Packaging Supplier Scorecard Worksheet
Packaging suppliers fail in different ways, such as late deliveries, colour drift or damaged pallets, and a plain average hides which one hurts you. This scorecard weights the factors you care about and gives one comparable number per supplier.
| Supplier | Material | Rejected lots % | On-time delivery % | Quality score (0-100) | Delivery score (0-100) | Price score (0-100) | Responsiveness (0-100) | Compliance and certs (0-100) | Weighted score | |
|---|---|---|---|---|---|---|---|---|---|---|
88 | ||||||||||
89.75 | ||||||||||
77.7 | ||||||||||
82.3 | ||||||||||
85.7 |
Weights used: quality 35 percent, delivery 25, price 20, responsiveness 10, compliance 10. These are an example. Download to Excel to change the weights to match your supplier policy. Convert rejected lots and on-time percent into the 0-100 scores using your own scoring bands.
Generate supplier scores from ERP receipts
Optional: a short review of how to compute delivery and rejection data from your ERP.
Optional. The tool and every export work without this. No spam.
How to use the scorecard
List each supplier and material. Record rejected lot percent and on-time delivery percent for reference, then enter a 0 to 100 score for each factor based on your scoring bands. The weighted score is computed for every row. Review the lowest scores quarterly with the supplier and agree an action plan.
Choosing weights and bands
Weights should reflect risk. For printed packaging, quality and delivery usually dominate because a rejected lot stops a packing line. Price matters, but a cheap supplier with late deliveries can cost more in line stoppages. Define scoring bands in advance, for example 100 points at 99 percent on-time and fewer points per percentage lost.
- Use the same bands for every supplier in a material category
- Take data from receiving inspection and ERP receipts, not memory
- Share the scorecard with the supplier
Common mistakes
Scorecards fail when scores are subjective, when only price is measured, or when nobody acts on a low score. Another mistake is comparing suppliers of unrelated materials on one list. Keep each category separate and trend the score over time instead of reading a single quarter.
Frequently Asked Questions
What weights should a supplier scorecard use?
There is no standard. A common starting point puts quality and delivery at roughly half to two thirds of the total, with price, service and compliance sharing the rest. Adjust to your risk and review it when strategy changes.
How often should suppliers be scored?
Quarterly is typical for active suppliers, with monthly tracking of raw delivery and rejection data. Critical suppliers may be reviewed more often, especially after a quality incident.
What score should trigger action?
Decide thresholds in advance, for example below 70 triggers a corrective action request and below 60 triggers sourcing review. The exact numbers are a policy choice, but they should be written down.
Can this support ISO 9001 supplier evaluation?
It can serve as documented evidence of ongoing supplier evaluation, which ISO 9001 expects for externally provided products and services. Your quality system still defines criteria, frequency and records.
If supplier delivery and receiving data already exist in your ERP, we can help generate this scorecard from it automatically instead of keying scores.
Related Tools
Packaging Nonconformance Report Template
An NCR form for printed and converted packaging with defect classification, containment, disposition and approval lines.
Supply Chain & InventoryCorrugated Board Sheet Usage and Trim Waste Worksheet
An editable order list that computes how many blanks fit on each board sheet, trim waste percent and board cost per box.
Industry TemplatesPackaging Artwork Proof Approval Form Template
A fill-in artwork approval form that captures version, colour, barcode and legal copy checks plus sign-offs before plates or cylinders are made.
MES & Shop FloorPackaging Line Downtime and OEE Log Worksheet
A shift-by-shift log that computes availability, performance, quality and OEE for each packaging line.
More Supply Chain & Inventory tools
See all- Pallet Pattern Cases per Layer and Pallet Calculator
- Stretch Wrap Film Usage and Cost per Pallet Calculator
- Carton Stacking Load and Required BCT Safety Factor Calculator
- Carton Cube Utilization, Void Fill and Dim Weight Calculator
- Palletized Unit Load Shipping Readiness Checklist
- Oracle Fusion Inventory Turns and Carrying Cost Calculator
- Distribution ERP Fill Rate Calculator
- Distributor Rebate Tracking Worksheet
- Branch Transfer Planning Worksheet
Keep exploring
Free tools
- Packaging Cost Per Unit WorksheetBuild up the full packaging cost for one sellable unit from bottle to pallet, with scrap allowance per line, and export it to Excel.
- Packaging Nonconformance Report TemplateAn NCR form for printed and converted packaging with defect classification, containment, disposition and approval lines.
- Aerospace Supplier ScorecardRate a supplier across 10 criteria - OTD, quality escapes, AS9100 status, FAI performance, CAPA responsiveness, compliance flowdown, and financial health - for an instant risk rating.
Guides
- AI for Estimating Label and Packaging Converting JobsHow AI can read customer inquiries and artwork specs, find similar past label and carton jobs, and draft an estimate for review, plus its limits.
- AI Order Entry for Label and Packaging ConvertersAutomating customer PO and spec intake for label and packaging converters: matching items and artwork, catching mismatches, and keeping a human in the loop.
- AI for Packaging Plant Reporting: Asking Your MIS or ERP Plain QuestionsHow plant managers at label and packaging converters can get answers on late jobs, waste, margin and material from their MIS or ERP without waiting for reports.
AI on your ERP
- AI for ERP in Packaging and Printing: Estimating, Waste and Job TicketsPrivate AI on your ERP for converters and printers: job estimating, substrate and ink usage, make-ready waste, die tooling, proofs and food-contact records.
- AI on Infor SyteLine for Packaging ManufacturersAI on Infor SyteLine for packaging makers: substrate and ink costing, job repeats, die and plate tracking, food-contact records, and short-run scheduling.