Factory Solar and Diesel Hybrid Payback Calculator for Unreliable Grids
Where grid supply is unreliable, a generator is often the real price setter for power. This calculator estimates what adding solar PV to a diesel-backed factory saves, what it costs, and how long it takes to pay back on a simple basis.
Your numbers
Without batteries, solar usually cannot replace more than a fraction of generator output because generators need a minimum load.
Typical large sets run near 0.25 to 0.35 L/kWh depending on load.
Depends on site irradiance, tilt and losses.
Your results
Simple payback ignores financing, degradation, tax allowances and battery costs. Use it for screening, then ask an installer for a full yield study.
Simple payback as diesel price changes
Sweeps Delivered diesel price from 0.6 to 1.8, holding your other inputs fixed.
Energy cost reporting from your ERP
Optional: we show how to combine fuel, meter and production data into one monthly energy cost view.
Optional. The tool and every export work without this. No spam.
How to use it
Enter the energy your generators supply each year, the diesel price you actually pay delivered to site, and the fuel use per kWh. Set the share of that energy you want solar to replace, then enter yield and installed cost per kWp. The tool sizes the array, estimates diesel avoided and net saving after O&M, and returns simple payback in years.
- Use metered generator kWh, not nameplate capacity.
- Use delivered fuel price including transport and losses.
- Keep the solar share realistic for a no-battery design.
The method
Solar energy used equals generator energy times the replaced share. Capacity equals that energy divided by annual yield per kWp. Diesel avoided equals solar kWh times litres per kWh times price. Payback is capital cost divided by net annual saving. It is deliberately simple so a finance team can reproduce it in a spreadsheet and then compare it with an installer proposal.
Reading the result
Short paybacks are typical where diesel is the marginal source, but the result depends heavily on fuel price, which the chart sweeps for you. Check that the array fits roof area and structure, and that your generator controller can run in parallel with PV without reverse power or minimum load trips. If you also buy grid power, the saving per kWh is lower than diesel, so model that mix separately.
- Treat battery storage as a separate costed option.
- Add inverter replacement to long-term cost views.
- Check insurance and landlord consent for roof systems.
Common mistakes
Overestimating the solar share, using the grid tariff instead of diesel cost, ignoring annual degradation, and assuming perfect yield are the usual errors. Another is forgetting that production patterns matter: if most load runs at night, daytime PV saves less. Match the sizing to your actual load profile from a meter log.
Frequently Asked Questions
How much diesel does a generator use per kWh?
Many large diesel sets use roughly 0.25 to 0.35 litres per kWh at reasonable load, and more at light load. Use your own fuel and meter records for the best estimate.
Can solar run a factory without batteries?
Partly. PV can reduce generator fuel during the day, but generators need a minimum load and the system needs controls to avoid reverse power. Full replacement normally needs storage.
What is simple payback?
It is capital cost divided by net annual saving. It ignores financing, tax and degradation, so it is a screening measure rather than a full investment appraisal.
Is this the same as the load shedding generator cost calculator?
No. That tool prices the cost of running generators during outages. This one estimates the benefit of adding solar to offset generator fuel.
If you track generator hours, fuel and downtime in an ERP or spreadsheet, Netray can pull those figures into a monthly energy cost report with the query shown.
Related Tools
Load Shedding Generator Cost Calculator
Work out what running a diesel generator during outages costs per kWh and per year, and the premium over the grid.
Discrete ManufacturingLoad Shedding Cost Calculator for Manufacturers
Put a monthly rand figure on power outages: generator fuel, maintenance, idle labour and the contribution you could not produce.
Country & TaxServer Room UPS Runtime Calculator for ERP Servers
Estimates how long a battery backup can carry your ERP and network load and how much capacity you need for a planned outage.
Discrete ManufacturingLoad Shedding Downtime Loss Log Worksheet
An editable outage log that turns grid downtime and generator hours into lost units, lost contribution and diesel cost per shift.
More Costing & Finance tools
See all- SAP QM Inspection Effort and Cost Calculator
- SAP Standard Cost Estimate BOM Rollup Calculator
- Legacy ERP Retirement Cost and Payback Calculator
- JD Edwards World Month-End Close Procedure Template
- Distributor Customer Credit Application Template
- Distributor Customer Profitability Worksheet
- Distributor GMROI and Inventory Turns Calculator
- Vendor Early Pay Discount Worksheet
- SyteLine Cost Rollup Variance Calculator
Keep exploring
Free tools
- Rooftop Solar Payback Calculator for PlantsSize a rooftop PV array from roof area and compute generation, savings, CO2 avoided and simple payback.
- Nigeria Diesel Generator vs Grid Cost per kWh CalculatorWork out the blended cost of electricity when diesel generators cover the hours the grid does not, and see how diesel price changes it.
- Infor Factory Track AI Assistant Sizing and Value CalculatorSize the GPUs and estimate the monthly value and payback of an on-prem AI assistant for Infor Factory Track users.
ERP fixes and how-tos
- How to add a private AI layer to Infor Factory Track on-premReference architecture to add AI to Infor Factory Track on-prem: read-only data path, retrieval, permissions, local GPUs, write-back control and rollout.
- Infor Factory Track for M3: Shop Floor Data Collection ExplainedWhat Infor Factory Track does for M3 manufacturers: shop floor data collection feeding M3 orders, how the integration is structured and how to plan the setup.
- Infor XA Factory Track: What It Does and How to Plan Shop Floor Data CollectionWhat Factory Track does for Infor XA shop floor data collection, which transactions it captures, how to plan a setup, and alternatives when it is aging.
Runs with your ERP
- Infor Factory Track with Infor LN: barcode inventory, labor and lot or serial traceabilityFactory Track covers barcode inventory, job material, labor and lot or serial traceability for Infor LN and SyteLine. Setup, pitfalls and a private AI layer.
- Infor Factory Track Time Track with SyteLine: attendance and labor captureHow Infor Factory Track Time Track captures clock-ins, breaks, absences and labor for SyteLine, applies attendance rules and prepares payroll data.
- Infor Factory Track Shop Floor with SyteLine: paperless labor, job and WIP reportingHow Factory Track Shop Floor kiosks record labor, job operations and WIP in SyteLine, with setup steps, common pitfalls and where a private AI layer helps.
Guides
- Hybrid AI Architecture Patterns for Manufacturers: On-Prem Where It Matters, Cloud Where It PaysHybrid AI architecture patterns for manufacturers: what runs on-prem vs cloud, data boundaries, latency budgets, and ITAR-safe designs that scale.
- ERP Hybrid Cloud Architecture: Design Patterns and Best PracticesDesign a hybrid cloud architecture for ERP systems balancing on-premise and cloud workloads. Covers Azure Arc, AWS Outposts, connectivity, and data residency patterns.
- Smart Factory ERP Integration for Industry 4.0Connect your smart factory systems to ERP with this Industry 4.0 integration guide covering MES, SCADA, IoT platforms, and real-time production data pipelines.