SMED Changeover Improvement Checklist

SMED, single minute exchange of die, is a method for cutting changeover time by separating work that must happen with the machine stopped from work that can be done while it runs. This checklist follows the classic stages so a workshop team does not miss steps.

0%

0 of 32 items complete

10 critical items still open - these are the highest-risk gaps.

Download checklist:

Stage 0: Prepare and observe

Stage 1: Separate internal and external work

Stage 2: Convert internal work to external

Stage 3: Streamline remaining internal and external work

Stage 4: Standardize and sustain

Aim to complete every critical item before declaring the workshop finished. Changeover is measured from last good part to first good part, which includes the adjustment time.

Compare actual changeovers with ERP setup times

Optional: we can outline a read-only comparison of real changeover durations versus planning standards.

Optional. The tool and every export work without this. No spam.

How to use the checklist

Work through the stages in order during a one to three day workshop. Print the PDF and tick items as the team completes them. Critical items are those that most changeover projects fail without: a clear definition of the endpoint, a video of the real changeover, a proper internal versus external split, and updated planning data afterward. Export to Excel if you want to add owners and due dates for follow-up actions.

The method behind SMED

Shigeo Shingo developed SMED at Toyota supplier plants. The idea is simple: record the changeover, classify every element as internal or external, move as much as possible from internal to external, and then simplify what remains. Many sites achieve substantial reductions from the first two stages alone, simply by preparing tools and material before the machine stops. Later stages require small engineering changes such as quick clamps and fixed stops.

  • Internal work needs the machine stopped.
  • External work can be done while the machine runs.
  • Adjustment and trial runs are usually the largest hidden time.

Why changeover time matters for planning

Short changeovers allow smaller lots, which reduces inventory and lead time and supports leveled scheduling. When the improvement is real, update the setup time in the routing and the lot size rules in the ERP, otherwise planning continues to assume old values and the benefit disappears into larger batches. Record changeover durations in your MES or shop floor system so the numbers are credible.

Common mistakes

Teams often skip the video and argue from memory. Others stop measuring at the first piece produced rather than the first good piece, which hides adjustment waste. Another mistake is buying expensive quick change hardware before doing the free work of preparing tools and material. Finally, gains vanish when the standard is not trained or audited, so schedule the 30 day review in advance.

Frequently Asked Questions

What does SMED stand for?

SMED stands for single minute exchange of die. The goal is to bring changeovers into the single digit minutes, meaning under ten, although many sites use the method to simply halve their changeover time without reaching that target.

What is the difference between internal and external setup?

Internal setup is work that can only be done when the machine is stopped, such as removing a die. External setup can be done while the machine is running, such as fetching and preparing the next tooling. SMED moves work from internal to external.

When does a changeover end?

A changeover is normally measured from the last good part of the previous run to the first good part of the next run. Counting only until the machine restarts hides the adjustment and trial time that often make up a large share.

Does SMED need new equipment?

Not at first. Preparing tools, material and paperwork before the stop, and organizing a changeover cart, cost very little. Quick clamps, fixed stops and presetting equipment come later and should be justified by the measured gain.

If setup times in your ERP no longer reflect reality, we can help compare actual changeover data with routing standards and flag where planning is out of date.