MRP Planning Terms Glossary (Searchable Reference Table)

MRP conversations go wrong when two people use the same word for different things. This table gives the standard meaning of each term and shows where the planner meets it in an ERP planning run.

Download:
TermShort formMeaningWhere a planner sees it
Gross requirements
GR
Total demand for an item in a time bucket before any supply is considered
Top row of the MRP record; from forecasts, customer orders and parent planned orders
Scheduled receipts
SR
Supply already committed, such as open purchase orders and released production orders
Second row of the MRP record, dated to expected receipt
Projected available balance
PAB
Expected on-hand stock at the end of a bucket after demand and supply
Row that triggers a new order when it falls below zero or safety stock
Net requirements
NR
The shortage left after on-hand stock and scheduled receipts are applied to gross requirements
Drives the size and date of a planned order
Planned order receipts
POR
Quantity MRP proposes to be received to cover net requirements
Shown by lot size rule; becomes a planned order in the system
Planned order releases
PORel
The same planned orders shifted earlier by the lead time
The date a buyer or shop must start the order
Lead time offset
LT
Time subtracted from the need date to get the order release date
Item master lead time fields, routing times, vendor lead time
Safety stock
SS
Buffer quantity planned to remain on hand to absorb demand or supply variation
MRP treats stock below this level as a shortage
Safety lead time
SLT
Extra days added so supply arrives before the need date
Alternative to safety stock when timing is the risk
Lot sizing rule
LS
Rule that converts net requirements into order quantities
Item planning parameters such as lot for lot, fixed or periodic quantity
Low level code
LLC
Lowest BOM level at which an item appears; MRP plans an item only after all its parents
Calculated at BOM change or net change run start
Bill of material
BOM
Structured list of components and quantities needed to make one parent
Explosion step that converts parent orders into child gross requirements
Explosion
Converting planned parent orders into dependent component demand through the BOM
Core MRP processing step each run
Netting
Offsetting gross requirements against available stock and scheduled receipts
Core MRP processing step each run
Pegging
Trace from a supply or requirement back to the demand that created it
Pegging or where-used-by-demand screens and reports
Net change planning
NC
Run that replans only items with changes since the last run
Daily or intra-day planning runs
Regenerative planning
Run that recalculates all planned items from scratch
Weekly or after major data changes
Planning horizon
How far into the future MRP plans
Run parameter; must cover cumulative lead time of the longest item
Time bucket
Unit of time used to group demand and supply, such as day or week
Planning calendar and MRP record column width
Demand time fence
DTF
Near-term window inside which forecast is ignored and only firm orders count
Item master planning time fence fields
Planning time fence
PTF
Window inside which MRP does not automatically change or create orders
Item master planning time fence fields
Firm planned order
FPO
Planned order protected from automatic MRP changes
Planner action to freeze a proposal
Action message
System suggestion to release, expedite, defer, cancel or change quantity of an order
Exception list the planner works through each day
Dependent demand
Demand for an item calculated from demand for its parent
Component requirements created by explosion
Independent demand
Demand from outside the plan such as customer orders, forecasts and service parts
Entered at end item level
Master production schedule
MPS
Plan of what end items will be built and when, which feeds MRP
Planned at end item or key item level
Available to promise
ATP
Uncommitted supply that sales can promise to new orders
Order promising and availability checks
Yield or scrap factor
Allowance that increases the gross quantity to cover expected losses
BOM component scrap and item yield fields
Phantom item
Subassembly that is exploded through rather than stocked or ordered
Item type or BOM flag in most ERPs
Order multiple
Increment to which order quantities are rounded up
Purchasing or lot size rounding fields

Term names vary slightly between APICS style material and individual ERP products. Field names in your own system may differ, so check your vendor documentation.

Planner question helper

Optional: see how plain-language planning questions can be answered from your own ERP data, read-only and on-prem if required.

Optional. The tool and every export work without this. No spam.

How to use the glossary

Type part of a term in the search box, or scan the Where a planner sees it column to learn which screen or field the term maps to. The table exports to Excel or PDF, so you can attach it to a new planner's onboarding pack or an ERP implementation workbook. Terms are ordered roughly in the sequence an MRP run processes them: demand, supply, balance, orders, then controls.

The MRP record in one paragraph

Every MRP record is the same grid: gross requirements, scheduled receipts, projected available balance, planned order receipts and planned order releases per time bucket. The balance starts at on-hand stock. Each bucket adds receipts and subtracts demand. If the balance would drop below zero or below safety stock, MRP creates a planned order receipt in that bucket sized by the lot rule, then offsets it earlier by the lead time to get the release.

Terms people confuse

Several pairs cause repeated mistakes in planning reviews.

  • Gross vs net requirements: net is after stock and receipts, gross is before.
  • Scheduled receipt vs planned order: a receipt is committed, a planned order is only a proposal.
  • Demand time fence vs planning time fence: one controls which demand counts, the other controls whether MRP may change orders.
  • Safety stock vs safety lead time: quantity buffer versus timing buffer.
  • Net change vs regenerative: partial replan versus full replan.

Frequently Asked Questions

Is gross requirement the same as demand?

Gross requirement is the total demand placed on an item in a time bucket, including dependent demand created by parent orders and independent demand from customers or forecasts. It is demand before any stock or receipts are used to cover it.

What is the difference between a planned order and a scheduled receipt?

A planned order is a proposal created and changed freely by MRP. A scheduled receipt is a committed order such as a released shop order or a confirmed purchase order. MRP counts both as supply but only changes planned orders automatically.

Why does low level code matter?

MRP must know all demand for an item before it nets that item. The low level code sequences the run so a component is planned only after every parent that uses it, even if the component appears at several BOM levels.

Do all ERPs use the same MRP terms?

The concepts are common but the field names differ. For example some systems call the planning time fence a frozen period, and some split lot sizing into several procedure codes. Use this table for meaning and your vendor guide for field names.

If your planners still translate these terms between spreadsheets and the ERP, we can show how an AI assistant answers planning questions directly from your live MRP data.