OracleFree referencePDF, Excel, Word exportJD Edwards EnterpriseOneAll JD Edwards EnterpriseOne tools

JD Edwards EnterpriseOne System Tables: F0092, F9860, F9861, F983051 and More

This is the list of JD Edwards EnterpriseOne 9.2 system tables that CNC administrators and developers query most: user and environment tables, OCM and data sources, Object Librarian, versions, job control and security. Each row gives the key columns and the practical question the table answers.

Download:
TableNameTable class / data sourceKey columnsUse it to find
F0092
Library Lists - User (user profile)
System
ULUSER
A user's role/group (ULUGRP), address number (ULAN8), user type and fast path flag. Maintained in User Profiles (P0092).
F00921
User Display Preferences
System
ULUSER
Language (ULLNGP), date format, decimal and date separators, country and time zone preferences.
F0093
Library List Control
System
LLUSER, LLLL
Which environments (library lists) a user or role can sign on to, and their sequence (LLSEQ).
F0094
Library List Master File
System
LMLL
Environment list with descriptions (LMDL01).
F00941
Environment Detail - One World
System
LMLL
Path code (LMPATHCD) behind each environment, e.g. which path code PY920 uses.
F00942
Object Path Master File
System
EMPATHCD
Path codes with release (EMRLS), deployment server share path and the central objects data source (EMDATS).
F98611
Data Source Master
System (servers read their copy in Server Map)
OMDATP
Database server, database name, owner and platform of each data source.
F986101
Object Configuration Master (OCM)
System (servers read their copy in Server Map)
OMENHV, OMOBNM, OMUGRP, OMSTSO
Which data source an object (table or UBE) maps to for an environment and user or *PUBLIC; active mappings have OMSTSO = AV.
F9860
Object Librarian Master Table
Object Librarian
SIOBNM
Object name, description (SIMD), system code (SISY) and object type SIFUNO (APPL application, UBE batch, BSFN business function, TBLE table). The quickest way to get an application's name.
F9861
Object Librarian - Status Detail
Object Librarian
SIOBNM, SIMKEY, SIPATHCD
Where an object is checked out or installed: machine (SIMKEY), path code, user, status (SISTCE) and SAR/project.
F9862
Object Librarian - Function Detail
Object Librarian
SIOBNM, SIFCTNM
Business function names inside a BSFN source member, with descriptions and data structure template.
F9865
Form Information File
Object Librarian
SWFMNM
Form name (e.g. W4210A) to application (SWOBNM) and form description (SWMD). Answers 'which app is this form?'
F983051
Versions List
Versions
VRPID, VRVERS
Every interactive and batch version: title (VRJD), last changed and last executed dates, check-out status, processing option data (VRPODATA).
F98306
Processing Option Text
Central Objects
Template name, item and language (see your table definition)
Text of processing option tabs and prompts for a template object. The values chosen per version are in F983051.VRPODATA, not here.
F98950
User Overrides Table
Central Objects class (check OCM for your mapping)
UOUSER, UOOBNM, UOFMNM, UOIDLST, UOUOTY, UOVERS, UOLNGP, UOSEQ
Saved user overrides such as grid formats and query settings per user, object and form.
F986110
Job Control Status Master
System class, mapped to the Server Map data source on enterprise servers
JCEXEHOST, JCJOBNBR
Submitted UBE jobs: user, environment, queue, status (JCJOBSTS), submit date and time, process ID. JCFNDFUF2 usually holds report and version, e.g. R42800_XJDE0001. Status D is done and E is error.
F00950
Security Workbench Table
System
FSSETY, FSUSER, FSOBNM, FSDTAI, FSFRDV, FSSY
Every application, action, row, column and processing option security record by user, role or *PUBLIC. Maintained in P00950.
F95921
Role Relationships Table
System
RLFRROLE, RLTOROLE, RLEFFDATE
Which roles a user belongs to, with effective (RLEFFDATE) and expiration (RLEXPIRDATE) dates and the default role flag. Maintained in P95921.
F98OWSEC
One World Security
System
SCUSER
System user mapping (SCSECUSR), password change frequency (SCSECFRQ), last change date, allowed attempts and whether the user is enabled (SCEUSER). Maintained in P98OWSEC.
F9312
Security History
System
SHUSER, SHMKEY, SHUPMJ, SHUPMT
Sign-on and security events by user, machine and date/time (event type SHEVTYP, status SHEVSTAT).

