Engineering & PLMFree referencePDF, Excel, Word exportRubber & Elastomer Products

Rubber Durometer and Elastomer Compound Reference

Choosing a rubber compound starts with a short list of families, and the same questions come up on every inquiry: what fluid, what temperature, what hardness and what density. This reference puts the common elastomers side by side so you can narrow choices and fill in specific gravity for the weight calculators.

Download:
ElastomerASTM D1418 codeTypical Shore A rangeTypical specific gravityApprox. service range (C)Strong againstWeak againstRelative cost
Nitrile (Buna-N)
NBR
40 to 90
1.0 to 1.5
-30 to 100
Petroleum oils, fuels, hydraulic fluids, water
Ozone, weathering, polar solvents, brake fluid
Low
Hydrogenated nitrile
HNBR
50 to 90
1.1 to 1.4
-30 to 150
Hot oil, sour gas, abrasion, ozone
Polar solvents, ketones
Medium to high
Ethylene propylene diene
EPDM
30 to 90
1.0 to 1.3
-50 to 150
Water, steam, brake fluid (glycol), ozone, weathering
Petroleum oils and fuels
Low
Fluoroelastomer (Viton type)
FKM
55 to 90
1.8 to 2.0
-20 to 200
Fuels, oils, many acids, heat
Ketones, hot water or steam, amines
High
Perfluoroelastomer
FFKM
65 to 90
2.0 to 2.2
-15 to 260
Nearly all chemicals, very high heat
Cost, low-temperature flexibility
Very high
Silicone (methyl vinyl)
VMQ
20 to 80
1.1 to 1.3
-55 to 200
Wide temperature range, ozone, food and medical grades
Tear and abrasion strength, hydrocarbon fuels
Medium
Fluorosilicone
FVMQ
40 to 80
1.3 to 1.5
-60 to 175
Fuels and oils with low-temperature flexibility
Tear strength, cost
High
Polychloroprene (Neoprene)
CR
30 to 90
1.2 to 1.5
-40 to 100
Weathering, flame resistance, moderate oils, refrigerants
Strong oxidizers, aromatic solvents
Low to medium
Natural rubber
NR
30 to 90
0.95 to 1.3
-50 to 80
Resilience, tear and fatigue, abrasion
Oils, ozone, heat
Low
Styrene butadiene
SBR
40 to 90
1.0 to 1.3
-50 to 100
Abrasion, water, general purpose
Oils, ozone
Low
Butyl
IIR
40 to 80
0.9 to 1.3
-45 to 120
Low gas permeability, ozone, vibration damping
Petroleum oils
Low to medium
Chlorosulfonated polyethylene
CSM
50 to 90
1.1 to 1.5
-30 to 120
Ozone, weathering, oxidizing chemicals
Aromatic and chlorinated solvents
Medium
Polyacrylate
ACM
50 to 90
1.1 to 1.4
-20 to 150
Hot oil, transmission fluid, ozone
Water, steam, low-temperature flexibility
Medium
Ethylene acrylic
AEM
40 to 90
1.1 to 1.4
-30 to 160
Hot oil, ozone, wide fluid mix
Fuels, strong acids
Medium
Epichlorohydrin
ECO
40 to 90
1.3 to 1.6
-40 to 130
Fuels, ozone, low gas permeability
Steam, strong acids
Medium
Polyurethane (cast or millable)
AU / EU
60A to 75D
1.1 to 1.3
-40 to 80
Abrasion, tear, load bearing, oils
Hot water, steam, acids
Medium

Values are typical industry ranges for general guidance, not specifications. Real compounds vary with fillers, cure system and grade, so always check the supplier data sheet and test against the actual fluid, temperature and duration. Shore A is measured with a durometer per ASTM D2240 or ISO 48-4: roughly 30 to 40 is soft like a rubber band to a pencil eraser, 60 to 70 is firm like a tire tread, and 90 is hard like a shoe heel. Shore D is used for harder plastics and urethanes.

Clean up compound data in your ERP

Optional: a short review of how compound codes, density and cost are stored in your item master and where they conflict.

Optional. The tool and every export work without this. No spam.

Was this tool useful?

How to use it

Search by abbreviation or by the fluid or property you care about, for example oil, steam or ozone. Compare the strong and weak columns with the part's environment, then use the typical specific gravity to feed the weight and cost calculators. The cost column helps an early budget conversation. Once you pick a family, request a data sheet for a specific compound, since two NBR 70 materials can differ in density, fluid swell and compression set.

  • Match the fluid first, then temperature, then hardness.
  • Check low-temperature limits for outdoor and aerospace use.
  • Treat the ranges as starting points, not specifications.

Understanding durometer

Hardness is reported on a Shore scale measured with an indenter and a calibrated spring, standardized in ASTM D2240 and ISO 48-4. Shore A covers soft to medium-hard rubber from about 20 to 90, and Shore D covers harder materials. Readings are sensitive to specimen thickness (at least 6 mm is typical for a stable reading), temperature and dwell time, so a molded part may read a few points differently from a test slab. Tolerances of plus or minus 5 points are common on drawings.

Compound naming and callouts

ASTM D1418 gives each rubber a short code such as NBR, EPDM or FKM. Specifications such as ASTM D2000 and SAE J200 use a line callout that combines type, class, hardness, tensile strength and suffix requirements for heat, fluid and compression set. Customers and drawings may instead cite a military, OEM or proprietary compound number. Always capture the full callout at quote time, because it controls which materials are allowed.

Common mistakes

Common errors include specifying EPDM for an oil seal, using standard FKM in hot water or steam where a peroxide-cured grade is needed, and overlooking that silicone is weak in tear strength and in hydrocarbon fuels. Another is ordering by durometer alone: a 70 Shore A NBR and a 70 Shore A silicone behave completely differently in fluid, heat and wear. Match the compound to the environment, not only the hardness.

Frequently Asked Questions

What does Shore A durometer mean?

It is a hardness reading from an indenter pressed into rubber, defined in ASTM D2240 and ISO 48-4. Higher numbers mean harder material. Most rubber parts fall between 40 and 90 Shore A, with 70 being a very common general-purpose value.

Which rubber is best for oil resistance?

NBR is the economical standard for petroleum oils and fuels. HNBR, FKM and ACM handle hotter oil. EPDM and natural rubber swell badly in petroleum, so avoid them for oil contact.

Which elastomer has the widest temperature range?

Silicone offers a very wide range, roughly -55 to 200 C, and fluorosilicone adds fuel resistance. FFKM reaches the highest heat but has poor low-temperature flexibility and very high cost.

Is specific gravity the same for all compounds of one type?

No. Fillers, plasticizers and fluoropolymer content change density. NBR can range from about 1.0 to 1.5 depending on formulation. Use the figure from the data sheet for the exact compound when calculating weight and cost.

If your item master holds compound codes inconsistently, Netray can help normalize them and link them to specific gravity and cost for quoting. Ask for a review of your material data.

Get ERP alerts and new tools

Support deadlines, release changes and new free tools for the ERP you run. A couple of emails a month at most.

Free. Unsubscribe with one click from any email.

ArchRay builder
Design the on-prem AI stack: model, GPUs, RAG pipeline, guardrails
See memory, speed and cost as you swap parts, then export the diagram. Free, in your browser.
Open the builder

Keep exploring