Plant IT and OT Asset Inventory Worksheet
You cannot patch, segment, insure or replace what you do not know you have. This worksheet is a practical asset register for a manufacturing plant that covers both IT (servers, workstations) and OT (PLCs, HMIs, industrial switches), tagged with Purdue zone and support dates, and exports to Excel.
| Asset ID | Description | Type | Purdue zone | Owner | OS or firmware | Vendor support ends | Age (years) | Planned life (years) | Life remaining (years) | Qty | Replacement cost each | Replacement budget | |
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
1 | $18,000 | ||||||||||||
-1 | $12,000 | ||||||||||||
2 | $4,400 | ||||||||||||
4 | $19,000 | ||||||||||||
6 | $7,500 | ||||||||||||
2 | $9,600 |
Add one row per asset or per identical group. Sort by vendor support end date to find end-of-life items, and by zone to see which Purdue levels hold the oldest equipment. Negative life remaining means the asset is past its planned life.
Optional help loading assets into your ERP
Tell us your ERP and we will outline how to map this register to its asset or equipment records.
Optional. The tool and every export work without this. No spam.
How to use the worksheet
Replace the sample rows with your own. Walk the server room, control cabinets and production cells, and record each asset once with a stable ID. Fill in zone, owner, software or firmware version and the vendor support end date from the vendor's lifecycle page. Planned life and age give a remaining-life figure per row, and quantity times replacement cost gives a budget. Export to Excel and sort or filter by the columns that matter to you.
- Start with the most critical lines, then expand
- Use the asset tag on the device as the ID
- Record firmware versions, not just model names
What to record and why
The minimum useful set is identity, location or zone, owner, software version, support end and cost. Zone shows whether a device sits in the plant or the enterprise network, which feeds segmentation work. Owner makes sure someone answers for patching. Support end dates reveal operating systems that will soon lose security updates, which is a recurring issue with HMIs on old Windows versions. The replacement cost line helps turn a technical problem into a budget request.
Reading the results
Sort by life remaining to see what needs budget in the next one to three years. Sort by support end to see what will stop receiving vendor fixes. Group by zone to find old equipment in sensitive layers, for example an unsupported HMI at Level 2. The total replacement budget is a rough planning figure, not a quote. Treat a PLC at ten years old differently from a laptop at ten years old, because the replacement effort and risk differ by far more than the price.
Common mistakes
A one-off spreadsheet that nobody updates is the main failure, so name an owner and a review date, ideally tied to change management. Another is inventorying only IT devices and leaving out OT assets that vendors maintain. Teams also forget virtual machines and cloud services, which belong in a separate sheet or additional rows. If you can, compare the register against a network scan or switch MAC tables to find devices nobody listed.
Frequently Asked Questions
How is an OT asset inventory different from an IT one?
OT assets such as PLCs and HMIs often lack agents, scan poorly and are maintained by vendors or controls engineers, so inventory needs walkdowns and passive discovery. They also have longer lifecycles and firmware rather than regular patches.
How often should the inventory be updated?
Review at least yearly, and update whenever equipment is installed, moved or retired. Linking it to change management is the most reliable way to keep it current.
Should software licenses be included?
Track them in a separate sheet or add columns if you prefer one register. The key link is software or firmware version per device, since that decides patching and support status.
Can this replace a CMDB or asset management tool?
For a single plant or a start, yes. Larger companies with many sites outgrow a spreadsheet and need a CMDB or OT asset discovery tool. The worksheet is also a good requirements list when evaluating those tools.
If you want your asset register to feed ERP maintenance and spares planning, Netray can help connect it to your ERP asset module. Ask for a short scoping call.
Related Tools
Plant Network Segmentation Checklist (Purdue Model)
A 30-item checklist for checking whether your plant network follows Purdue model segmentation, from field devices up to the ERP layer.
Compliance & ContractsOT Security Readiness Assessment (IEC 62443)
A quick maturity self-assessment for plant OT security that follows the main themes of IEC 62443, with a score band and prioritised actions.
ERP OperationsPlant Server Patching Schedule Worksheet
Plan patch cycles for ERP, MES, file and domain servers with owners, plant-safe windows and total labor hours, then export to Excel.
ERP OperationsERP Server Sizing Calculator
Rough-size application and database servers for an ERP from named users, concurrency, database size and growth, with headroom.
More ERP Operations tools
See all- Manufacturing IT Disaster Recovery Plan Template
- Plant IT Change Advisory Board RFC Template
- Plant IT Outage Incident Report Template
- Plant IT Patch Window Duration Calculator
- Plant IT Change Request (CAB) Form Template
- ERP License Audit Risk Assessment
- ERP Support Cost Benchmark Calculator
- IT Ticket Backlog Cost Calculator
- ERP Database Growth Forecaster
Keep exploring
Free tools
- OT Asset Inventory WorksheetAn editable inventory of operational technology assets with Purdue level, firmware, support status and a criticality times exposure risk score.
- OT Network Change Request Form TemplateA change request form for firewall rules, switch configs and new devices on the plant network, with risk, rollback and production safety approval.
- Plant Network Segmentation Checklist (Purdue Model)A 30-item checklist for checking whether your plant network follows Purdue model segmentation, from field devices up to the ERP layer.