Machine Safety Function Register Worksheet
Every safety function on a machine should be listed once with the performance level it needs, the performance level it reaches and the proof that it works. This register is that list, ready to feed the technical file.
| SF # | Safety function | Hazard addressed | Required PL (PLr) | Achieved PL | Category | Main devices | Validation | Calculation / test ref | |
|---|---|---|---|---|---|---|---|---|---|
Flag any row where achieved PL is lower than the required PL. The register supports, but does not replace, the risk assessment and the verification calculations required by ISO 13849-1 and ISO 13849-2.
Organize technical file data
Optional review of keeping safety and compliance records linked to machine serial numbers.
Optional. The tool and every export work without this. No spam.
How to use the register
Start from the risk assessment. For each hazard that needs a control measure, create a safety function row and name it by the action it performs, such as stop the robot when the guard opens. Enter the required performance level from your risk graph, then the achieved level from your calculation. Fill in the category, the main devices and the reference to the calculation or test record. Update the validation column as tests are completed and export the sheet for the technical file.
- Name the function by action, not by device
- PLr comes from the risk assessment, not from guesswork
- Achieved PL must be equal to or higher than PLr
- Link each row to a calculation and a test record
Performance level and category
ISO 13849-1 expresses the reliability of a safety function as a performance level from a to e. The achieved level depends on the architecture category (B, 1, 2, 3, 4), the mean time to dangerous failure of components, diagnostic coverage and common cause failure measures. Tools such as manufacturer calculators or SISTEMA can compute it. This worksheet stores the results, it does not calculate them. In the example, SF4 has an achieved PL of c against a required d, which flags a design gap that must be closed before the machine ships.
Validation and the technical file
Calculation is not validation. ISO 13849-2 expects tests that show each function actually performs, including fault conditions where practical. Record the test reference and the result on each row. When a row fails, link it to a punch item or corrective action. For machines placed on the EU market, this register is a convenient index for the technical file, alongside the risk assessment, circuit diagrams and the declaration of conformity.
Common mistakes
Common errors are listing devices instead of functions, copying PLr values from a similar machine, and skipping validation of the less obvious functions such as safe speed during setup. Another mistake is changing a guard or program late in the project without revisiting the register. Treat any change to a safety function as a trigger to update the row and repeat the affected test.
Frequently Asked Questions
What is PLr?
PLr is the required performance level for a safety function, determined from the risk assessment using factors such as severity of injury, frequency of exposure and possibility of avoiding the hazard. It sets the minimum reliability the safety function must achieve.
Does this worksheet calculate performance level?
No. It records the results from a proper calculation tool and your validation tests. Use manufacturer data and a recognized calculation method to determine the achieved level.
Is this register enough for CE marking?
No. It is one part of the technical file. You also need the risk assessment, drawings, instructions, applicable standards list and the declaration of conformity or incorporation.
How often should it be updated?
Whenever a safety function is added, changed or retested, and at the end of each project phase. Review it before FAT and again before shipment so no row is left unvalidated.
If you manage machine documentation across several projects, Netray can help organize it with your ERP and PLM data. Ask for a short review.
Related Tools
Machinery Project Change Order Request Template
A change order request for engineer-to-order machinery projects, recording the scope change, price and schedule impact, and customer approval.
Industry TemplatesMachine Punch List Tracker Worksheet
An editable punch list for machinery projects: log open items found at FAT, SAT or start-up, rank by severity, assign owners and total the cost to close.
Safety & WorkforceMachine Operator Training Plan Template
A training plan and attendance record for handing over a new machine, covering operation, safety, changeover and maintenance modules.
Costing & FinanceMachine Build Engineering Hours Estimate Worksheet
An editable estimate of engineering hours by discipline and task for an engineer-to-order machine, with rates, contingency and cost per line.
More Safety & Workforce tools
See all- Overall Labor Effectiveness (OLE) Calculator
- Hazard Identification and Risk Ranking Worksheet
- Forklift Pre-Shift Inspection Checklist Template
- Forklift Pre-Shift Inspection Checklist
- LOTO Lockout Tagout Periodic Inspection Checklist
- Welder Qualification Record Worksheet (WPQ Tracker)
- Welder Continuity Log Worksheet
- Welding Hot Work Safety Checklist
- Shift Schedule Template (2-2-3 and 4 On 4 Off)
Keep exploring
Free tools
- Machinery Safety Standards Reference (Type A, B, C)Quick lookup of the core machine safety standards, what each covers and where it fits in the A, B, C hierarchy.
- Machine Operator Training Plan TemplateA training plan and attendance record for handing over a new machine, covering operation, safety, changeover and maintenance modules.
- Machine Shop Safety ChecklistAn OSHA-aligned safety, housekeeping and 5S checklist for machine shops with suggested audit frequency and practical examples.
ERP fixes and how-tos
- Epicor Function Examples: Update a Table, Call It, Schedule ItWorked Epicor Kinetic Function examples: updating a table, calling a function from a BPM, Application Studio or REST, and scheduling a recurring run.
- How to create and call an Epicor FunctionHow to create Epicor Functions in Function Studio: define inputs and outputs, write the C# widget, test, then call the function from a BPM directive.
- Epicor Function Custom Code: C# Signature, Parameters and Calling ItWrite custom C# code in Epicor Functions: signature, request and response parameters, libraries, calling from BPM and Application Studio, with working examples.
Guides
- SyteLine Safety Stock Calculation Methods and Setup GuideConfigure safety stock calculations in Infor SyteLine using statistical methods, service level targets, and demand variability for optimal buffer inventory.
- Reusable Script Function Library for SyteLine DevelopmentReusable SyteLine script function library. Copy-paste patterns for property access, IDO calls, validation, formatting, and UI control in CloudSuite Industrial forms.
- How to Configure Safety Stock Parameters in Infor SyteLineStep-by-step guide to configuring safety stock parameters in Infor SyteLine. Learn how to set reorder points, buffer quantities, and demand-driven safety stock calculations.
AI on your ERP
- AI for ERP in Industrial Machinery and Engineer-to-Order ManufacturingPrivate AI on your ERP for machinery builders: quote history, EBOM to MBOM changes, project cost to complete, long-lead buys and FAT punch lists.
- Evaluating SAP for Industrial AI in Manufacturing: Strengths, Gaps and How to DecideAn honest look at SAP for manufacturing industrial AI: Digital Manufacturing, asset performance and Joule, where they fit and where gaps remain.