Engineering & PLMFree referencePDF, Excel, Word exportFluid Power and Sealing

PTFE Seal Material Selection Reference

PTFE is the default answer when elastomers cannot handle temperature, chemicals or dry running, but the filler decides how the seal wears, how the shaft survives and whether the compound meets food or pharma rules. This reference compares the common grades side by side.

Download:
PTFE gradeTypical fillerWear and loadFrictionChemical resistanceMating surface notesTypical useWatch out for
Virgin PTFE
None
Soft, creeps under load, lowest wear resistance
Lowest
Excellent with nearly all fluids
Gentle on soft shafts and aluminum
Food, pharma, chemical, static and low-load seals
Cold flow under load; poor in high-pressure dynamic use
Glass filled PTFE (15 to 25 percent)
Glass fiber
Good wear resistance, reduced creep
Low to moderate
Very good; attacked by strong alkalis and hydrofluoric acid
Can abrade soft shafts, needs hard and smooth surface
General hydraulic and pneumatic seals, backup rings
Soft mating metal; HF and caustic service
Glass and MoS2 filled PTFE
Glass fiber plus molybdenum disulphide
Good wear, improved running-in
Lower than glass alone
Very good; limited with strong alkalis
Hard shaft preferred
Rod and piston seals in hydraulic cylinders
Aggressive alkaline media
Carbon filled PTFE (about 25 percent)
Amorphous carbon
Good wear and compressive strength
Low
Excellent, including many acids and alkalis
Gentler on shafts than glass
Steam, hot water, chemical process seals
Not usually food grade; check conductivity needs
Carbon and graphite filled PTFE
Carbon plus graphite
Good wear, self-lubricating
Very low
Excellent
Handles minor dry running and softer shafts
Rotary seals, compressors, dry running
Colour and shedding may not suit clean applications
Bronze filled PTFE (40 to 60 percent)
Bronze powder
High load and wear capability, high thermal conductivity
Moderate
Limited in acids and oxidising media
Needs hard, smooth shaft
High-load hydraulic bearings and wear rings
Corrosive fluids; food and pharma use
Polyimide filled PTFE (about 15 percent)
Polyimide
Excellent wear, low abrasion of mating part
Low
Very good
Suited to softer shafts, stainless and aluminum
Dry running, cryogenic and aerospace seals
Higher cost; check steam compatibility
PEEK filled PTFE
PEEK powder
High strength and wear resistance
Low
Very good
Moderate hardness on mating part
High pressure, aggressive media, rotary
Cost; verify with supplier for temperature extremes
Stainless steel filled PTFE
Stainless steel powder
Good compressive strength, low creep
Moderate
Good; depends on steel grade
Hard shaft required
High temperature steam, chemical process
Abrasion of soft shafts
FDA-compliant virgin PTFE
None
Soft, similar to virgin
Lowest
Excellent
Soft or polished surfaces
Food, beverage and pharmaceutical contact seals
Use only grades certified for the regulation you must meet

General trade information, not a substitute for supplier data. Property levels depend on filler percentage, resin and processing. Typical PTFE service range is about -200 to +260 deg C; verify limits for the filler and seal design. Always confirm FDA, USP or other regulatory status on the specific compound and lot certificate.

Carry material grade through your ERP

An optional discussion on keeping filler grade and certification attached to seal items and purchase orders.

Optional. The tool and every export work without this. No spam.

Was this tool useful?

How to use it

Search by filler, fluid, or application word such as hydraulic, steam, dry running or food. Each row summarises wear, friction, chemical resistance, mating surface notes and common applications. Use it to shortlist two or three grades, then confirm the choice with the seal manufacturer for your pressure, speed, temperature and surface finish. Export the table to Excel to attach to a quote or a material approval request.

  • Start with the media and mating surface; those eliminate most grades.
  • For food and pharma, use only certified virgin or approved grades.
  • Treat the table as a shortlist tool, not as a design approval.

Why fillers matter

Virgin PTFE has the best chemical resistance and the lowest friction but creeps and wears under load. Fillers raise compressive strength and wear life, and each has a trade-off. Glass improves wear but can abrade a soft shaft. Carbon is gentler on shafts and thermally conductive. Bronze carries high load but corrodes in acids. Polyimide wears gently on soft mating surfaces and suits dry running. The right grade balances wear life against shaft damage and chemical compatibility.

Selecting for the application

Pressure and speed set the load on the seal and therefore the filler need. Fluid sets the chemical limit, since glass and bronze give up some resistance. Shaft hardness and finish decide whether glass is safe. Operating temperature rarely limits PTFE itself, but the energising spring or backup ring may. In spring-energised designs the jacket material is chosen from this table while the spring is chosen separately for corrosion resistance.

Common mistakes

The usual errors are using glass-filled PTFE on a soft aluminum or stainless shaft, selecting bronze for a wet corrosive service, and assuming every white PTFE seal is food grade. Another is ignoring creep: PTFE does not recover like rubber, so a dimension that loses preload after the first thermal cycle needs a spring or elastomer energiser. Document the grade on the drawing and in the ERP item description to avoid substitution.

Frequently Asked Questions

Which filled PTFE is best for hydraulic rod seals?

Glass and MoS2 filled, bronze filled and carbon filled grades are all common for hydraulic seals. The right one depends on rod hardness, pressure and fluid. Glass-filled needs a hard, smooth rod; carbon and polyimide are gentler on softer rods.

Is glass-filled PTFE FDA compliant?

Not by default. FDA-compliant grades are normally virgin PTFE or specific certified compounds. Glass-filled grades are generally not food contact grades. Always confirm the regulatory status on the compound datasheet and certificate for the lot you buy.

What temperature can PTFE seals handle?

PTFE is usually rated from about -200 deg C to +260 deg C, with the filler and seal design affecting practical limits. Pressure and creep reduce the usable range at the upper end. Confirm limits with the seal supplier for your application.

Why use a spring-energised PTFE seal?

PTFE has little elastic recovery, so a metal spring or elastomer energiser supplies the sealing force and compensates for wear and thermal changes. This lets PTFE seal at low pressure and cryogenic temperature where an O-ring would harden or fail.

If PTFE grade substitutions are a recurring quality escape, we can show how the grade is carried through your ERP item master and checked automatically against approved drawings.

Get ERP alerts and new tools

Support deadlines, release changes and new free tools for the ERP you run. A couple of emails a month at most.

Free. Unsubscribe with one click from any email.

ArchRay builder
Design the on-prem AI stack: model, GPUs, RAG pipeline, guardrails
See memory, speed and cost as you swap parts, then export the diagram. Free, in your browser.
Open the builder

Keep exploring

Free tools

Guides

Manufacturing hubs