Molding Defect and Reject Log Worksheet
A defect log lets you see which defects, molds and presses cost the most. Enter each reject event and the sheet calculates the reject rate and scrap cost, so you can fix the expensive problems first and keep a record for customers.
| Date | Press | Mold | Defect | Parts inspected | Rejects | Reject rate | Cost per part | Scrap cost | |
|---|---|---|---|---|---|---|---|---|---|
3% | $15 | ||||||||
1.2% | $9 | ||||||||
3% | $21 | ||||||||
1.2% | $12 | ||||||||
4.1% | $22 |
Use the cost per part that your finance team recognizes, usually material plus conversion cost up to the point of rejection. Sort by scrap cost, not by count, to pick the next problem to attack.
Connect rejects to ERP scrap postings
Optional: look at how defect reasons can flow into your ERP scrap and cost reports.
Optional. The tool and every export work without this. No spam.
How to use the log
Log each defect event with the date, press, mold, defect type and the counts of parts inspected and rejected. Enter the cost of a part at the point it was rejected. The sheet then calculates the reject rate for the row and the scrap cost. Review totals weekly and sort by scrap cost to see where money is lost, rather than where noise is greatest.
- Use consistent defect names across shifts
- Count what you inspected, not only what you rejected
- Use a realistic cost per part
- Review weekly with the setters and quality
Common molding defects and first checks
Short shots often point to insufficient shot size, low melt or mold temperature, restricted venting or a blocked gate. Flash suggests excessive pack pressure, worn parting lines or low clamp force. Sink marks come from thick sections with insufficient pack or cooling. Splay is commonly moisture or degraded resin. Black specks suggest contamination or carbon from over heated material. Treat these as first checks, then confirm with your own process data.
- Short shot: shot size, melt temperature, venting, gate
- Flash: pack pressure, clamp force, parting line wear
- Sink: pack time, gate size, wall thickness
- Splay: drying and residence time
Reading the numbers
The overall reject rate is calculated as total rejects divided by total inspected, so large inspection samples carry more weight. Be careful comparing rates across jobs with different inspection plans. A press with a low rate may simply be inspected less. Where possible, track the same defect category on the same mold over several weeks to see if a corrective action holds.
Common mistakes
Too many defect categories make reporting messy, and too few hide cause. Using Other for everything is the usual failure. Another mistake is logging only the worst shifts, which skews the picture. Finally, do not treat a high reject rate as a process failure until you confirm the inspection criteria are correct and stable.
Frequently Asked Questions
What is an acceptable reject rate in injection molding?
It varies widely by part and industry. Commodity parts may target well under one percent, while cosmetic or medical parts may have different expectations. Set your target against your own cost and customer requirements.
Should regrind and purge be counted?
Track them separately if they are significant. This log focuses on rejected parts. Purge and startup scrap can be logged with a defect type of Other and a note.
How is scrap cost calculated?
It multiplies rejects by the cost per part you enter. Choose material plus conversion cost, and add secondary operations if the part was already processed.
Can I add a root cause column?
Yes. Export to Excel and add columns for cause and corrective action, or use a separate 8D or corrective action report for serious events.
If your scrap and reject reasons are posted in an ERP, we can help connect them to this kind of log so one entry feeds both quality and cost reports.
Related Tools
Molded Part First Article Inspection Report Template
A fill-in first article report for molded parts covering material, mold, cavity measurements and approval.
Industry TemplatesInjection Molding Process Sheet Template
A fill-in setup sheet that records the validated process window for a mold, press and resin, ready to print or export.
Quality & InspectionResin Lot and Dryer Log Worksheet
Record resin lots, dryer settings and drying hours, and see at a glance which lots were under dried.
Costing & FinanceRegrind Blend and Runner Share Calculator
Find out how much of each shot is runner, how much regrind you make per hour, and whether your allowed blend ratio can absorb it.
More Quality & Inspection tools
See all- Injection Mold Qualification Report Template
- Injection Molding Defects, Causes and Fixes Reference
- Injection Moulding Quality Control Checklist
- SAP QM Process Capability Cp Cpk Calculator
- SAP QM Lot Rejection Rate, PPM and Sigma Level Calculator
- SAP QM Gauge R&R Study Calculator
- SAP QM Cp and Cpk Capability Calculator
- Job Shop Material Certification Log Worksheet
- Job Shop First Piece Inspection Sign-Off Template
Keep exploring
Free tools
- Injection Molding Process Sheet TemplateA fill-in setup sheet that records the validated process window for a mold, press and resin, ready to print or export.
- Molding Scrap and Cycle Time SQL Query GeneratorGenerate generic SQL for molding scrap rate by tool and press, cycle time against standard, and mold shot-count maintenance alerts.
- Mold Changeover Time Log WorksheetLog each mold change by phase, total the minutes and see which jobs miss your changeover target.
Guides
- Tracking Scrap, Runners and Regrind in Your Injection Molding ERPHow injection molders track scrap, runners and regrind in the ERP: reason codes, material reconciliation, regrind blend limits and costing the recovered resin.
- Injection Molding Production Scheduling: Matching Molds, Presses and ResinHow to schedule injection molding: match molds to presses by tonnage and shot size, plan changeovers and resin drying, and keep capacity honest with real cycle data.
- Best ERP for Injection Molders: What to Check Before You BuyWhat to look for in ERP for injection molders: mold and press tracking, resin lots, MES integration, scrap and regrind, and how DELMIAworks, Plex and Epicor compare.
AI on your ERP
- AI on Infor SyteLine for Plastics Injection Molders: Presses, Molds, Resin and ScrapAI on Infor SyteLine for injection molders: mold and press scheduling, resin and regrind lots, scrap and cycle variance, on-prem and read-only by default.
- AI for DELMIAworks in Injection Molding: Resin, Molds, Presses and Scrap From Your Own DataPrivate AI on DELMIAworks for injection molders: resin and regrind, mold PM, press scheduling, scrap and cycle-time variance, read-only and on-prem.
Manufacturing hubs
- Plastics Industry Association (PLASTICS): Molders, Processors and ERP RealitiesHow injection molders and plastics processors work in the PLASTICS ecosystem: NPE, safety standards, quoting, ERP and MES, and private AI on shop data.
- Ningbo and Yuyao, Zhejiang: Molds, Plastics and Hardware ManufacturingGuide to Ningbo and Yuyao manufacturing: mold making, injection molding and hardware, the port, typical ERP and quoting problems, and where private AI helps.