Lathe Taper Per Foot and Tailstock Offset Calculator
Taper per foot is the standard way to specify a taper in inch drawings. This calculator turns your diameters and lengths into taper per foot, taper per inch, a compound slide angle and the tailstock setover.
Your numbers
Diameter at the large end of the taper.
Diameter at the small end of the taper.
Axial length from large to small diameter.
Used for tailstock setover only.
Your results
The half angle uses a small angle approximation. For steep tapers use a trigonometric calculation. Tailstock setover also changes the center contact, so use it for light tapers only and confirm with a test cut.
Tailstock setover vs taper length
Sweeps Length of the taper from 1 to 10, holding your other inputs fixed.
Automate manufacturing checks
Optional: we can show how geometry and tolerance checks can be built into quoting and routing in your ERP.
Optional. The tool and every export work without this. No spam.
How to use the calculator
Enter the large and small diameters of the taper, then the length of the tapered section. The tool gives taper per inch, which is the diameter change over one inch of length, and taper per foot, which is that value times twelve. If you turn between centers, also enter the total workpiece length to get the tailstock setover. For CNC work you can use the radial change directly in your program, but this is still handy for checking drawings and manual lathes.
- Taper per foot = (D - d) / L x 12.
- Half angle is the compound slide setting for a manual lathe.
- Tailstock setover works only for external tapers between centers.
The formulas
Taper per inch is the large diameter minus the small diameter, divided by the taper length. Multiply by twelve for taper per foot. The half angle in degrees is the arctangent of half the taper per inch, which for small tapers is close to taper per inch times 28.648. Tailstock setover is half the diameter change times the ratio of the total length to the taper length. When the taper runs the full length of the part, the setover is simply half the diameter change.
Worked example
A shaft is 1.000 in at the large end and 0.800 in at the small end over 4 in of taper. Taper per inch is 0.05 and taper per foot is 0.6. The half angle is about 1.43 degrees. If the workpiece is 10 in long between centers, the tailstock setover is 0.100 times 10 divided by 4, which is 0.250 in. Compare this with common standard tapers: the Morse tapers run roughly 0.6 inches per foot, and Jacobs and Brown and Sharpe tapers have their own values.
Common mistakes
Using the total length instead of the taper length for the taper per inch, forgetting that setover is a radial value (half the diameter change), and mixing up included angle with half angle on the compound slide. Another mistake is cutting a steep taper by tailstock setover, which distorts the center holes and wears them unevenly. For a CNC lathe, use a G01 move or a taper cycle with the radial change per unit length.
Frequently Asked Questions
How do you calculate taper per foot?
Subtract the small diameter from the large diameter, divide by the length of the taper in inches, and multiply by 12. For example, 1.000 and 0.800 over 4 inches gives 0.05 per inch, or 0.6 per foot.
How do you calculate tailstock offset?
Take half the difference between the large and small diameters, divide by the taper length, and multiply by the total length between centers. When the taper covers the full length, the offset is half the diameter change.
What angle do I set the compound slide to?
Set it to the half angle of the taper, measured from the lathe axis. For small tapers the half angle in degrees is about 28.65 times the taper per inch. Always verify with a test cut and a taper gauge.
Is tailstock offset accurate for steep tapers?
No. Offsetting the tailstock tilts the workpiece on its centers, which distorts the center hole and gives a slight error. It is best for light tapers. For steep tapers use the compound slide or a CNC taper move.
If you want taper and geometry checks built into your quote or routing step, Netray can help automate checks of this kind inside your ERP.
Related Tools
Fanuc G76 Threading Cycle Code Generator
Fill in thread size, pitch, depth and length and get a Fanuc style G76 two-line multi-pass threading block with comments.
Discrete ManufacturingNPT and BSP Pipe Thread TPI and Diameter Reference
Pipe thread sizes with TPI, pitch in mm and outside diameter for NPT and BSP (G) threads, so you stop mixing them up.
Discrete ManufacturingInternal Turning and Boring Bar Setup Checklist
A practical checklist for setting up boring bars on CNC lathes, to cut chatter, scrap and crashed tools.
Costing & FinanceTurning Cost Per Part Calculator
Add machine time, tool change time, insert cost and setup per part to see what turning actually costs, and how tool life moves it.
More Discrete Manufacturing tools
See all- Tap Drill Size Chart (UNC, UNF and Metric Coarse/Fine)
- ISO Material Groups for Cutting Tools (P M K N S H) Reference
- Fanuc Macro B System Variables Reference
- Tap Drill Size Chart (Metric, UNC, UNF)
- Thread Pitch Chart (Metric, UNC, UNF)
- Drill Point Length Calculator
- Turning Cutting Time Calculator
- Thread Milling G-Code Generator
- Boring Bar Overhang Ratio Calculator
Keep exploring
Free tools
- Lathe Tool Offset Record WorksheetKeep a written record of geometry and wear offsets per turret station so you can rebuild a setup or spot tools that drift.
- CNC Lathe Setup Sheet TemplateA printable lathe setup sheet covering workholding, stickout, tool stations, offsets and first-piece checks, so the next operator can repeat the job.
- Planned Order Offset and Start Date CalculatorAdd setup, run, queue, move and safety time to get the lead time offset MRP should use to back schedule a made-in-house order.
Guides
- Rubber Extrusion Quoting and Scrap CostingQuote rubber extrusions per foot: compound weight per foot, line speed, start-up scrap, die cost, cure method, cutting and splicing, with scrap costed correctly.
- How to Estimate Welding Cost for a Fabrication QuoteHow fabricators estimate welding cost: weld volume, deposition rate, arc-on time, filler efficiency, and where AI helps pull actual hours from past jobs.
- AI for Scrap and Tool Life Analysis in Swiss and Screw Machine ShopsUse AI on ERP, inspection and machine data to find scrap causes and tool life patterns in Swiss and screw machine shops, with practical data steps and limits.