PCBA Quantity Price Break Worksheet
Customers ask for a quote at 10, 100 and 1,000 boards and expect prices to fall in a sensible curve. This worksheet builds each tier from material, scrap, assembly and one-time costs so the curve is defendable.
| Tier quantity (boards) | Material per board | Attrition and scrap (%) | Assembly cost per board | One-time cost in this tier | Target margin (%) | Cost per board | Unit price | Order value | Gross profit | |
|---|---|---|---|---|---|---|---|---|---|---|
$1,123 | $1,728 | $1,728 | $605 | |||||||
$157 | $231 | $2,311 | $739 | |||||||
$65 | $93 | $4,628 | $1,388 | |||||||
$50 | $69 | $6,893 | $1,930 | |||||||
$37 | $49 | $24,597 | $6,149 | |||||||
$34 | $43 | $43,016 | $9,463 | |||||||
$30 | $37 | $183,439 | $33,019 |
The profit total is a sum across alternative tiers, shown for comparison only: a customer buys one tier. Material per board should come from your costed BOM at the buy quantity of each tier. Margin typically tapers with quantity as competition and negotiating leverage rise; set your own floor, and compare tier prices to the minimum contribution margin your shop requires to cover idle capacity.
Generate tiered quotes from ERP data
An optional discussion of building tier pricing directly from your costed BOMs and routings.
Optional. The tool and every export work without this. No spam.
How to use the worksheet
Keep one row per quoted tier. Enter material per board at that tier's buy quantity, because distributor price breaks and MOQ effects change the cost. Add scrap or attrition, assembly cost per board excluding setup, and a one-time cost that bundles NRE share, setup and first article. Pick a target margin per tier. The computed columns give cost per board, unit price, order value and gross profit. Edit rows, add tiers, and export to Excel to send to a colleague or attach to your quote.
The math behind each tier
Cost per board is material times (1 plus scrap), plus assembly cost, plus one-time cost divided by the tier quantity. Unit price is cost divided by (1 minus margin). Order value is unit price times quantity and gross profit is the difference between price and cost times quantity. The one-time term is why small quantities are so costly: fixed cost is divided across few boards, and a single unit might carry hundreds of dollars of setup.
- Cost = mat x (1 + scrap) + assembly + fixed/qty
- Price = cost / (1 - margin)
- Profit = (price - cost) x qty
Reading the curve
A healthy curve falls steeply at first, because fixed cost dilutes, then flattens as material dominates. If your unit price barely moves between 500 and 1,000, your margin or material break assumptions may be off. Check that the largest tier still clears your minimum contribution and that no tier is priced below the next lower tier. If a customer buys 500 but asks for a 1,000 price, the sheet shows the profit you give up, which helps decide whether to counter with a blanket order or a longer lead time.
Common mistakes
Quoting each tier from the same material price hides the benefit of price breaks and loses deals at volume. Ignoring the cost of carrying excess components when you buy full reels at a high tier is another. Do not forget that large tiers may need several setups, so one-time cost can rise with quantity, as in the 5,000 row. Finally, publish validity dates: component prices and lead times shift, so tier prices should expire.
- Use tier-specific material costs
- Add setups for multi-release runs
- State quote validity and price assumptions
- Check for price inversions between tiers
Frequently Asked Questions
How many tiers should a PCBA quote have?
Three to five is common: a prototype quantity, a pilot lot, and one or two production tiers. Match the tiers to the quantities the customer asks for, and offer a higher tier only if it changes your cost.
Why does the 1-piece price look so high?
Because fixed costs like stencil, programming, setup and first article are spread over a single board. Many shops therefore bill NRE separately and set a minimum order charge, so single unit pricing is not distorted.
Should margin fall with quantity?
It often does in dollars per board and sometimes in percent, because larger orders carry less risk per unit and face more competition. Set a floor based on your contribution margin so large orders remain worth running.
Can I import costs from my BOM costing?
You can paste values in the editable table, or export, edit in Excel and re-import into your own pricing process. For live connections, an ERP integration can feed material cost per tier automatically.
If you want tiered quotes generated from live BOM cost and routing data in your ERP, we can build that workflow with approvals, on your infrastructure if required.
Related Tools
PCBA Turnkey Quote Worksheet with BOM Rollup and Attrition
Enter BOM lines with quantity per board, unit price, attrition and placement counts, then roll up material, placement and through-hole cost into a per-board cost and quote price.
Costing & FinancePCBA NRE and Stencil Amortization Per Unit Calculator
Amortize stencil, programming, fixture and DFM NRE plus line setup and first article time over your order size, then see loaded cost, quoted unit price and how much of the price is one-time cost.
Industry TemplatesPCBA Turnkey Quote Letter Template
Fill in your company, customer, assembly, price tiers, NRE, lead time and terms to produce a quote document with explicit assumptions and exclusions.
Quality & InspectionPCBA Test Strategy Cost Per Board Calculator (ICT vs Flying Probe vs Functional)
Compare ICT, flying probe and functional test on fixture amortization, test seconds and escaped defect cost, and find the volume where one overtakes the other.
More Costing & Finance tools
See all- PCBA BOM Cost Rollup Worksheet
- Electronics Excess and Obsolete Inventory Worksheet
- Component Price Escalation BOM Impact Calculator
- SAP QM Inspection Effort and Cost Calculator
- SAP Standard Cost Estimate BOM Rollup Calculator
- Legacy ERP Retirement Cost and Payback Calculator
- JD Edwards World Month-End Close Procedure Template
- Distributor Customer Credit Application Template
- Distributor Customer Profitability Worksheet
Keep exploring
Free tools
- Lot Size Price Break Table GeneratorEnter setup, material, run cost, scrap and target margin for each quantity and get the cost-based unit price and lot price for a quote.
- Epicor Quote Price and Quantity Break CalculatorBuild a unit price from material, labor, setup and subcontract cost, hit a target margin, and see how the price falls with quantity.
- Order Quantity Price Break Total Cost CalculatorDecide whether to buy more to reach a supplier price break by comparing total annual purchase, ordering and carrying cost.
ERP fixes and how-tos
- Price Book Session in Infor LN: Setup and Order PricingHow price books work in Infor LN sales pricing: where they are maintained, how they link to price lists and order lines, and how to troubleshoot a price not found.
- Infor VISUAL Price Book: How Customer Pricing and Price Breaks Are Set UpHow selling prices, quantity breaks and customer pricing are organized in Infor VISUAL, how to maintain them, and how to find why an order picked a price.
- Odoo Multiple Prices per Product: How to Use PricelistsSet multiple prices per product in Odoo with pricelists: by customer, quantity and currency, with rule types, priority and how to assign them.
Guides
- SyteLine Vendor Price Matrix Setup and ConfigurationConfigure SyteLine vendor price matrix for accurate procurement costing. Set up quantity breaks, effective dates, and currency pricing in CloudSuite Industrial.
- How to Quote PCB Assembly From a Customer BOMStep by step PCB assembly quoting from a customer BOM: part matching, price breaks, lead time risk, overage and attrition, and quote validity for EMS shops.
- PCBA Quoting Software for EMS CompaniesHow EMS and PCBA shops evaluate quoting software: BOM import, live distributor pricing, assembly labor models, NRE, and how quotes tie back to the ERP.