release pages. Exact general availability dates for 9.2.1 to 9.2.5 are not given here: check Oracle's Update Center or release notes. Before an upgrade, confirm the minimum Server Manager level and platform certifications on the Certifications tab in My Oracle Support.

Get your tools upgrade path checked

Send your current tools release, platform and database and we will list the target release, certifications to confirm and the order of server upgrades.

Optional. The tool and every export work without this. No spam.

Was this tool useful?

How the numbering works

EnterpriseOne 9.2 is on continuous delivery: Applications stay at 9.2 while Oracle ships a yearly release with quarterly updates. Release 22 innovation came in Tools 9.2.6, Release 23 in 9.2.7, Release 24 in 9.2.8 and Release 25 in 9.2.9. From Release 26 Oracle aligned the names, so the tools release is 9.2.26 and the applications update is Update 26. A four-part number such as 9.2.8.2 is a point release on the 9.2.8 line. Older EnterpriseOne and OneWorld releases called tools levels service packs, which is why people still ask for the 'SP number'.

How to check your tools release

In the HTML client, open the user menu at the top right and choose About: it shows the Tools release and Applications release for your session. For servers, open the Server Manager console, which lists each managed instance with its tools release; this is where you spot an AIS or HTML server left behind after an upgrade. Do not use F00942 EMRLS for this: it shows the applications release of the path code (E920), not the tools level.

  • Web client: user menu, About
  • Server Manager: managed instances list

Worked example: planning a tools-only upgrade

A site on Tools 9.2.5 wants Logic Extensions and the read-only Orchestrator database connection. Logic Extensions arrived with Release 22 (9.2.6) and the database connection with Release 23 (9.2.7), so the target is at least 9.2.7, and in practice the current line. Because tools became 64-bit only with 9.2.6, the upgrade also means moving to 64-bit Tools Foundation and 64-bit compilers and database clients, which is usually the larger piece of work. Check the Certifications tab for every server component before booking the window.

Gotchas

Tools and applications move separately: you can run current tools on older applications code, but some features need both a tools release and an application ESU. Upgrade Server Manager first, then enterprise, web and AIS servers, then deployment and development clients. Since Release 24 the Tools Rollup ESU uses Automated Tools Release Configuration (P96ATRC) instead of manual special instructions. Keep all servers on the same tools level; mixed levels are a common cause of odd runtime errors.

Frequently Asked Questions

What is the latest JDE tools release?

At the time of writing, Oracle's current line is Release 26 with Tools 9.2.26, announced in October 2025 with January and April 2026 updates. From Release 26 the tools number matches the release number. Check Oracle's LearnJDE What's New page or the Update Center for the newest point release before planning.

How do I check the JDE tools release?

In the web client, open the user menu at the top right and choose About to see the tools and applications release. For servers, the Server Manager console shows the tools release of each managed instance. The applications release per path code is in F00942 column EMRLS, which is not the tools level.

What does JDE 9.2.8.2 mean?

It is Tools release 9.2, update 8, point release 2. The 9.2.8 line delivered the Release 24 tools features; the last digit is a maintenance point release on that line. 'SP' or service pack is the older term for tools levels and is not used for 9.2 tools releases.

Which tools release is JDE Release 26?

Release 26 is delivered in Tools 9.2.26. Oracle changed the naming with this release so that the Applications Update and the tools release both carry 26. Earlier, Release 22 to 25 mapped to Tools 9.2.6, 9.2.7, 9.2.8 and 9.2.9.

If you want an AI assistant for your CNC team that answers 'what tools level is each server on and what changed' from your own Server Manager and logs, on your own servers, we can set that up.

Get JD Edwards EnterpriseOne alerts

Support and maintenance deadlines, release changes that affect JD Edwards EnterpriseOne sites, and new free JD Edwards EnterpriseOne tools. A couple of emails a month at most.

Free. Unsubscribe with one click from any email.

ArchRay builder
Design the on-prem AI stack for JD Edwards EnterpriseOne: model, GPUs, RAG pipeline, guardrails
See memory, speed and cost as you swap parts, then export the diagram. Free, in your browser.
Open the builder

New to JD Edwards EnterpriseOne? Start with the JD Edwards EnterpriseOne guide and toolkit, or plan with Training Path Builder, Upgrade Path Planner, ERP Table and Field Explorer.

Keep exploring

Free tools

ERP fixes and how-tos

Runs with your ERP

Guides

AI on your ERP

Integrations

Software