Sheet Metal Cost Estimator: Part Costing Sheet

To cost a sheet metal part, work out the blank weight and sheet cost, then add cutting, bending, finishing and setup, and apply your margin. This estimator does that in one page, shows the price per kg and per square foot, and charts how the unit price falls as batch size grows.

Your numbers

mm
mm
mm
per kg

Your purchase price for the sheet, delivered.

75 %

Share of the sheet that ends up in parts. Scrap and skeleton are paid for.

mm

Total perimeter including holes.

m/min
per hour
sec
per hour
per sq ft

Powder coat, plating or paint, per sq ft of surface (both sides).

100 parts
25 %

Your results

Total cost per part
$7
Quote price per part
$10
Part weight
1.57
Net weight in kg of the blank, before nesting loss.
Sheet weight consumed per part
2.0933
Net weight plus its share of scrap, in kg.
Sheet price per sq ft
$2
Price per square foot of sheet at this thickness and material.
Material cost per part
$2
Cutting cost per part
$1
Assumes about 0.5 seconds per pierce on thin material; adjust the laser rate to compensate for thick plate.
Bending cost per part
$2
Finishing cost per part
$1
Setup per part
$1

An estimate for quoting. Real quotes should add outbound freight, packaging, inspection, deburring, hardware insertion and any overhead you do not already include in the machine rates. Check weights against your material supplier.

Free, optional. Reopen it on any device.
Save results:

Cost and price per part vs batch quantity

Sweeps Batch quantity from 1 to 500, holding your other inputs fixed.

Automate quoting from your ERP

Optional: we can review how to feed rates, routings and material prices into an estimating assistant.

Optional. The tool and every export work without this. No spam.

Was this tool useful?

How to use the sheet metal cost estimator

Enter the blank size and thickness from the flat pattern, pick the material, and type your sheet price per kg. Add the cut length and pierces from your CAM or nesting software, the bend count, and your machine rates. Set the batch quantity and the margin you want. The result shows cost per part, quote price, and a chart of price against quantity, so you can see where a larger batch makes sense.

The formulas behind the calculation

Weight in kg equals length times width times thickness in millimetres, times density in g/cm3, divided by one million. Material cost divides that weight by nesting utilization, because scrap is paid for, then multiplies by price per kg. Price per square foot equals price per kg times thickness times density, divided by 10.7639. Cutting time is cut length divided by speed, plus pierce time. Bending is bends times seconds per bend. Price equals cost divided by one minus margin.

Worked example

A 400 by 250 by 2 mm mild steel blank weighs 1.57 kg. At 75 percent utilization it consumes 2.09 kg, about 2.30 in material at 1.10 per kg. Cutting 1.7 m at 3 m per minute plus pierces takes about 0.6 minutes, roughly 0.9 in laser time. Four bends add around 0.17. With finishing and setup spread over 100 parts, cost lands near 5 and the price at 25 percent margin near 6.6. Quantities of 1 to 10 cost far more because setup dominates.

Common mistakes

Estimators often forget nesting loss, charge the laser at one flat rate for all thicknesses, ignore setup on small batches, and apply margin as a markup instead of on price. Remember that stainless and aluminium cost more per kg but differ in cutting speed, and that thicker plate cuts much slower. If your quotes live in an ERP, keep rates and material prices there so the estimate and the final job cost can be compared.

Frequently Asked Questions

How much does sheet metal cost per kg and per square foot?

It depends on material, grade, thickness and market. Enter your own supplier price per kg: the calculator converts it to a price per square foot for the chosen thickness. Stainless and aluminium usually cost several times more per kg than mild steel.

How do I calculate sheet metal weight?

Multiply length, width and thickness in millimetres, multiply by density in g/cm3, and divide by one million to get kilograms. For example, 400 by 250 by 2 mm mild steel at 7.85 gives 1.57 kg.

What nesting utilization should I assume?

Use your actual numbers from nesting software. Many shops see 65 to 85 percent depending on part shapes and whether remnants are reused. Low utilization on large simple parts is a quoting red flag worth checking.

Can I use this as a sheet metal costing sheet in Excel?

Yes, you can export the inputs and results to Excel or PDF and keep them with the quote. For repeated work, store your machine rates and material prices in a master spreadsheet or ERP and copy them in each time.

If you want quotes costed from your own routings and material prices automatically, we can build a private estimating assistant on your ERP data, on-premises if you prefer.

Get ERP alerts and new tools

Support deadlines, release changes and new free tools for the ERP you run. A couple of emails a month at most.

Free. Unsubscribe with one click from any email.

ArchRay builder
Design the on-prem AI stack: model, GPUs, RAG pipeline, guardrails
See memory, speed and cost as you swap parts, then export the diagram. Free, in your browser.
Open the builder

Keep exploring

Free tools

Guides

AI on your ERP