NDT Methods Comparison Chart: Which Test Finds What
Choosing between penetrant, magnetic particle, ultrasonic or radiographic testing starts with what you need to find and where it sits in the part. This chart gives a quick side by side so you can have an informed conversation with your NDT supplier.
| Method | Abbrev. | Typically finds | Reach | Main limitations |
|---|---|---|---|---|
Visual testing | VT | Surface discontinuities, weld profile, corrosion, misalignment | Surface | Depends on lighting, access and inspector skill |
Liquid penetrant testing | PT | Surface breaking cracks, laps, porosity | Surface breaking only | Needs clean, non porous surface; smeared metal can hide cracks |
Magnetic particle testing | MT | Surface and near surface cracks and laps | Surface and slightly subsurface | Ferromagnetic materials only; field direction matters |
Ultrasonic testing | UT | Internal flaws, laminations, thickness loss, weld defects | Volumetric | Needs couplant and skilled interpretation; rough or complex geometry is hard |
Phased array ultrasonic testing | PAUT | Weld flaws, corrosion mapping, composite defects | Volumetric | Equipment cost and procedure development effort |
Radiographic testing | RT | Porosity, inclusions, voids, lack of fusion, wall thickness | Volumetric | Radiation safety controls; tight planar cracks may be missed if misaligned |
Computed tomography | CT | 3D internal voids, porosity, assembly condition | Volumetric | Part size and density limits; high cost per part |
Eddy current testing | ET | Surface and near surface cracks, conductivity, coating thickness, tube wall loss | Surface and near surface | Conductive materials only; limited depth |
Leak testing | LT | Leaks in vessels, seals and welds | Through wall | Method must match required leak rate and medium |
Acoustic emission testing | AE | Active crack growth and corrosion in loaded structures | Whole structure | Needs loading and noise control |
Infrared thermography | IR | Delaminations, disbonds, moisture, hot spots | Near surface | Needs thermal contrast and emissivity control |
Positive material identification | PMI | Wrong alloy or grade | Surface composition | Light elements such as carbon are not read by common XRF units |
This is a screening guide for method selection. The applicable specification, drawing note or customer flow down decides the method, procedure and acceptance criteria. NDT personnel are usually qualified to a written practice such as ASNT SNT-TC-1A or an equivalent standard.
Connect NDT records to supplier lots
Optional: we can explore how NDT certificates could be matched to purchase orders and inspection lots in your ERP.
Optional. The tool and every export work without this. No spam.
How to use the chart
Search by a defect name, material issue or method. Look at the Reach column first: surface methods cannot find buried flaws, and volumetric methods are usually not the first choice for fine surface cracks. Then check limitations against your material. For example, magnetic particle only works on ferromagnetic alloys, so aluminum or austenitic stainless parts need penetrant or eddy current instead.
Selecting and specifying NDT
Most of the time the customer or specification names the method and acceptance class. Where it does not, choose the method for the failure mode you fear most, then write the procedure reference, sample plan and acceptance criteria on the purchase order or inspection plan. Combine methods when needed, such as penetrant on machined surfaces plus ultrasonic on critical weld volumes.
- State the method and the governing standard on the PO
- Require certification level of the examiner
- Define 100 percent or sample inspection clearly
- Ask for written results to be attached to the lot
Common mistakes
Treating NDT as a pass or fail stamp without checking the procedure, using penetrant after shot peening or heavy machining that has smeared the surface, and forgetting post inspection cleaning and demagnetizing. Also confirm that the subcontractor holds the right scope of accreditation or customer approval, because many aerospace primes approve NDT sources by process.
Frequently Asked Questions
Which NDT method is best for surface cracks?
Liquid penetrant works on most nonporous materials and finds surface breaking cracks. Magnetic particle is faster on ferromagnetic parts and also finds shallow subsurface flaws. Eddy current suits conductive parts and automated scans.
Why can't magnetic particle testing be used on aluminum?
It relies on a magnetic flux leakage pattern that attracts iron particles. Aluminum and austenitic stainless steels are not ferromagnetic, so no usable leakage field forms. Use penetrant or eddy current instead.
Is radiography better than ultrasonic testing?
Neither is better in general. Radiography gives a permanent image and suits volumetric flaws like porosity. Ultrasonic finds planar flaws such as cracks and lack of fusion more reliably and has no radiation hazard.
Who qualifies NDT personnel?
Employers qualify and certify personnel under a written practice based on a standard such as ASNT SNT-TC-1A, ISO 9712 or NAS 410 for aerospace. Customer flow downs may add requirements.
If NDT results arrive as PDFs from subcontractors, Netray can help tie them to purchase orders and inspection lots in your ERP.
Related Tools
Rockwell Hardness Scales Reference
Lookup table of the common Rockwell scales with indenter type, minor load, total load and the materials each scale is normally used for.
Quality & InspectionVisual Defect Severity Classification Reference
Starting list of common inspection defects with a suggested severity class and why, to speed up writing your own defect classification procedure.
Quality & InspectionSupplier Lot Rejection Notice Template
Fill in and export a formal notice telling a supplier a lot failed incoming inspection, with defect detail, sample results and requested actions.
Quality & InspectionInspection Station Audit Checklist
Audit an incoming, in process or final inspection station for gauges, calibration, environment, documentation and nonconforming material control.
More Quality & Inspection tools
See all- SAP QM Process Capability Cp Cpk Calculator
- SAP QM Lot Rejection Rate, PPM and Sigma Level Calculator
- SAP QM Gauge R&R Study Calculator
- SAP QM Cp and Cpk Capability Calculator
- Job Shop Material Certification Log Worksheet
- Job Shop First Piece Inspection Sign-Off Template
- Job Shop Scrap and Rework Cost Calculator
- Master Data Audit Sample Size Calculator
- Data Quality Sigma Level Calculator
Keep exploring
Free tools
- Product Costing Methods Comparison ReferenceA searchable table comparing the main manufacturing costing methods on what they include, whether they are acceptable externally and where each one misleads.
- Infor LN Integration Methods ReferenceA comparison table of the main ways to move data in and out of Infor LN, with typical use, direction and cautions.
- Nadcap Audit Checklist with NDT Self-AssessmentSelf-assessment checklist for Nadcap audit prep, covering quality system, personnel, equipment, process control and a dedicated NDT section.
ERP fixes and how-tos
- ERP Selection in 2026: Where AI Actually MattersA CIO checklist for weighing AI capability in an ERP selection: what to actually test in a demo, which vendor AI claims are real, and where AI should not decide the vendor.
- SYSPRO costing methods: standard, average, FIFO and last costWhat each SYSPRO costing method means, where it is set per stock code, how it changes WIP and variances, and what to check before you switch methods.
- NetSuite or Infor: which fits a growing manufacturer in 2026A practical comparison of NetSuite and Infor (SyteLine/CSI, LN) for growing manufacturers in 2026: manufacturing depth, cost, integration, and AI roadmap.
Guides
- SyteLine Costing Methods Comparison GuideCompare SyteLine costing methods: standard, actual, average, and FIFO. Selection criteria, configuration, and impact analysis for manufacturers.
- Manufacturing ERP Selection: A Structured Decision FrameworkSelect the right manufacturing ERP with a structured decision framework. Functional requirements, TCO analysis, vendor evaluation, and risk assessment.
- SyteLine Safety Stock Calculation Methods and Setup GuideConfigure safety stock calculations in Infor SyteLine using statistical methods, service level targets, and demand variability for optimal buffer inventory.