Costing & FinanceFree calculatorPDF, Excel, Word exportNigeria

Nigeria Diesel Generator vs Grid Cost per kWh Calculator

Many Nigerian factories pay grid tariffs for part of the day and run diesel for the rest. This calculator shows the true blended price per kWh, and how much of the bill is driven by diesel, so you can decide where solar, gas or a demand change would pay.

Your numbers

kWh
40 %

The rest is generated on site.

NGN per kWh

Use your Disco bill rate for your band, including fixed charges spread over kWh.

NGN per litre
kWh per litre

Typical large set at good load: 3 to 3.8. Poorly loaded sets give much less.

NGN per kWh

Your results

Generator cost per kWh
425.625
Blended cost per kWh
338.975
Grid cost per kWh
209
Diesel used per month
22,500
Monthly electricity bill
NGN 40,677,000
Annual electricity cost
NGN 488,124,000
Generator premium over grid
2.0365
How many times more expensive a generated kWh is than a grid kWh.

Tariffs and fuel prices change often. Use the latest bill and invoice values, and add fuel logistics, losses and generator depreciation if you need a full cost.

Free, optional. Reopen it on any device.
Save results:

Blended cost per kWh vs diesel price

Sweeps Diesel price from 600 to 2500, holding your other inputs fixed.

Energy cost per unit report

Optional: a read-only report linking power and fuel cost to production output.

Optional. The tool and every export work without this. No spam.

Was this tool useful?

How to use it

Enter monthly kWh, the share that comes from the grid, your tariff, the diesel price and the generator efficiency in kWh per litre. Add the maintenance and operator cost per kWh. The chart moves the diesel price to show how fast the blended cost changes.

The formula

Generator cost per kWh equals diesel price divided by kWh per litre, plus maintenance per kWh. Blended cost is the weighted average of grid and generator cost using the grid share. Monthly bill equals consumption times blended cost. Diesel used equals generated kWh divided by kWh per litre.

Reading the result

With the defaults, a generated kWh costs several times a grid kWh, so a few extra hours of grid supply cut the bill sharply. Use the premium line to estimate the value of a grid improvement or an alternative source. Efficiency matters: a set running at light load can fall well below 3 kWh per litre.

Common mistakes

Plants often measure diesel cost from deliveries without accounting for stock changes, or ignore operator and servicing cost. Meter the generator output, not just fuel. In your ERP, post fuel and power costs to a cost centre so utilities per unit produced can be tracked monthly.

Frequently Asked Questions

What is a realistic kWh per litre?

A well-loaded modern diesel set typically produces about 3 to 3.8 kWh per litre. At low load the figure drops, sometimes below 2.5, so use a measured value from your own fuel log and kWh meter.

Does the grid tariff include fixed charges?

The tool takes one rate per kWh. If your bill has fixed charges, divide the total monthly bill by the kWh used and enter that effective rate for a fair comparison.

Can I use it for gas generators?

Yes. Replace diesel price with the gas price per unit and kWh per litre with the equivalent kWh per unit of gas. Keep the maintenance cost per kWh to match your supplier terms.

Why is the premium shown as a multiple?

A multiple is easy to communicate to management and shows how sensitive cost is to hours on grid. A figure above 3 usually means that self-generation is a major lever for margin.

If you want energy cost per unit produced inside your ERP reports, we can build a read-only dashboard using meter and fuel data.

Get ERP alerts and new tools

Support deadlines, release changes and new free tools for the ERP you run. A couple of emails a month at most.

Free. Unsubscribe with one click from any email.

ArchRay builder
Design the on-prem AI stack: model, GPUs, RAG pipeline, guardrails
See memory, speed and cost as you swap parts, then export the diagram. Free, in your browser.
Open the builder

Keep exploring