Disaster Recovery Plan Template for Manufacturing IT

When the ERP or the plant network goes down, nobody wants to write the plan from scratch. This template gives IT managers in manufacturing a ready structure: recovery objectives, roles, declaration criteria, recovery order, manual fallback and testing. Fill in the fields and export it as a Word or PDF document.

Fill in

Live preview
Free, optional. Reopen it on any device.
Download:

Manufacturing IT Disaster Recovery Plan Template

Disaster Recovery Plan: Plant 1, Dayton

Company: Acme Precision Ltd Plan owner: IT Manager Version: 1.0 Date: 2026-10-20 Systems in scope: Infor SyteLine 10 (on-premise, 2 VMs); MES server, 3 SCADA servers, historian

1. Purpose and scope

This plan describes how Acme Precision Ltd restores IT services at Plant 1, Dayton after an event that stops them, such as ransomware, hardware failure, fire, flood or loss of power or network. It covers ERP, MES, plant floor servers, network and user access. It does not replace safety or evacuation procedures.

2. Recovery objectives

SystemRTO (time to restore)RPO (data loss tolerance)Priority
ERP: Infor SyteLine 10 (on-premise, 2 VMs)8 hours1 hour1
MES: MES server, 3 SCADA servers, historian4 hours1
Network core and firewalls1
Directory services and authentication1
Email and collaboration2
Engineering and PLM file shares2

3. Roles and contacts

RoleNamePhoneBackup person
Incident commander
IT recovery lead
ERP administrator
Network and security lead
Plant operations lead
Communications lead
ERP and backup vendor contacts

4. Declaring a disaster

The incident commander declares a disaster when a priority 1 system is expected to be unavailable longer than its RTO, when data corruption or malicious activity is confirmed, or when the building or server room is unusable. Record the time of declaration, the decision maker and the first known cause. Isolate affected systems from the network before restoring anything.

5. Recovery approach

Recovery site: Secondary data center, Columbus, plus cloud backup vault

Backup approach: Hourly database log backups, nightly full backups, weekly offsite copy to immutable storage. Restore tested quarterly.

Recovery order: 1) network, firewalls and authentication; 2) database and ERP application servers; 3) MES and plant floor servers; 4) printers, label and barcode services; 5) secondary services. Verify backups are clean before restoring after a malware event.

6. Manual operations fallback

Paper travelers and printed schedules held at each cell. Shipping uses manual packing lists. Receiving logs to a spreadsheet until ERP returns.

7. Recovery steps and verification

StepActionOwnerTarget timeDone
1Isolate affected systems and preserve logs
2Confirm which backup set to restore
3Restore network and authentication
4Restore ERP database and application tier
5Run ERP smoke test: log in, view order, post a test receipt
6Restore MES and plant interfaces, verify scanner and label printing
7Reconcile transactions entered during the outage
8Notify users and customers that service is restored

8. Communication

The communications lead informs plant management, customers with open shipments, key suppliers and, where required, regulators and insurers. Use a channel that does not depend on the affected systems, such as personal mobile phones or an external messaging service. Keep a time-stamped log of decisions.

9. Testing and maintenance

Test frequency: Twice a year. Each test records the date, scenario, actual restore times against RTO and RPO, problems found and owners for fixes. Review this plan after any major change to the ERP, network, plant systems or key staff.

Approvals

IT Manager / Date
Plant Manager / Date
Finance or Risk owner / Date

A starting point to adapt, not legal or insurance advice. Insert your real RTO and RPO values based on the cost of downtime, and test the plan with an actual restore. Keep a printed copy offsite because the plan is no use if it is stored only on the failed server.

Optional review of your DR plan

Send us your completed plan and we will comment on gaps in the ERP and plant recovery sequence.

Optional. The tool and every export work without this. No spam.

Was this tool useful?

How to use the template

Complete the fields at the top, then edit the tables for your own systems and people. Start with recovery objectives: agree with plant and finance leaders how long each system can be down (RTO) and how much recent data you can afford to lose (RPO). Those numbers drive backup design and cost. Print the final document and store copies offsite, because the soft copy may be on the server that failed.

  • Get plant and finance sign-off on RTO and RPO
  • Name a backup person for every role
  • Keep a printed contact list that works without email

The thinking behind the structure

The plan follows common IT continuity practice: define scope, set recovery objectives per system, assign roles, define when a disaster is declared, restore in dependency order, communicate, and test. Dependency order matters in manufacturing: authentication and network must return before the ERP database, and the ERP before integrations such as MES, EDI and label printing. The manual fallback section recognises that production often continues on paper while systems recover.

Checking your plan against reality

A plan is only credible if restore times were measured. Run a test restore of the ERP database to a spare server and write down the elapsed time, then compare it with the RTO. Test that a user can log in, view an order and post a receipt. Check that you can find licence keys, service accounts and vendor contacts without the failed systems. Many plans fail on small items such as an encryption key stored on the server that burned.

Common mistakes

Common failures include RTO values that nobody agreed to, backups that were never restored, and a recovery site that lacks the licences or capacity to run the ERP. Another is ignoring the plant: scanners, label printers and SCADA servers are often outside the IT backup scope. Teams also forget to plan the return of data entered on paper, which needs a reconciliation step. Review the plan after every major system change.

Frequently Asked Questions

What is the difference between RTO and RPO?

RTO is how long a system can be unavailable before the impact is unacceptable. RPO is how much recent data you can afford to lose, measured as time. An RPO of one hour means backups or replication must capture changes at least hourly.

How is a DR plan different from a backup policy?

Backups are one ingredient. A DR plan covers the people, order of recovery, decisions, communication and testing that turn backups into a working service again. Without it, teams lose hours deciding what to do first.

How often should we test the plan?

At least yearly for a full scenario and more often for restore tests of critical systems such as the ERP database. Test after major changes to infrastructure, cloud services or the ERP version.

Does this template meet ISO 27001 or customer audit requirements?

It provides a structure commonly expected in such audits, but each standard and customer has its own wording and evidence needs. Treat it as a starting document and adapt it with your auditor or compliance owner.

If you want help turning this plan into tested runbooks for your ERP, Netray can review your ERP recovery steps and automate verification checks. We work with partner ERP specialists where needed.

Get ERP alerts and new tools

Support deadlines, release changes and new free tools for the ERP you run. A couple of emails a month at most.

Free. Unsubscribe with one click from any email.

ArchRay builder
Design the on-prem AI stack: model, GPUs, RAG pipeline, guardrails
See memory, speed and cost as you swap parts, then export the diagram. Free, in your browser.
Open the builder

Keep exploring

Free tools

ERP fixes and how-tos

Guides

Comparisons