Work Center Machine Rate Worksheet
Work center rates drive every estimate and every job cost report, yet many shops still carry rates entered at go-live. This worksheet recomputes the machine part of each rate from first principles, one row per machine.
| Work center | Type | Machine value | Life (years) | Productive hours per year | Maintenance per year | Avg kW running | Price per kWh | Depreciation per hour | Maintenance per hour | Power per hour | Machine rate per hour | |
|---|---|---|---|---|---|---|---|---|---|---|---|---|
$6 | $2 | $2 | $10 | |||||||||
$3 | $1 | $1 | $5 | |||||||||
$18 | $5 | $3 | $25 | |||||||||
$1 | $1 | $0 | $2 | |||||||||
$7 | $3 | $0 | $10 |
Machine rate excludes operator labor, overhead and tooling. Add those through your burden rates in the ERP. Use productive hours, not scheduled hours.
Compare these rates with your ERP
Optional: a side-by-side of computed and stored work center rates.
Optional. The tool and every export work without this. No spam.
How to use the worksheet
Replace the example rows with your own machines. For each one enter value, life, productive hours, yearly maintenance, running kW and your power price. Depreciation, maintenance and power per hour calculate automatically, and the rate column adds them. Export to Excel, then compare the result with the rates in your ERP work center table and note the gaps.
What the columns mean
Depreciation per hour is value divided by life and productive hours. Maintenance per hour is yearly upkeep over the same hours. Power is running kW times tariff. These are the machine-owned costs only. Operator wages and shop overhead sit in separate rate lines in most ERPs, so keeping them apart makes it clear which part of a rate changed.
- Use productive hours from actual labor tickets
- Update value when you rebuild or retrofit a machine
- Group similar machines if they share an ERP work center
Loading rates into the ERP
Work centers in JobBOSS, E2 Shop System, Global Shop Solutions and similar systems typically carry separate run, setup and burden rates. Enter the machine rate from this sheet in the machine cost field, then add labor and overhead separately. Review rates yearly, and whenever utilization changes by more than a few points, because the per-hour figure moves with it.
Frequently Asked Questions
Why do two similar mills have different rates?
Value, age, hours and maintenance differ. A newer machine has higher depreciation per hour, while an older one may carry more maintenance. The worksheet makes both visible.
Should I use straight-line depreciation?
For rate setting, yes, it is simple and stable. Tax depreciation is lumpy and should not drive quoting rates.
Do I include interest cost?
This sheet leaves it out for simplicity. The CNC machine hourly rate calculator includes interest on the average investment if you want to add it.
How many hours should I use?
Use productive hours based on recent labor tickets. Using theoretical capacity makes rates look lower than they are.
Netray can compare these computed rates with the rates stored in your ERP and show which work centers are mispriced.
Related Tools
CNC Machine Shop Hourly Rate Calculator
Build a defensible machine hour rate from purchase price, utilization, upkeep, power and operator cost, and see how utilization moves it.
Costing & FinanceJob Shop Quote Price, Margin and Markup Calculator
Turn cost inputs into a unit price at your target gross margin, including scrap, setup and outside processing, and see the markup it equals.
ERP Migration & SelectionJob Shop ERP Subscription vs Perpetual License Cost Calculator
Compare cumulative cost of a per-user subscription against a perpetual license plus maintenance and hosting, and find the break-even year.
MES & Shop FloorJob Shop Setup Cost and Minimum Lot Size Calculator
See how setup cost is absorbed as lot size grows, and find the smallest order that breaks even or keeps setup under a chosen share of price.
More Costing & Finance tools
See all- Job Shop WIP Report Template
- Required Shop Rate for Target Profit Calculator
- Rush Order and Expedite Premium Calculator
- Quote Win Rate and Margin Log Worksheet
- Minimum Order Charge Policy Checklist
- Job Shop Costing Maturity Assessment
- SAP QM Inspection Effort and Cost Calculator
- SAP Standard Cost Estimate BOM Rollup Calculator
- Legacy ERP Retirement Cost and Payback Calculator
Keep exploring
Free tools
- Job Shop Machine Hour Rate CalculatorWork out a loaded hourly rate for a CNC machine or work center and see how utilization changes it.
- CNC Machine Shop Hourly Rate CalculatorBuild a defensible machine hour rate from purchase price, utilization, upkeep, power and operator cost, and see how utilization moves it.
- Job Shop Machine Hour Rate WorksheetEditable worksheet that converts machine price, life, hours, power draw and maintenance into a cost per run hour for each machine.
ERP fixes and how-tos
- How to Run Live Scheduling in Global Shop SolutionsHow to set up and run Live Scheduling in Global Shop Solutions, from work center setup through the scheduling board, and why the board can drift from reality.
- How to Add a Private AI Layer to Classic JobBOSS On-PremHow to add a private on-prem AI assistant to classic JobBOSS: read-only SQL Server access, job and operation data, permissions, GPU sizing and rollout.
- How to Close a Job in JobBOSS2Step by step guide to closing a job in JobBOSS2, including checking open operations, unposted material and labor, and why a job will not close.
Guides
- Job Shop ERP Software Comparison: JobBOSS, E2 Shop System, ProShop and Global ShopJob shop ERP software compared for CNC machine shops: JobBOSS2, E2 Shop System, ProShop, Global Shop Solutions and Epicor Kinetic, and the questions to ask.
- Swiss Machine Hourly Rate and Real Shop MarginsHow to calculate a Swiss machine hourly rate and real shop margin: depreciation, utilization, tooling, labor, overhead, and why quoted margin differs from actual.
- ERP for Aerospace Build-to-Print Machine Shops: What to RequireWhat an AS9100 build-to-print machine shop needs from ERP: revision control, traveler, lot traceability, outside processing, FAI and certs.
AI on your ERP
- AI for ECI JobBOSS2 and E2 Shop SystemAdd AI to ECI JobBOSS2 or E2 Shop System for faster quoting, tighter scheduling, and shop-floor answers, without sending your job data to the cloud.
- AI for JobBOSS2 in Precision Machining: Quotes, Routings and Job Cost Answers from Your Own DataPrivate AI for JobBOSS2 precision machine shops: quote history, routing actuals, job cost variance and on-time delivery answers, kept on your own network.
Integrations
- How to add AI agents to Global Shop SolutionsHow to add AI agents to Global Shop Solutions: a read-first tool layer over its data and APIs, approval before any write, and on-prem model options for job shops.
- How to add AI agents to ECI E2 Shop SystemHow to add AI agents to ECI E2 Shop System: a read-first tool layer over the E2 SQL database, human approval on writes, and a private on-prem model option.
Software
- Global Shop SolutionsWhat Global Shop Solutions ERP is, how its estimating, scheduling and shop floor modules serve job shops, and which ERP alternatives to compare.
- ECI E2 Shop SystemIndependent guide to E2 Shop System, the ECI shop management and manufacturing software for job shops: modules, integrations, strengths, limits, alternatives and AI use cases.