NPT and BSP Pipe Thread TPI and Outside Diameter Reference
NPT and BSP threads look similar and are routinely confused at the counter. This table lists TPI, pitch and outside diameter side by side, so you can identify a fitting or set up a threading cycle correctly.
| Nominal size | Thread type | Threads per inch | Pitch (mm) | Major OD (in) | Major OD (mm) | Form |
|---|---|---|---|---|---|---|
1/16 | NPT | 27 | 0.941 | 0.3125 | 7.94 | Tapered 1:16, 60 deg |
1/8 | NPT | 27 | 0.941 | 0.405 | 10.29 | Tapered 1:16, 60 deg |
1/4 | NPT | 18 | 1.411 | 0.54 | 13.72 | Tapered 1:16, 60 deg |
3/8 | NPT | 18 | 1.411 | 0.675 | 17.15 | Tapered 1:16, 60 deg |
1/2 | NPT | 14 | 1.814 | 0.84 | 21.34 | Tapered 1:16, 60 deg |
3/4 | NPT | 14 | 1.814 | 1.05 | 26.67 | Tapered 1:16, 60 deg |
1 | NPT | 11.5 | 2.209 | 1.315 | 33.4 | Tapered 1:16, 60 deg |
1-1/4 | NPT | 11.5 | 2.209 | 1.66 | 42.16 | Tapered 1:16, 60 deg |
1-1/2 | NPT | 11.5 | 2.209 | 1.9 | 48.26 | Tapered 1:16, 60 deg |
2 | NPT | 11.5 | 2.209 | 2.375 | 60.33 | Tapered 1:16, 60 deg |
G 1/8 | BSPP (ISO 228) | 28 | 0.907 | 0.383 | 9.728 | Parallel, 55 deg Whitworth |
G 1/4 | BSPP (ISO 228) | 19 | 1.337 | 0.518 | 13.157 | Parallel, 55 deg Whitworth |
G 3/8 | BSPP (ISO 228) | 19 | 1.337 | 0.656 | 16.662 | Parallel, 55 deg Whitworth |
G 1/2 | BSPP (ISO 228) | 14 | 1.814 | 0.825 | 20.955 | Parallel, 55 deg Whitworth |
G 3/4 | BSPP (ISO 228) | 14 | 1.814 | 1.041 | 26.441 | Parallel, 55 deg Whitworth |
G 1 | BSPP (ISO 228) | 11 | 2.309 | 1.309 | 33.249 | Parallel, 55 deg Whitworth |
G 1-1/4 | BSPP (ISO 228) | 11 | 2.309 | 1.65 | 41.91 | Parallel, 55 deg Whitworth |
G 1-1/2 | BSPP (ISO 228) | 11 | 2.309 | 1.882 | 47.803 | Parallel, 55 deg Whitworth |
G 2 | BSPP (ISO 228) | 11 | 2.309 | 2.347 | 59.614 | Parallel, 55 deg Whitworth |
Pipe thread nominal sizes refer to the pipe bore, not the thread diameter, which is why 1/2 NPT has an OD of 0.840 in. NPT outside diameter is the pipe OD; thread major diameter varies along the taper. BSPT (R and Rc) is tapered like NPT but has the 55 degree form and uses the same TPI values as the BSPP rows shown. NPT and BSP do not seal together reliably even when the TPI matches.
Structure fitting attributes in your ERP
Optional: we can show how to model thread standard and size in your item master.
Optional. The tool and every export work without this. No spam.
How to use the table
Search for the nominal size, for example 1/2, and compare the NPT row with the G 1/2 BSPP row. Both use 14 threads per inch, but the NPT form is a 60 degree thread on a 1:16 taper, while BSPP is a 55 degree Whitworth thread that is parallel. The OD columns tell you which one you are holding with a caliper: 0.840 in for 1/2 NPT versus 20.955 mm for G 1/2. Export to Excel to build a fitting identification card for the shop.
- Count threads over one inch with a thread pitch gauge.
- Measure the major OD with calipers on a clean male thread.
- Check whether the thread tapers by feel and by gauge.
The standards behind the numbers
NPT is defined by ASME B1.20.1, with a 1 in 16 taper on diameter, which is 3/4 in per foot, and a thread angle of 60 degrees. BSPP threads are defined by ISO 228-1 and have a parallel form at 55 degrees. BSPT (taper) is defined in ISO 7-1. NPTF dry-seal threads (ASME B1.20.3) have a different crest and root truncation to seal without tape. Always confirm the thread standard on the drawing before choosing the tap or insert.
