Machine CE Marking Technical File Checklist
Before a machine can carry the CE mark in the EU, the builder must assemble a technical file that shows how the safety requirements were met. This checklist lists the documents and evidence that normally belong in that file.
0 of 35 items complete
12 critical items still open - these are the highest-risk gaps.
Scope and conformity route
Design and risk documentation
Safety functions and verification
Components and suppliers
Instructions and marking
Declaration and retention
This is a working aid, not legal advice. Machinery Directive 2006/42/EC applies until the Machinery Regulation (EU) 2023/1230 applies from 20 January 2027. Confirm the applicable route with your notified body or counsel.
Link compliance files to as-built BOM
Optional review of how technical file documents can follow machine configuration and revision in your PLM or ERP.
Optional. The tool and every export work without this. No spam.
How to use this checklist
Work through the groups in order. Start with scope, because every later step depends on whether your machine is in scope and which conformity route applies. Then build the risk assessment, which is the spine of the file, and link each hazard to a protective measure and to evidence that the measure works. Tick items as they are filed, and record where each document lives so the file can be produced quickly. The critical items are the ones authorities and customers usually ask for first.
- Keep one master index with document numbers and revisions.
- Store the file against the machine type and as-built revision.
- Update the file after any design change that affects safety.
- Keep translations controlled with the source instructions.
What the technical file is
Under the Machinery Directive 2006/42/EC, the technical file is the set of documentation the manufacturer must hold to demonstrate conformity. It is not sent with the machine; it is available to market surveillance authorities on request. The customer receives the instructions and the declaration of conformity instead. Annex VII of the directive sets out its contents. Machines listed in Annex IV have extra conformity assessment requirements, which can include a notified body, so check that first.
Risk assessment and verification
A strong file connects three things: the hazard, the protective measure and the verification. For safety functions implemented in control systems, record the required performance level, the architecture, diagnostic coverage and the calculation or tool report, plus the validation test that proved it on the actual machine. Reviewers look for traces from each hazard to a test result. A risk assessment that is a generic table with no link to the design is the most common weak point.
Common mistakes and the new regulation
Common mistakes include missing instructions in the destination language, declarations that cite withdrawn standards, and files that describe the design as proposed rather than as built. Teams also forget that components integrated from other suppliers need their own paperwork. The Machinery Regulation (EU) 2023/1230 replaces the directive with application from January 2027 and adds points on software, cybersecurity and AI-enabled safety functions. Start mapping your file to it now if your machines will be sold after that date.
Frequently Asked Questions
Does the technical file go to the customer?
No. The customer receives the instructions and the EU declaration of conformity. The technical file stays with the manufacturer and is made available to market surveillance authorities on a reasoned request. Some customers ask to audit it during supplier qualification, which is a commercial arrangement.
How long must the technical file be kept?
For ten years after the last machine of that type has been manufactured under the Machinery Directive. Keep all versions that relate to units placed on the market, along with the standards editions applied, so you can show what was true at the time of supply.
Do I need a notified body?
Only for machines in Annex IV where harmonised standards are not fully applied, or for certain categories. Most machines follow internal production control. Check the Annex IV list and the standards you used early, because a notified body route changes schedule and cost.
Is this checklist enough to CE mark a machine?
No. It is a working aid listing typical contents. You still need competent engineering, correct standards, a real risk assessment and test evidence. Confirm your obligations with a qualified safety engineer, notified body or legal adviser for your specific machine and market.
If your engineering data, BOM revisions and compliance documents live in different systems, Netray can help link them so the technical file stays current with the as-built configuration.
Related Tools
Equipment Factory Acceptance Test (FAT) Checklist
A factory acceptance test checklist for custom machinery covering documents, mechanical, electrical, safety, controls and run-off tests before shipment.
Industry TemplatesMachine Installation and Commissioning Checklist
A phase-by-phase checklist for installing and commissioning industrial machinery, from site readiness through power-up, tuning and handover.
Supply Chain & InventoryOEM Recommended Spare Parts List Template
An editable spare parts list for commissioning and two-year operation with criticality class, supplier, lead time and extended cost.
Industry TemplatesSite Acceptance Test (SAT) Report Template
A fill-in site acceptance test report for installed machinery with utilities check, test results table, punch list and customer sign-off.
More Compliance & Contracts tools
See all- SAP SoD Residual Risk Score Calculator
- SAP Firefighter ID Usage Review Log
- IBM i (AS/400) User Profile Access Review Worksheet
- SyteLine Security and User Access Audit Checklist
- Infor XA (MAPICS) User Access Review Worksheet
- China ERP Data Security and Compliance Assessment
- ERP Vendor Data Processing Agreement Outline
- GDPR ERP Data Migration Checklist
- EU Machinery Regulation 2023/1230 Readiness Checklist