Costing & FinanceFree worksheetPDF, Excel, Word exportMetal Stamping

Stamping Quote Breakdown Worksheet (Excel)

This worksheet puts several stamping parts on one quote page and calculates unit cost, unit price and annual revenue from material, press time and secondary cost. Edit the rows, add parts and export to Excel.

Free, optional. Reopen it on any device.
Download:
Part numberProcessAnnual volumeGross lb per partCoil $/lbGood parts/hrPress rate $/hrSecondary $/pcMargin %Material $/pcPress $/pcUnit cost $/pcUnit price $/pcAnnual revenueAnnual gross profit
0.0407
0.033
0.1137
0.1386
$16,637
$2,995
0.013
0.0183
0.0464
0.0552
$13,796
$2,207
0.2418
0.1333
0.5951
0.763
$30,520
$6,714
0.099
0.05
0.179
0.2238
$13,425
$2,685
0.247
0.0722
0.4092
0.5052
$45,469
$8,639
Total annual revenue
$119,846
Total annual gross profit
$23,240
Total pieces per year
560,000
Blended gross margin
19.4%
Gross profit divided by revenue across all parts.
Average selling price per piece
$0

Material is gross weight times coil price, with no scrap credit. Add die amortization as a secondary cost per piece, or quote tooling separately. Use the Piece Price at Volume calculator to derive pph, rate and setup assumptions.

Move estimating out of spreadsheets

Optional: an outline of how quote data could flow into your ERP routing and standard cost records.

Optional. The tool and every export work without this. No spam.

Was this tool useful?

How to use it

For each part, enter the process, annual volume, gross pounds per part from your strip layout, coil price, good parts per hour and press rate. Add any secondary cost per piece such as plating, tumbling or packaging, and the margin you want. The worksheet calculates material and press cost per piece, unit cost, unit price at target margin and annual revenue and gross profit. The summary shows blended margin and average price per piece, which is useful when a customer asks you to bundle a family of parts.

How the columns are calculated

Material cost per piece equals gross pounds times price per pound. Press cost equals press rate divided by good parts per hour. Unit cost adds the secondary cost. Unit price equals unit cost divided by one minus the margin fraction, so the margin is a share of price. Annual revenue equals volume times unit price. Because the model has no tooling, setup or freight term, add those as secondary cost per piece or quote them separately.

  • Use gross weight, not net, for material.
  • Good parts per hour should already include press efficiency.
  • Volumes are annual; match them to the committed volume in the RFQ.

Common mistakes

Estimators often apply the same press rate to every process even though a deep draw or transfer press carries a higher burden. Another mistake is to quote price breaks without re-computing material, which hides that a bigger coil lot can lower the price per pound. Keep a copy of the filled worksheet with the RFQ number as the audit trail for later price review requests.

Frequently Asked Questions

How is the unit price calculated?

Unit price equals unit cost divided by one minus margin. With a unit cost of 0.40 and a margin of 20 percent, the price is 0.50. Multiplying cost by 1.20 would give only 0.48 and a lower real margin.

Can I add tooling cost?

Compute die amortization per piece with the Piece Price at Volume calculator and enter it in the secondary cost column, or quote tooling as a separate line item. Keep one method per quote to avoid double counting.

How many parts can I enter?

Add as many rows as you need. The totals and blended margin update as rows are edited, and the whole table exports to Excel or CSV.

Should material use gross or net weight?

Gross. The coil you buy includes the scrap the die creates. If you receive scrap credit, subtract it in the secondary cost column as a negative value or use the strip layout calculator to get the net cost.

If your quotes are built in spreadsheets and re-keyed into the ERP, we can help connect estimating to item, routing and standard cost data.

Get ERP alerts and new tools

Support deadlines, release changes and new free tools for the ERP you run. A couple of emails a month at most.

Free. Unsubscribe with one click from any email.

ArchRay builder
Design the on-prem AI stack: model, GPUs, RAG pipeline, guardrails
See memory, speed and cost as you swap parts, then export the diagram. Free, in your browser.
Open the builder

Keep exploring

Free tools

Guides

AI on your ERP

Manufacturing hubs