Wafer Probe Throughput and Test Cell Capacity Calculator
This calculator estimates how many wafers a wafer probe cell can test per hour and per week, based on dies per wafer, parallel sites, test time, prober index time, load overhead and retest rate. It is built for test engineers and capacity planners who need a quick answer before spending on probe cards or testers.
Your numbers
Gross die tested per wafer.
Dies probed in each touchdown.
Move time between touchdowns.
Share of touchdowns repeated.
Share of time spent testing after downtime, setup and idle.
Your results
Simplified model. Real throughput also depends on probe card cleaning, edge die partial touchdowns, wafer map handling, temperature soak and prober specific timing. Measure on the real cell to calibrate.
Wafers per hour vs parallel sites
Sweeps Parallel test sites from 1 to 32, holding your other inputs fixed.
Capacity planning from live ERP data
Optional: see how test cell capacity can be compared with open work orders in your ERP.
Optional. The tool and every export work without this. No spam.
How to use it
Enter the die count per wafer and the number of parallel sites your probe card supports. Add the test time per touchdown, the prober index time and the wafer load overhead, then set a retest rate and utilization. The result is wafers per hour per cell and total weekly capacity across all cells. The chart shows how adding sites changes throughput.
- Use measured test time from the real test program
- Keep utilization realistic after downtime and setup
- Compare multi-site options on the chart
The formula
Touchdowns per wafer is dies divided by sites, rounded up. Time per wafer is touchdowns times one plus the retest fraction, times the sum of test time and index time, plus the wafer load overhead. Wafers per hour is 3600 divided by that time. Weekly capacity multiplies by the hours, utilization and number of cells.
Worked example
With 1,200 dies, 4 sites, 1.5 s test time and 300 ms index, there are 300 touchdowns. With a 5 percent retest rate, the touch time is 300 times 1.05 times 1.8 s, or 567 s, plus 45 s load for 612 s per wafer. That is about 5.9 wafers per hour per cell, and roughly 2,200 wafers per week for three cells at 75 percent utilization.
Common mistakes
Assuming perfect multi-site efficiency overstates throughput, because edge dies and partial touchdowns waste sites, and parallel test time can grow with site count. Another mistake is using calendar capacity as if utilization were 100 percent. Finally, do not forget extra time for temperature tests, where thermal soak can dominate.
Frequently Asked Questions
What is a touchdown in wafer probing?
A touchdown is one contact of the probe card with the wafer. With multi-site probing, one touchdown tests several dies in parallel, so fewer touchdowns are needed per wafer.
Why is edge die handling not modeled?
Edge dies create partial touchdowns where not all sites are used. This tool uses a simple ceiling of dies divided by sites. For precise numbers, use the prober's actual touchdown map.
How do I reduce wafer probe cost per die?
Increase parallel sites, shorten test time through test program optimization, reduce retests and improve utilization. Each affects the time per wafer shown in this model.
Does test time grow with more sites?
Often yes, a little, because tester resources are shared and some tests are serialized. Use a measured test time at the target site count rather than the single site time.
If you want capacity and WIP questions answered from your ERP and test data in plain language, Netray can set that up on-prem.
Related Tools
Semiconductor Lot Yield and Bin Pareto SQL Generator
Fill in your table and column names to get ready-to-run SQL for weekly yield, bin Pareto and lowest-yield lots.
Electronics ManufacturingSemiconductor Wafer Size and Thickness Reference
Lookup table of standard silicon wafer diameters, nominal thicknesses, areas and typical applications.
Electronics ManufacturingSemiconductor Process Tool Qualification Checklist
Checklist covering facilities hookup, safety, hardware acceptance, process qualification and production release for a fab or OSAT tool.
Developer ToolsWestern Electric Rules SPC Python Script Generator
Creates a standalone Python script that reads a CSV column and flags points breaking the four Western Electric run rules.
More Electronics Manufacturing tools
See all- Gross Die Per Wafer Calculator
- Die Yield Calculator (Poisson, Murphy, Negative Binomial)
- Semiconductor Cycle Time X-Factor Queue Calculator
- Cleanroom FFU Air Changes Per Hour Calculator
- Burn-In Arrhenius Acceleration Factor and FIT Calculator
- Lithography Resolution and Depth of Focus Calculator
- Deal-Grove Thermal Oxide Thickness Calculator
- Etch Rate Uniformity Log Worksheet
- Semiconductor Package Types Reference
Keep exploring
Free tools
- Wafer Probe Bin Yield Log WorksheetAn editable wafer sort log that totals bin counts per wafer and calculates probe yield and loss percentages, ready for Excel.
- Gross Die Per Wafer CalculatorEstimate gross die per wafer from wafer diameter, die dimensions, scribe lane and edge exclusion, and see how die size changes the count.
- Wafer Cost Per Good Die CalculatorConvert wafer price, die size and yield into cost per good die and cost per packaged unit.