On-Prem AIFree calculatorPDF, Excel, Word export

OpenAI API Pricing Calculator: Cost of ChatGPT API for ERP Workloads

This OpenAI API pricing calculator turns requests per day and token counts into a monthly bill, using ERP workload presets for quotes, order summaries and BOM questions. It also compares small, standard and frontier price tiers and shows cost per machine.

Your numbers

Presets use typical prompt plus retrieved-data sizes. Choose Custom to use your own.

requests
days
tokens

Used only when the preset is Custom.

tokens

Used only when the preset is Custom.

$ per 1M tokens

Copy the current price from the provider price page. The default is illustrative.

$ per 1M tokens
20 %

Repeated prefix such as system prompt. Assumes cached tokens bill at half price; check your provider.

machines

Your results

Monthly API cost at your prices
$125
Monthly cost per machine or user
$3
Input tokens per request
3,200
Output tokens per request
700
Requests per month
8,800
Effective input price per 1M after caching
2.25
Annual API cost
$1,500
Monthly cost, small tier (0.15 / 0.60 per 1M)
$8
Illustrative small-model rates, no caching.
Monthly cost, standard tier (2.50 / 10 per 1M)
$132
Illustrative mid-tier rates, no caching.
Monthly cost, frontier tier (10 / 40 per 1M)
$528
Illustrative top-tier rates, no caching.

Tier rates and presets are illustrative planning numbers, not a quote. API prices change often. Replace them with the current published prices for the exact models you plan to use, and measure real token counts from a pilot.

Free, optional. Reopen it on any device.
Save results:

Monthly cost vs requests per day (small, standard and frontier tier)

Sweeps Requests per working day from 50 to 3000, holding your other inputs fixed.

Cloud API or on-prem model: get a sized comparison

Optional: send us your volumes and we will compare API cost with a private on-prem deployment for your ERP data.

Optional. The tool and every export work without this. No spam.

Was this tool useful?

How the API cost is calculated

API pricing is per million tokens, billed separately for input and output. Monthly cost equals requests per month times (input tokens times input price plus output tokens times output price) divided by one million. Output tokens usually cost three to five times more than input tokens, so a short answer to a long prompt is cheaper than the reverse. The cached share setting models prompt caching, where a repeated prefix such as your system prompt and tool definitions is billed at a discount. Set it to zero if you are unsure.

  • Tokens are roughly four characters or three quarters of a word in English
  • ERP data pasted into the prompt is the biggest input driver
  • Reasoning models can bill hidden thinking tokens as output
  • Check batch and cached-input discounts on the price page

ERP workload presets and what they assume

The quote draft preset assumes an RFQ email, a few similar past quotes and pricing rules, about 3,200 input tokens, with a 700 token reply. The order summary preset assumes one sales order with lines and status history, about 1,800 tokens in and 300 out. The BOM question preset assumes a multi-level BOM extract plus a question, about 6,500 tokens in and 400 out. These are planning figures; your real numbers depend on how much ERP data you retrieve. Pick Custom and enter measured counts once you have a pilot.

Reading the model tier comparison

The three tier rows apply the same workload to a small, a standard and a frontier price level, so you can see how much model choice matters compared with volume. Often a small model handles summaries and extraction, while a larger one is reserved for hard reasoning, which is why routing cheap tasks to cheaper models saves most of the bill. The chart sweeps requests per day so you can see where each tier crosses a budget line. The cost per machine figure divides the bill by the machines or users you serve, which is the number finance usually asks for.

When API cost is not the real question

At low volume, API pricing is almost always cheap relative to the project. The questions that decide the architecture are data residency, confidentiality of drawings and pricing, and whether ERP data may leave your network. If those rule out a public API, an open-weight model on your own GPUs is the alternative, and the comparison then becomes hardware and operations cost rather than tokens. Use this calculator to size the cloud option honestly, then compare it with an on-prem estimate before deciding.

Frequently Asked Questions

How much does the OpenAI API cost per month?

It depends on model, tokens per request and volume. A few hundred ERP requests a day on a small or mid tier model is usually tens to a few hundred dollars per month. Enter your own counts and current prices above for a real estimate.

Is the ChatGPT API cost the same as a ChatGPT subscription?

No. ChatGPT subscriptions are per user per month, while the API bills per token used. For an ERP integration the API is the relevant model, because software sends requests on behalf of many users.

What does ChatGPT cost per machine?

Divide the monthly API bill by the number of machines or users it serves. The calculator shows this figure. It is useful for chargeback, but token cost per request is the more stable unit.

How do I reduce OpenAI API cost?

Send less ERP data per request, cache the repeated prompt prefix, cap output length, and route simple tasks to a smaller model. Measuring real token usage in a pilot usually reveals the largest savings.

Netray designs ERP AI for private and on-prem deployment as well as cloud APIs, so you can compare both honestly. We can size your workloads from real ERP data.

Get ERP alerts and new tools

Support deadlines, release changes and new free tools for the ERP you run. A couple of emails a month at most.

Free. Unsubscribe with one click from any email.

ArchRay builder
Design the on-prem AI stack: model, GPUs, RAG pipeline, guardrails
See memory, speed and cost as you swap parts, then export the diagram. Free, in your browser.
Open the builder

Keep exploring

Free tools

ERP fixes and how-tos

Guides

Comparisons