Job Shop Setup Cost and Minimum Lot Size Calculator
Setup is a fixed cost per lot, so a one-piece order and a 500-piece order do not cost the same per part. This calculator shows where an order stops losing money and where setup becomes a reasonable share of the price.
Your numbers
Your rule: setup per part should not exceed this share of the price.
Your results
Cost and profit per part vs lot size
Sweeps Lot size to test from 1 to 100, holding your other inputs fixed.
Review setup times in your ERP
Optional: compare routing setup hours against actual labor tickets.
Optional. The tool and every export work without this. No spam.
How to use it
Enter setup hours, shop rate, run time, material and the price you can get. The tool computes contribution per part, which is price minus material and run cost. Divide setup cost by that contribution and you get the break-even lot. The second result sets a policy: the smallest lot that keeps setup under your chosen share of price. Use it to set minimum order charges.
The math
Setup cost = setup hours x rate. Contribution = price - material - run cost. Break-even lot = setup cost / contribution, rounded up. Cost per part at lot Q = material + run cost + setup / Q. The curve falls steeply for small lots and flattens as setup is absorbed, which is why quoting only two or three quantity breaks misses most of the savings.
- Break-even lot = ceil(setup / contribution)
- Setup per part = setup / lot size
- Minimum lot for a cap = setup / (price x cap)
Using it in the shop
Set a minimum order charge equal to setup cost when the customer's quantity falls below your cap lot. Reduce setup hours with standard fixtures, offline tool presetting and saved programs, then re-run the numbers to see the effect. In an ERP, make sure setup hours on the routing come from actual labor tickets and not from a figure typed once during implementation.
Frequently Asked Questions
What if contribution is zero or negative?
Then no lot size recovers setup, because every part loses money before setup. The break-even shows 0. Raise the price or cut run time and material cost.
Should I include overhead in the shop rate?
Yes if you want fully loaded profit. If you use a direct cost rate, the break-even shows only the point where setup is covered, not overhead.
How is this different from EOQ?
EOQ balances setup against holding cost for inventory you make to stock. This tool is for customer orders where price is fixed and the question is whether the lot is worth running.
Why do small lots look so expensive?
Because the whole setup lands on a few parts. Spread setup across 10 parts and each carries a tenth of it; across 100 parts, a hundredth.
Netray can pull actual setup versus estimated setup hours from your ERP so these inputs reflect what really happens on the floor.
Related Tools
Job Shop Quote Price, Margin and Markup Calculator
Turn cost inputs into a unit price at your target gross margin, including scrap, setup and outside processing, and see the markup it equals.
Costing & FinanceCNC Machine Shop Hourly Rate Calculator
Build a defensible machine hour rate from purchase price, utilization, upkeep, power and operator cost, and see how utilization moves it.
Quality & InspectionJob Shop Scrap and Rework Cost Calculator
Put a dollar figure on annual scrap and rework, net of recovery, and test how much a reduction program is worth.
Costing & FinanceWork Center Machine Rate Worksheet
A row-per-machine worksheet that computes an hourly rate for each work center, ready to load into JobBOSS, E2, Global Shop or another ERP.
More MES & Shop Floor tools
See all- Shop Traveler Template
- Oracle Fusion OEE Work Center Calculator
- Infor VISUAL Shop Labor Ticket Log Worksheet
- VISUAL Shop Load Versus Capacity Calculator
- VISUAL Shop Resource Capacity and Load Calculator
- IFS Shop Order Status and Lifecycle Reference
- Plex Smart Manufacturing Data Source Request Template
- Plex Production Scheduling Checklist
- Plex Downtime Reason Log and OEE Worksheet
Keep exploring
Free tools
- Minimum Batch Size and Setup Cost CalculatorFind what each changeover really costs and the smallest batch that keeps setup cost below a chosen share of unit cost.
- Minimum Order Charge Policy ChecklistA checklist for deciding the minimum order value, backing it with real fixed cost, writing it into quotes and enforcing it in your ERP.
- Job Shop Setup Cost Per Piece CalculatorSee how setup hours, run time, material and margin combine into a per-piece cost and price, and how it falls as the lot size grows.
Guides
- How to Price Small-Lot and Prototype Work in a Job ShopHow job shops price prototypes and small lots: setup amortization, programming, first article, minimum lot charges, scrap allowance and quantity breaks that protect margin.
- Plating Job Shop Quoting Software: What a Finishing Shop Actually NeedsPlating and metal finishing job shop quoting: how to price from spec, area, rack count and minimum lots, and where AI can draft quotes from customer POs.
- How to Estimate the Cost of a Machined Aerospace PartA step-by-step method for estimating a machined aerospace part: material and buy-to-fly, setup, cycle time, special processes, FAI, tooling and margin.
AI on your ERP
- AI for ECI JobBOSS2 and E2 Shop SystemAdd AI to ECI JobBOSS2 or E2 Shop System for faster quoting, tighter scheduling, and shop-floor answers, without sending your job data to the cloud.
- AI for JobBOSS2 in Precision Machining: Quotes, Routings and Job Cost Answers from Your Own DataPrivate AI for JobBOSS2 precision machine shops: quote history, routing actuals, job cost variance and on-time delivery answers, kept on your own network.