OEM Aftermarket and Service Readiness Assessment
Equipment builders often earn higher margins on parts and service than on new machines, but only if they know what they have delivered. This ten question assessment shows where your aftermarket business is strong and where the data and process gaps are.
1. How well do you know which machines you have delivered and where they are now?
2. Do you hold an as-built bill of materials for each delivered machine?
3. How are spare parts quotes produced?
4. Do you track warranty start and end dates per machine?
5. What share of machines are covered by a paid service contract?
6. How are service calls and field visits recorded?
7. Do you analyse failure patterns across the fleet?
8. Can your service team see remote machine data or alarms?
9. Is service margin reported separately from machine sales?
10. How quickly can you answer a customer who asks what is in their machine and what it needs?
How to use the assessment
Answer based on what is true today and evidenced in your systems, not on plans. Have the service lead and the finance lead answer separately, then compare. Large differences usually point to unreported work or unclear definitions. Retake it after six months to track change.
- Answer from evidence
- Compare service and finance views
- Pick two actions, not ten
- Retake every six months
What the score reflects
The questions run along the aftermarket chain: knowing the installed base, holding as-built configurations, quoting parts, tracking warranty, selling contracts, recording field work, learning from failures, monitoring remotely and measuring margin. A weak early link, such as the installed base, limits everything after it.
Reading your band
Foundation and reactive bands usually share one gap: serial level data. Fixing it unlocks warranty tracking, spares quoting and contract sales. In higher bands the work shifts to analytics and remote data. Be cautious about tooling before the data exists; a dashboard on bad records only displays the problem faster.
Common mistakes
Treating aftermarket as an add-on handled by a parts counter, so nobody owns the installed base. Others quote contract prices without costing field travel and spares. A third trap is separate spreadsheets in sales, service and finance that never agree on how many machines are in the field.
Frequently Asked Questions
Is this assessment scientifically validated?
No. It is a practical self assessment built from common aftermarket practices. Use it to start a conversation and prioritise work, not as a benchmark against other companies.
What is an as-built BOM?
The record of what was actually installed in a specific machine, including substitutions and revisions, as opposed to the engineering BOM of the model. Service needs it to order the right part.
Do small OEMs need all of this?
Not necessarily. A small builder may do well with a serial-level spreadsheet, warranty dates and a simple parts list. Add systems only when the manual approach becomes the limit.
Where should we start?
Almost always with the installed base: serial number, customer, location, ship and commissioning dates. Everything else in the aftermarket chain depends on it.
If your score points to installed base and as-built data gaps, we can discuss how to link ERP, service and engineering records for read-only questions and reporting.
Related Tools
Installed Base Warranty Expiry SQL Query Generator
Build a T-SQL query that finds machines whose warranty ends within a chosen window, ready for service contract outreach.
SAPSAP Installed Base Equipment ABAP SELECT Generator
Fill in manufacturer, model and build year to produce an ABAP report listing equipment records from the EQUI table.
Compliance & ContractsMachine Risk Assessment Checklist (ISO 12100)
A structured checklist for the ISO 12100 risk assessment process on a new or modified machine, with critical items flagged.
More Industry Templates tools
See all- Engineer to Order Machine Quote Worksheet
- Equipment Factory Acceptance Test (FAT) Checklist
- Site Acceptance Test (SAT) Report Template
- Machine Installation and Commissioning Checklist
- Machine Punch List Tracker Worksheet
- Gear RFQ and Manufacturing Inquiry Template
- Distributor Free Freight Policy Template
- Job Shop Quote Cover Letter Template
- Monthly Operations Review Meeting Pack Template
Keep exploring
Free tools
- Spare Parts Attach Rate Aftermarket Revenue CalculatorProject aftermarket parts revenue and gross profit from your installed base, new shipments, retirements and how many customers buy from you.
- ERP Agent API Integration Readiness AssessmentAnswer ten questions about APIs, roles, limits and logging to see whether your ERP is ready for an AI agent or MCP integration.
- RAG Readiness Assessment for ERP DocumentsTen questions that show whether your documents and ERP attachments are ready to feed a retrieval-based AI assistant.
ERP fixes and how-tos
- Is Your ERP Data Ready for AI? A Readiness ChecklistMost ERP data is ready enough to pilot AI today. A practical checklist of the master-data and access-control issues that actually break AI answers.
- SyteLine Service Mobile App: Options for Field Service and Warehouse StaffWhat mobile options exist for SyteLine / CSI field service and warehouse work: browser access, Infor mobile apps, scanner front ends and custom apps, and how to choose.
Runs with your ERP
- Infor Service Mobile with Infor SyteLine Field ServiceInfor Service Mobile is a field technician app listed as a CloudSuite Industrial add-on. What it connects to in SyteLine service, setup steps, pitfalls, FAQ.
- NetSuite Field Service Management (formerly NextService) for equipment manufacturersWhat NetSuite Field Service Management, formerly NextService, offers equipment makers: scheduling, dispatch, mobile app, asset history and work orders, plus setup tips.
Guides
- Improve Service Parts Capture Rate: Aftermarket Parts Revenue OptimizationImprove service parts capture rate: size spend from service BOMs, find the leaks, price by criticality, stock for uptime and target the installed base.
- ERP for Industrial Machinery Manufacturers: ETO, Configuration, and AftermarketERP for industrial machinery manufacturers: engineer-to-order quoting, configurators, project accounting, aftermarket service parts and field service needs.
- Installed Base Management: Building the Asset Register That Drives Service RevenueInstalled base management for manufacturers: building a serialized asset register, hierarchy tracking, data reconstruction, and aftermarket impact.
AI on your ERP
- AI for SyteLine Service Management and Field Service Without Replacing Your Service ModuleAI for SyteLine service management: triage requests, check warranty and parts, and brief technicians, with human approval and private deployment.
- AI for Spare Parts and Aftermarket Operations: Stock the Right Parts, Identify Them Fast and Quote ConsistentlyAI on ERP data for spare parts: stocking by installed base, parts identification, supersession, aftermarket pricing and quote drafting. Private and on-prem.
Software
- ServiceMaxServiceMax is PTC's field service management software for equipment makers and asset-heavy service teams. Modules, integrations, AI uses and alternatives.
- Dynamics 365 Field ServiceDynamics 365 Field Service handles work orders, resource scheduling and mobile technicians on Microsoft Dataverse. Modules, integrations and alternatives.