Supply Chain & InventoryFree calculatorPDF, Excel, Word exportMetal Stamping

Coil Weight, Length and Parts per Coil Calculator for Stamping

Buyers order coils by weight, the press consumes them by length, and the estimator needs parts per coil. This calculator converts between all three from the outside diameter, core size, width and gauge.

Your numbers

in
in
in
98 %

Accounts for air between wraps and edge camber. 97 to 99 percent is typical for slit coil.

in
ft

Feet lost at threading and at the end of the coil.

SPM
80 %

Your results

Coil length (feet)
2,035
Coil weight (lb)
2,497
Parts per coil
7,883
Coil length
24,425
Annular area of wraps divided by thickness, in inches.
Pounds per inch of width (PIW)
416.1992
Compare with the uncoiler capacity plate, which is usually quoted in PIW.
Press run time per coil
3 hrs
Coils needed per 100,000 parts
12.6855

Geometric estimate for planning. Actual coil weight on the tag is the reference for receiving and costing.

Free, optional. Reopen it on any device.
Save results:

Coil weight vs outside diameter

Sweeps Coil outside diameter from 30 to 60, holding your other inputs fixed.

Reconcile coil lots against consumption

Optional: see how planned vs actual parts per coil could be tracked from your ERP lot and backflush data.

Optional. The tool and every export work without this. No spam.

Was this tool useful?

How to use it

Measure or read the coil outside diameter and choose the core size. Enter the slit width, gauge and material. The tool returns footage, weight, PIW and parts per coil using your progression pitch. Set a lead and tail allowance for threading and end-of-coil loss. The chart shows how strongly weight rises with outside diameter; because weight grows with the square of the diameter, a few extra inches on a large coil is a lot of steel. Use PIW to check against the uncoiler and cradle rating before you order heavier coils.

Formulas

Coil length in inches equals pi times (OD squared minus ID squared) divided by four, divided by thickness, times a wrap density factor. Weight equals length times width times thickness times density. PIW equals weight divided by width. Parts per coil equals usable length divided by progression pitch, rounded down. Run time equals parts divided by good strokes per hour. All are standard geometric relations; the packing factor is the only empirical term.

  • Use the density that matches the alloy; aluminum is about a third of steel.
  • Coil set, camber and edge wave reduce the packing factor.
  • If the coil is not mill-wound tightly, weigh a sample coil to calibrate the factor.

Common mistakes

Planners often forget the lead and tail loss, which matters on short runs and can leave a coil that is a few hundred parts short of a lot. Another mistake is ordering to a coil weight that the uncoiler cannot hold. A third is treating the core as the same for every supplier; a 16 inch and a 20 inch core change length by several percent. For job costing, compare the calculated weight with the tag weight on receipt and investigate gaps larger than 2 percent.

Frequently Asked Questions

How do I calculate coil length from weight?

Divide weight by width times thickness times density to get length in inches. For a 2,500 lb steel coil, 6 inches wide and 0.060 inch thick, that is about 24,500 inches or roughly 2,040 feet.

What does PIW mean?

Pounds per inch of width. It is coil weight divided by coil width and is the usual capacity rating of uncoilers, cradles and mandrels. Heavy narrow coils can exceed the PIW rating even if total weight looks acceptable.

Why does my actual parts per coil differ?

Typical reasons are lead and tail loss, strip scrapped at splices, camber, a coil that is wound looser than assumed, and reject strips during setup. Track actual parts per coil by lot and tune the allowance and packing factor.

Does this work for aluminum coil?

Yes. Choose the aluminum density. Coil lengths for the same OD, ID and gauge will be the same as steel, but the weight will be about a third, so the PIW limit is less likely to be the constraint.

If coil receipts, lot numbers and consumption are tracked in your ERP, we can add a check that compares planned parts per coil with actual yield per heat or lot.

Get ERP alerts and new tools

Support deadlines, release changes and new free tools for the ERP you run. A couple of emails a month at most.

Free. Unsubscribe with one click from any email.

ArchRay builder
Design the on-prem AI stack: model, GPUs, RAG pipeline, guardrails
See memory, speed and cost as you swap parts, then export the diagram. Free, in your browser.
Open the builder

Keep exploring