Machinery Quote Price Calculator from Target Margin and Contingency
The classic pricing error in machine building is adding the margin percentage to cost as if it were a markup. This calculator works backward from the margin on price you want, after contingency, warranty reserve and commission.
Your numbers
Your results
Estimating aid. Replace rates and percentages with your own costed standards and review the result with finance before quoting.
Quote price vs target margin
Sweeps Target margin from 10 to 50, holding your other inputs fixed.
Standard cost feeds for quotes
Optional: ask how ERP standard costs could feed an estimating template.
Optional. The tool and every export work without this. No spam.
How to use it
Enter the purchased material total from your bill of materials, assembly hours with a fully loaded shop rate, engineering hours for mechanical, controls and software, and the estimated freight, crating and commissioning cost. Choose a contingency percentage applied to direct cost. Then enter warranty reserve and sales commission as percentages of price, and the margin you want as a percentage of price. The calculator returns the price that delivers exactly that margin, the markup this implies on the cost base and the margin in currency. Move the target slider or read the chart to compare price points.
Why margin is not markup
A 28 percent margin on price needs a markup of about 39 percent on cost, not 28. In formula form, price equals cost base divided by one minus the sum of target margin, warranty percent and commission percent, where each is a fraction of price. The calculator therefore divides by the share of price left to pay for cost. Items that scale with price, such as commission, must be in the divisor rather than added to cost, otherwise the real margin on the invoice will be lower than planned. The divisor is protected from falling below 0.01.
- Margin = (price - cost) / price.
- Markup = (price - cost) / cost.
- Percent-of-price items belong in the divisor.
Choosing contingency
Contingency should reflect how well the scope is defined. A repeat design with a stable bill of materials might carry 3 to 5 percent, while a first-of-kind line with software development and unknown customer interfaces may justify 10 to 15 percent or more. Applying it only to direct cost, as here, keeps it separate from the margin so it is visible and can be released if the project finishes well. Do not hide contingency in inflated hours, because it becomes impossible to review later.
Common mistakes
Estimators often forget internal engineering hours, price at standard rate rather than loaded rate and omit commissioning travel. They also add margin on top of a price that already includes commission. When a customer asks for a discount, calculate the new price and the new margin in currency before agreeing, because a 5 percent discount on price removes much more than 5 percent of margin. Link your estimate to the ERP item and routing costs so the rates are current.
Frequently Asked Questions
What is the difference between margin and markup?
Margin is profit divided by selling price, while markup is profit divided by cost. A 25 percent margin equals a 33 percent markup. Mixing them up is one of the most common quoting errors in engineered equipment.
Should commission be a cost or a percentage of price?
It should be modeled as a percentage of price if that is how you pay it. That way, any change in price automatically moves the commission, and your target margin stays correct. Adding it to cost understates the required price.
How much contingency should I add?
Match it to uncertainty. Repeat designs with firm supplier quotes may need very little, while new designs, tight schedules and custom software justify more. Record the reason for the percentage so it can be reviewed after the job.
Does the quote include currency and tax?
No. The calculator is currency neutral and excludes sales tax or VAT. If you buy components in another currency, add a hedge or an exchange rate buffer to material before using the tool.
If estimates start in spreadsheets today, we can help connect them to ERP standard costs so every quote uses the same rates.
Related Tools
Liquidated Damages Delay Exposure Calculator
Estimate the liquidated damages you would pay for late delivery under a per-week rate, grace period and cap, and what is left of project margin.
Costing & FinanceOEM Warranty Reserve Accrual Calculator
Turn units sold, claim rate and average claim cost into an expected warranty reserve, net of supplier recovery, with a sensitivity chart.
Costing & FinanceAdvance Payment Guarantee and Performance Bond Cost Calculator
Estimate bank guarantee fees, cash collateral cost and the financing benefit of the customer advance to see if the terms are worth it.
Costing & FinanceCNC Job Quote Estimate Worksheet
An editable CNC quote worksheet that rolls material, setup, run time and outside services into a price per part.
More Costing & Finance tools
See all- Project Milestone Billing Worksheet for Machine Builders
- Machine Build Engineering Hours Estimate Worksheet
- Machine Warranty Reserve Calculator
- Percentage of Completion Cost-to-Cost Revenue Calculator
- Spare Parts Attach Rate Aftermarket Revenue Calculator
- SAP QM Inspection Effort and Cost Calculator
- SAP Standard Cost Estimate BOM Rollup Calculator
- Legacy ERP Retirement Cost and Payback Calculator
- JD Edwards World Month-End Close Procedure Template
Keep exploring
Free tools
- ERP Implementation Contingency Reserve CalculatorEstimate how much contingency to hold on an ERP project based on complexity drivers such as sites, integrations, data quality and customization.
- Machine Warranty Reserve CalculatorEstimate expected warranty claims and the reserve to book per machine and per year, and see how warranty length changes the cost.
- ERP Project Contingency Reserve CalculatorTurn four common ERP risk areas into a probability-weighted contingency reserve and a total budget you can defend.
ERP fixes and how-tos
- Infor VISUAL Price Book: How Customer Pricing and Price Breaks Are Set UpHow selling prices, quantity breaks and customer pricing are organized in Infor VISUAL, how to maintain them, and how to find why an order picked a price.
- Price Book Session in Infor LN: Setup and Order PricingHow price books work in Infor LN sales pricing: where they are maintained, how they link to price lists and order lines, and how to troubleshoot a price not found.
Guides
- Why Custom Machine Projects Lose Margin After the Quote Is WonThe common reasons ETO machine builders win the quote but lose the margin: engineering overruns, unpriced changes, rework, warranty, and how to measure each.
- ERP for Industrial Machinery Manufacturers: ETO, Configuration, and AftermarketERP for industrial machinery manufacturers: engineer-to-order quoting, configurators, project accounting, aftermarket service parts and field service needs.
- How to Estimate Engineering Hours for Custom Machinery ProjectsHow machine builders estimate mechanical, controls and software engineering hours for custom equipment quotes, and how to stop under-quoting design labor.