OracleFree templatePDF, Excel, Word exportJD Edwards WorldAll JD Edwards World tools

JD Edwards World Private AI Layer Blueprint Generator

Answer a few questions about your JD Edwards World estate and this generator writes a complete architecture plan for a private AI layer: components, security controls, a three-phase rollout and the questions your IT team still has to answer. Everything is editable, and you can export it as a document.

Fill in

Live preview
Free, optional. Reopen it on any device.
Download:

JD Edwards World Private AI Layer Blueprint Generator

Context

Company: Prairie Gear and Machine System: JD Edwards World A8.1 on IBM Db2 for i (V7R3 or later) Scale: 160 named users; 2 plants, 1 distribution centre AI layer hosting: On-prem server; GPU position: None yet Target go-live: Q2 2027

Goal: add a private AI assistant on the existing system without moving data off-site. The assistant answers questions from live system data and documents, shows the data behind each answer, respects existing user permissions, and proposes changes for human approval.

Use cases in scope

Item availability, open order and PO status, vendor and customer lookup, ledger inquiry, search of spooled reports and PDFs

Data that must stay on site

Costing, margin and vendor pricing data, customer contracts

All model serving, indexing and logging for these data sets run inside the On-prem server boundary. No data is sent to an external model service.

Components

ComponentDesign for JD Edwards WorldNotes
Data access pathJDBC or ODBC to Db2 for i with a read-only profile; journal-fed off-box copy for heavy reads; batch input (Z) files for approved write-backReads are read-only; no direct writes to production tables
Retrieval indexSpooled reports, IFS and shared-drive PDFs, with company or business unit as the labelEmbedding model runs locally; ACL stored with every chunk
Model servingOpen-weight model served with vLLM or Ollama on None yetSize the model to the GPU; add a second node for availability
Tool serverNamed read tools with Julian date, implied decimal and UDC decoding; draft documents only until approved for batch inputNamed, parameterised tools; the model never writes free SQL
Identity and permissionsOne narrow IBM i profile for the connection; end-user scope enforced in the tool server from a reviewed mapping tableAcceptance test with a restricted user and a super user
AuditLog of user, tool, SQL text and answer on the Linux tool server; reviewed against IBM i audit journal entriesAppend-only; reviewed by IT and the system owner

Security controls mapped to your inputs

ControlImplementationDriven by
Data residencyModel, index and logs inside the On-prem server boundary; no external API callsData that must not leave the site
Least privilegeDedicated read-only account limited to listed objectsUse cases in scope
Permission mirroringOne narrow IBM i profile for the connection; end-user scope enforced in the tool server from a reviewed mapping table160 named users and roles
Network isolationModel host has no internet route for air-gapped; inbound only from the tool serverHosting choice
Write-back controlDrafts only, then supported APIs after named human approvalUse cases in scope
AuditabilityLog of user, tool, SQL text and answer on the Linux tool server; reviewed against IBM i audit journal entriesInternal audit and system owner

Rollout plan

PhaseScopeExit criteriaTypical duration
1. Read-only questions5 to 10 named tools and document search for a pilot groupAnswers match the system for a restricted and an unrestricted test user6 to 10 weeks
2. DraftsAssistant prepares documents or change requests as text for reviewReviewers accept drafts with low edit rate; audit log complete4 to 8 weeks
3. Approved actionsSupported write path, each action approved by a named personNo action executes without approval; rollback procedure tested6 to 10 weeks

Open questions for IT

1. Which libraries hold production data and which files are journaled? 2. How is World security configured today (menu, action code, file, program)? 3. Which custom RPG programs and batch interfaces already exist? 4. Is an off-box reporting copy acceptable, and which database will host it? 5. What CCSID and character conversion issues exist in the data?

Sign-off

System owner / Date
IT architect / Date
Security officer / Date
Business sponsor / Date

Planning document, not a design guarantee. Confirm object names, API availability and licensing for your exact version and patch level with your vendor documentation and DBA. Compliance with any regulation remains the responsibility of your organisation.

Optional: have the blueprint reviewed

Send us your generated plan and we will point out gaps in data access, permissions and sizing for your JD Edwards World environment.

Optional. The tool and every export work without this. No spam.

Was this tool useful?

How to use it

Enter your version, database, hosting model, user count and sites. Describe the use cases in plain words and list the data that must never leave the site. The blueprint copies those inputs into a context section, a component table, a controls table that traces each control back to your answers, and a rollout table. Review the draft with the system owner and security officer, edit the open questions, and use the export as the starting point for a design review.

What the plan assumes for JD Edwards World

The design reads from a safe access path, indexes documents in a local vector store, serves an open-weight model on your own hardware, and exposes only named tools. The system-specific path is: JDBC or ODBC to Db2 for i with a read-only profile; journal-fed off-box copy for heavy reads; batch input (Z) files for approved write-back. Permissions are mirrored from the system so that the assistant never shows data a user could not open directly.

  • Read-only by default; no direct writes to production tables
  • Model and index run inside your boundary, with an air-gapped option
  • Every question and tool call is logged for audit
  • Writes are drafted first and approved by a person

Reading the output

The context section is the summary a sponsor reads. The component table is for architects, and the controls table is for security and audit. The rollout table is deliberately conservative: phase 1 proves that answers are correct and permission-safe before any drafting or action. Durations are ranges that depend on data quality, licensing and how quickly access is granted.

Common mistakes

Teams often start with the model and leave identity and data access for later. Reverse that: decide how permissions are mirrored first, test with a restricted user, and only then tune the model. Also avoid pointing the assistant at production tables, giving it free-form SQL, or skipping the audit log.

Frequently Asked Questions

Does this plan require sending data to the cloud?

No. The design keeps the model, index and logs inside your boundary. Hosting can be an on-prem server, a private cloud you control or an air-gapped network. You can still add cloud services later if your policy allows.

Which GPU do we need?

It depends on the model size and the number of simultaneous users. A modest estate usually starts with one or two data-centre GPUs. Use the companion sizing calculator to estimate it from your own numbers.

Can the assistant change data in JD Edwards World?

Only through supported interfaces and only after a named person approves the exact action. Phase 1 and 2 are read-only and drafting, so nothing writes to the system until you decide it should.

Is the output a finished design?

No. It is a structured starting point that your architects and DBAs should verify against your version, licensing and security policies before building.

Want a second pair of eyes on this plan? Netray builds private AI layers on JD Edwards World and similar on-prem systems, and can review your draft with your team.

Get JD Edwards World alerts

Support and maintenance deadlines, release changes that affect JD Edwards World sites, and new free JD Edwards World tools. A couple of emails a month at most.

Free. Unsubscribe with one click from any email.

ArchRay builder
Design the on-prem AI stack for JD Edwards World: model, GPUs, RAG pipeline, guardrails
See memory, speed and cost as you swap parts, then export the diagram. Free, in your browser.
Open the builder

New to JD Edwards World? Start with the JD Edwards World guide and toolkit.

Keep exploring

Free tools

ERP fixes and how-tos

Runs with your ERP

Guides

AI on your ERP

Integrations

Software