Kingdee BOM Import Worksheet (Excel Export)
Loading bills of material is one of the most error-prone steps in a Kingdee implementation. This worksheet lets you prepare and check BOM lines before you touch the import template, with gross quantity and extended cost calculated for you.
| BOM version | Parent material code | Component material code | Component name | Unit | Numerator | Denominator | Scrap rate (%) | Unit cost | Gross qty per parent | Extended cost | |
|---|---|---|---|---|---|---|---|---|---|---|---|
1.02 | CNY 19 | ||||||||||
1.01 | CNY 6 | ||||||||||
4.12 | CNY 0 | ||||||||||
0.021 | CNY 1 | ||||||||||
0.1 | CNY 0 |
Field names, required columns and validation rules differ by Kingdee product and release, so match your final column layout to the official import template for your version. Use this sheet to validate quantities, scrap and cost before loading, and keep one BOM version per parent per sheet.
Optional BOM data validation help
Share a sample of your BOM extract and we will suggest automated checks before your Kingdee load.
Optional. The tool and every export work without this. No spam.
How to use the worksheet
Enter one row per component for a parent material and BOM version. Use the numerator and denominator to express usage, for example 1 litre of lubricant for every 50 parents is numerator 1 and denominator 50. Add the scrap rate as a percentage. The sheet calculates gross quantity per parent and extended cost, and totals material cost. When the data is clean, export to Excel and copy it into the official Kingdee import template for your release.
- One BOM version per parent per block
- Use consistent unit codes with your material master
- Check that all parents and components exist before import
- Review the highest-cost lines first
The formulas
Gross quantity per parent equals numerator divided by denominator, multiplied by one plus the scrap rate expressed as a fraction. Extended cost is gross quantity times unit cost. For the example screw, four per parent with 3 percent scrap gives 4.12 pieces. Material cost per parent is the sum of extended costs across all lines, which you can compare against the standard cost your cost accountants hold.
Data quality checks before import
Most BOM load failures come from missing materials, unit mismatches, circular references and duplicate component lines. Before import, confirm every parent and component code exists in the material master with the same unit, that no component appears twice in the same BOM version unless intended, and that quantities are positive. Also verify that phantom items, substitutes and effectivity dates are handled as your Kingdee release expects.
Common mistakes
Frequent errors include swapping numerator and denominator, entering scrap as a fraction in a percent column, mixing units such as grams and kilograms, and loading engineering BOMs where production BOMs are needed. Always cost one or two finished goods by hand and compare with the sheet.
Frequently Asked Questions
What do numerator and denominator mean in a Kingdee BOM?
They express component usage as a ratio. Numerator is the component quantity and denominator is the parent quantity it applies to. This allows fractional usage, such as one litre per fifty parents, without rounding errors from decimal quantities.
Is this sheet the official Kingdee import template?
No. It is a preparation and validation aid. The official template, column names and mandatory fields depend on your Kingdee product and release, so always map this data into that template before loading.
How should I enter scrap?
Enter it as a percentage of the required quantity, such as 2 for 2 percent. The sheet increases the gross quantity by that percentage. If your Kingdee setup also uses fixed loss quantities, track those separately.
Can I use this for other ERPs?
Yes, the numerator and denominator logic and the cost roll-up apply to any ERP BOM. Just map the columns to the target system's import layout and respect its own rules for versions, phantoms and units.
If you have thousands of BOMs to clean and load, Netray and its partners can help build repeatable validation scripts. Checks can run locally so engineering data does not leave your network.
Related Tools
Kingdee K/3 Cloud to Cloud Galaxy Migration Checklist
A practical checklist for upgrading or migrating a Kingdee K/3 Cloud estate to Kingdee Cloud Galaxy, covering scope, data, custom code, integrations, cutover and tax.
Discrete ManufacturingChina Manufacturing Plant ERP Rollout Checklist
A rollout checklist for a new or replacement ERP in a Chinese factory, from governance and shop floor to tax and hypercare.
ERP Migration & SelectionChina ERP Selection Scorecard: Kingdee vs Yonyou vs SAP
An editable weighted scorecard to compare Kingdee, Yonyou and SAP for a China plant or subsidiary. Set your weights, score each vendor and export.
ERP Migration & SelectionYonyou U8 to YonBIP Readiness Assessment
Answer ten questions to see how prepared your U8 environment is for a move to Yonyou YonBIP, and what to fix first.
More Other ERPs tools
See all- Infor VISUAL Work Order Status and Structure Reference
- Infor VISUAL Manufacturing Scheduling Checklist
- Infor XA (MAPICS) Period End Close Checklist
- Infor VISUAL Database Table Reference
- Infor XA (MAPICS) Application Module Reference
- IBM i Commands for Infor XA Administrators Reference
- Acumatica Generic Inquiry Design Template
- Acumatica Manufacturing Edition Setup Checklist
- Sage X3 Import Template Worksheet
Keep exploring
Free tools
- ERPNext BOM Import TemplateAn editable BOM worksheet with finished item, component, quantity, UoM and rate columns, calculating extended and rolled up cost before you import to ERPNext.
- China ERP Selection Scorecard: Kingdee vs Yonyou vs SAPAn editable weighted scorecard to compare Kingdee, Yonyou and SAP for a China plant or subsidiary. Set your weights, score each vendor and export.
- Kingdee K/3 Cloud to Cloud Galaxy Migration ChecklistA practical checklist for upgrading or migrating a Kingdee K/3 Cloud estate to Kingdee Cloud Galaxy, covering scope, data, custom code, integrations, cutover and tax.
ERP fixes and how-tos
- How to Maintain the BOM and Routing in SyteLineHow to add components, operations and effectivity dates to a SyteLine bill of material and routing, and why edits do not reach jobs that already exist.
- How to Export an Indented (Multi-Level) BOM from SyteLineExport a multi-level indented BOM from SyteLine/CSI to Excel or CSV using the application's reports and grid export, or a recursive SQL query with a sample.
- SAP Business One production process flow: from BOM to production order to receiptThe SAP Business One production process flow from bill of materials to production order, issue, receipt and close, with the reports and tables used.
Guides
- AI-Powered BOM Optimization for Infor SyteLineOptimize SyteLine Bill of Materials with AI. Automated BOM validation, cost rollups, and engineering change management for Infor CloudSuite Industrial.
- How to Configure SyteLine Data Import UtilityStep-by-step instructions for configuring SyteLine's Data Import Utility. Learn to import items, customers, BOMs, and routing data using templates, validation, and scheduling.
- Wire Harness Drawing to BOM: Automating the ConversionConvert harness drawings, PDFs and from-to tables into a structured BOM and wire list: what can be automated, error checks, and human review.
Software
- Kingdee Cloud GalaxyKingdee Cloud Galaxy explained: Kingdee's enterprise cloud ERP for large groups, its manufacturing modules, integrations, limitations and alternatives.
- Yonyou BIPYonyou BIP explained: the cloud business platform behind Yonyou ERP, its manufacturing modules, integrations, limits, alternatives and where AI fits.