Industry TemplatesFree templatePDF, Excel, Word exportDiscrete Manufacturing

OT Network Change Request Form Template

Most plant network outages and many security gaps start as an unreviewed change: a quick firewall rule, a temporary switch, an integrator's laptop. This form forces scope, risk, rollback and production sign-off onto one page before anyone touches the network.

Fill in

Live preview
Free, optional. Reopen it on any device.
Download:

OT Network Change Request Form Template

Change request OTCR-2026-041

Requester: J. Alvarez, Controls Engineer Date: 2026-10-21 Change type: Firewall rule Zone: Level 2 area control Planned window: Sat 2026-10-31, 06:00 to 08:00, line idle

Description and business reason

Allow the new vision inspection station (10.20.4.31) to reach the MES server (10.20.1.10) on TCP 8443 only.

Risk and safety screening

QuestionAnswer (Yes / No / NA)Note
Can this change stop or slow a running line?
Does it affect a safety-rated network or safety PLC?
Does it open a path between IT and OT?
Is the vendor or integrator connecting remotely?
Is a current configuration backup saved?
Was the change tested in a lab or on a spare unit?

Rollback plan

Remove the rule and restore the saved firewall configuration backup taken before the change. Rollback takes under 10 minutes.

Post-change verification

CheckResultVerified by
Device or service reachable as intended
No unintended traffic allowed
Production data flowing
Documentation and asset inventory updated

Approvals

Requester / Date
OT / controls lead / Date
IT security / Date
Production supervisor / Date
Change board chair / Date

A starting point for your own change control procedure, not a substitute for it. Changes touching safety systems need review by the responsible safety engineer.

Review your OT change process

Optional short review of how network changes are approved and recorded across IT and OT.

Optional. The tool and every export work without this. No spam.

Was this tool useful?

How to use the form

Fill the fields, export to PDF or Word, and route it to the approvers listed. Every request gets a number so it can be matched to the firewall log and the asset inventory later. Emergency changes can use the same form completed after the fact within one business day.

  • One change per form
  • Name exact IPs and ports, not 'any'
  • State the production window
  • Attach the config backup reference

Why OT change control differs from IT

In OT a mistaken change can stop a line or affect equipment safety. Windows are tied to production schedules, vendors often need remote sessions, and many devices cannot be patched or rebooted freely. Standards such as IEC 62443 and NIST SP 800-82 expect documented change management and zone separation, which this form supports.

Reviewing a request

Reject requests with vague scope, permanent rules justified as temporary, or no rollback. Check that the rule is the narrowest that works, that an expiry date exists for vendor access, and that the asset inventory and network diagram are updated after the change.

Common mistakes

Approving after the work is done, skipping the post-change check, leaving temporary rules in place for years, and not updating the diagram. Review open exceptions quarterly.

Frequently Asked Questions

Who should approve an OT network change?

At minimum the OT or controls owner, IT security, and the production supervisor for the affected area. Changes touching safety systems also need the safety engineer. The chair of your change board gives final approval.

Do emergency changes need the form?

Yes, completed afterward. Record who authorized it verbally, what was changed and why, then review it within one business day. Repeated emergency changes show a process gap worth fixing.

What is a good change window?

A planned stop such as a weekend shift, changeover or maintenance day, agreed with production. Avoid changes during run time on cells that cannot tolerate a network blip.

Should this link to the asset inventory?

Yes. Every new, moved or retired device should update the inventory and network diagram. Put that check on the post-change verification table so it is not forgotten.

If you want firewall rule requests tied to ERP or MES asset records, we can discuss it. The form is free to use as is.