Programming and cutting notes
For turning, a pipe thread is a normal threading cycle with a taper value, so you need the TPI converted to lead (25.4 divided by TPI). For a 1/2 NPT lead is 1.814 mm, and the taper is 1:16 on diameter, or about 1.79 degrees per side. Tapered holes are normally cut with a pipe tap, and a tap for NPT will not cut a good G thread. Use the correct thread mill or insert profile, 60 degree for NPT and 55 degree for BSP.
Common mistakes
The classic mistake is screwing an NPT male into a BSPP female. At 1/2 in the TPI matches, the thread angles differ by five degrees, and the fitting seems to start but will leak or damage the female thread. Another mistake is quoting a pipe thread by the thread diameter instead of the nominal pipe size. In an ERP item master, always keep the standard (NPT, BSPP, BSPT, NPTF) as a separate attribute from the size.
Frequently Asked Questions
How many threads per inch is 1/2 NPT?
Half inch NPT has 14 threads per inch, a pitch of 1.814 mm. The outside diameter of the pipe it fits is 0.840 inches. 3/4 NPT also uses 14 TPI.
Can I screw NPT into BSP?
Not reliably. Even where TPI matches, such as 1/2 inch at 14 TPI, the thread angle is 60 degrees for NPT and 55 degrees for BSP, and NPT tapers while BSPP does not. It may start and then leak or gall.
What is the taper on NPT?
NPT tapers at 1 in 16 measured on the diameter, which is 3/4 inch per foot. That is about 1.79 degrees per side. The taper is what creates the sealing interference as the threads tighten.
Why is 1/2 NPT not 0.5 inch in diameter?
Nominal pipe size refers to the original inside diameter of standard pipe. The outside diameter of 1/2 inch pipe is 0.840 in, and the thread major diameter is based on that, not on the nominal size.
If fittings and ports are buried in item descriptions in your ERP, Netray can help structure thread type and size attributes so purchasing stops ordering the wrong standard.
Related Tools
Unified and Metric Thread Class and Tolerance Reference
Decode thread class callouts such as 2A/2B, 3A/3B, 6g and 6H, see which have allowance and where each is normally used.
Discrete ManufacturingFanuc G76 Threading Cycle Code Generator
Fill in thread size, pitch, depth and length and get a Fanuc style G76 two-line multi-pass threading block with comments.
Discrete ManufacturingLetter Size Drill Chart A to Z with mm Equivalents
Letter drills A through Z with decimal inch and millimetre diameters, ready to search, print or export.
Discrete ManufacturingLathe Taper Per Foot and Tailstock Offset Calculator
Calculate taper per foot, taper per inch, an approximate half angle and tailstock setover from large and small diameters.
More Discrete Manufacturing tools
See all- Tap Drill Size Chart (UNC, UNF and Metric Coarse/Fine)
- ISO Material Groups for Cutting Tools (P M K N S H) Reference
- Fanuc Macro B System Variables Reference
- Tap Drill Size Chart (Metric, UNC, UNF)
- Thread Pitch Chart (Metric, UNC, UNF)
- Drill Point Length Calculator
- Turning Cutting Time Calculator
- Thread Milling G-Code Generator
- Boring Bar Overhang Ratio Calculator
Keep exploring
Free tools
- Metric Thread Pitch Diameter and Tap Drill CalculatorEnter major diameter and pitch for any ISO metric thread. Get basic pitch diameter, minor diameters, tensile stress area and a tap drill size for your chosen thread engagement.
- Thread Three-Wire Measurement CalculatorCompute best wire size, the reading M over wires for a target pitch diameter, and the pitch diameter implied by your measured reading.
- Thread Pitch Chart (Metric, UNC, UNF)Reference of thread pitch in mm, threads per inch and approximate thread depth for common metric, UNC and UNF sizes.
Guides
- The Digital Thread in Aerospace Manufacturing: How AI Finally Connects ItThe digital thread in aerospace manufacturing: how AI connects CAD, ERP, MES, and quality data into one traceable record from design through sustainment.
- ERP for Fastener Manufacturers: Cold Heading and Thread RollingWhat fastener manufacturers need from ERP: wire rod heat lots, cold heading and thread rolling routings, heat treat and plating, lot genealogy and certs.
- Scheduling Cold Heading, Thread Rolling and Heat Treat in a Fastener PlantHow fastener plants schedule headers, thread rollers, heat treat and plating: bottlenecks, die changeovers, batch loads, outside processing and capacity checks.