Table class is the object class from the 9.2 table definitions. The actual data source each table reads from is decided by OCM (F986101) for your environment, so always confirm with a query against F986101 before pointing a report at a database. Example: to find which version of R42800 a user ran yesterday, select from F986110 where JCUSER = the user and JCSBMDATE = yesterday's Julian date and read JCFNDFUF2.

Get a read-only CNC query pack

Tell us your tools release and database and we will send tested queries for failed jobs, checked-out objects and OCM mappings.

Optional. The tool and every export work without this. No spam.

Was this tool useful?

How to use it

Start from the question. Need an application's name from a form ID in a log? Use F9865 then F9860. Need to know who has an object checked out? F9861. Need the data source a UBE writes to in PY? F986101 for that environment, object and *PUBLIC, then F98611 for the server and database. Need which version a user ran? F986110. Filter on the key columns shown, and remember that most of these tables sit in the System data source shared by all environments, while F983051 is per path code and F98306 sits with central objects.

Data classes and OCM

Each table belongs to a class: System, Object Librarian, Central Objects or Versions. OCM decides where it physically lives. The System data source holds user, security, environment and OCM tables for the whole installation. Object Librarian tables (F9860 to F9865) are shared by all path codes, which is why F9861 carries the path code. Versions (F983051) and central objects tables live per path code, so DV920 and PD920 each have their own copy. Enterprise and HTML servers read F986101 and F98611 from the Server Map, and the job master F986110 is kept there so all servers see the same job list.

Worked example

A user reports that a nightly R42800 job failed. Query F986110 in the Server Map: WHERE JCUSER = 'JSMITH' AND JCSBMDATE = 126294, ordered by JCSBMTIME. The row with JCJOBSTS = E and JCFNDFUF2 = 'R42800_ZJDE0001' is the failed run; JCEXEHOST and JCJOBNBR identify the log on the enterprise server. Then read F983051 for VRPID = 'R42800' and VRVERS = 'ZJDE0001' to see when the version was last changed and by whom, which is often the real cause.

Gotchas

Do not update these tables with SQL: OCM changes go through the OCM application, security through P00950 and object changes through OMW (P98220), so caches and package builds stay consistent. Julian dates and HHMMSS times apply here too. Column lists change slightly by tools release, so confirm against your own OMW table definition. F98306 contains prompt text only; the values of processing options are stored in a blob in F983051 and are best read through the version itself.

Frequently Asked Questions

What is table F0092 in JD Edwards?

F0092 is Library Lists - User, the user profile table. Keyed by ULUSER, it holds the user's role or group (ULUGRP), address number, user type, menu and fast path settings. Display preferences such as language and date format are in F00921. Both live in the System data source and are maintained in User Profiles (P0092).

What is the F9861 table in JDE?

F9861 is Object Librarian - Status Detail. It has one row per object per machine key and path code, showing who changed it, when, the status code and the SAR or project. CNC admins use it to find where an object is checked out and on which path codes it exists.

Which JDE table has the processing options?

F98306 Processing Option Text stores the prompt text of a processing option template. The values chosen for each version are stored in the processing option data blob (VRPODATA) in the Versions List F983051, keyed by program ID and version. Read values through the version in the application rather than decoding the blob.

Which JDE table has the application name?

F9860 Object Librarian Master holds every object name with its description (SIMD), system code and object type (SIFUNO = APPL for applications). To go from a form name such as W4210A to its application, use F9865 Form Information, where SWFMNM is the form and SWOBNM the application.

If your CNC team wants to ask questions like 'which jobs failed last night and which versions changed' in plain English on your own servers, we can wire that up over these system tables, read only.

Get JD Edwards EnterpriseOne alerts

Support and maintenance deadlines, release changes that affect JD Edwards EnterpriseOne sites, and new free JD Edwards EnterpriseOne tools. A couple of emails a month at most.

Free. Unsubscribe with one click from any email.

ArchRay builder
Design the on-prem AI stack for JD Edwards EnterpriseOne: model, GPUs, RAG pipeline, guardrails
See memory, speed and cost as you swap parts, then export the diagram. Free, in your browser.
Open the builder

New to JD Edwards EnterpriseOne? Start with the JD Edwards EnterpriseOne guide and toolkit, or plan with Training Path Builder, Upgrade Path Planner, ERP Table and Field Explorer.

Keep exploring

Free tools

ERP fixes and how-tos

Runs with your ERP

Guides

AI on your ERP

Integrations

Software