Supply Chain & InventoryFree templatePDF, Excel, Word exportMetal Stamping

Stamping RFQ Package Template (Request for Quote)

A vague RFQ gets vague quotes. This template collects the part, material, volume, tooling, quality and delivery data a stamper needs, and asks for a price breakdown so you can compare bids fairly.

Fill in

Live preview
Free, optional. Reopen it on any device.
Download:

Stamping RFQ Package Template

Request for Quote

Buyer: Acme Assemblies Inc. Contact: J. Rivera, jrivera@example.com RFQ number: RFQ-26-0412 Quote due: 2026-11-15

Part data

ItemDetail
Part number and revisionBRK-2041 Rev C
DescriptionMounting bracket, formed, two pierced holes
MaterialCR steel 1010, ASTM A1008 CS Type B
Thickness and tolerance0.060 in +/- 0.004 in
FinishZinc plate, clear passivate, 5 to 8 micron
Estimated annual usage120000
Preferred processProgressive die

Pricing requested

Please quote piece price at the following annual quantities: 25,000 / 60,000 / 120,000 / 250,000.

State separately: tooling price, tooling lead time, delivery terms (Incoterms 2020), packaging cost, and any minimum order or surcharge. Please list material basis, coil price assumption and any material price adjustment clause.

Price breakdown requested

ElementPer pieceNotes
Material (gross)State weight and price per lb
Conversion (press and labor)State parts per hour
Secondary operationsPlating, tumbling, assembly
Tooling amortization (if any)State pieces and years
Packaging and freight
Total piece price

Tooling and launch

Tooling: Buyer owned. PPAP level: Level 3. Target PPAP and PSW date: 2027-03-01. Please state the die type, number of stations, press size, expected die life, and a sample submission plan.

Packaging and special requirements

Packaging: Returnable totes, 1,000 pcs per tote, VCI liner, labeled to customer standard.

Special requirements: Burr height maximum 0.004 in, no burr on cosmetic face. Critical dimensions per control plan on drawing.

Supplier response

QuestionResponse
Quality system certification
Capacity available at EAU
Tooling lead time (weeks)
Price validity (days)
Exceptions to drawing or specification

Approvals

Buyer / Date
Sourcing manager / Date
Supplier representative / Date

A starting point for sourcing, not legal advice. Attach the drawing, 3D model, quality requirements and terms and conditions. Confirm confidentiality terms before sharing drawings.

Track RFQs and awards in your ERP

Optional: a walkthrough of how RFQ responses and awarded prices could be captured against purchasing records.

Optional. The tool and every export work without this. No spam.

Was this tool useful?

How to use the template

Fill in the part data, annual usage and price breaks. Choose who owns the tooling, because that changes how the supplier prices the part. State the PPAP level and the target date so the supplier can plan die build and sampling. The generated document includes a price breakdown table that asks for material, conversion, secondary operations, tooling amortization and packaging separately. Attach the drawing and 3D model when you send it, and export to PDF or Word.

Why price breaks and a breakdown matter

Stamping cost depends on volume because die cost and setup are spread across the program. Asking for several breaks shows the supplier's real cost curve and helps you negotiate. A line-item breakdown lets you compare material assumptions, which is where the largest gaps appear. If one bidder uses a 55 percent utilization and another 75 percent, the difference is visible in the gross weight line rather than hidden in the total.

  • Ask for the material basis and any index-linked adjustment clause.
  • State the Incoterms 2020 delivery point for each quote.
  • Require quote validity in days.

Common mistakes

Buyers often send a drawing with no volume, no revision and no tooling terms, and receive quotes that cannot be compared. Another is leaving PPAP level unstated, which changes the supplier's plan and price. A third is failing to define tooling ownership, bailment and maintenance responsibilities, which leads to disputes later. Keep the RFQ number in all follow-up documents and log the quotes in your ERP or a sourcing file for later audit.

Frequently Asked Questions

What should a stamping RFQ include?

Part number and revision, drawing and model, material and thickness, finish, annual usage and price breaks, tooling ownership, PPAP level and dates, packaging, delivery terms and quality requirements. Missing items lead to assumptions that make quotes hard to compare.

How many price breaks should I request?

Three to five that bracket the realistic range, such as 25 percent, 50 percent, 100 percent and 200 percent of EAU. This shows how price moves with volume and gives leverage if forecast volume changes.

Who should own the tooling?

Practice varies. Buyer-owned tooling gives portability but the buyer funds it. Supplier-owned tooling amortized in the piece price lowers up-front cost but needs a minimum volume or termination clause. Decide before the RFQ, and state it clearly.

Do I need PPAP for every stamped part?

Only if the customer requires it. Automotive programs usually require it, often at Level 3. Other sectors use first article inspection or a quality plan. State the requirement in the RFQ.

If RFQs, supplier quotes and awarded prices live in email and spreadsheets, we can help connect them to your ERP purchasing records.

Get ERP alerts and new tools

Support deadlines, release changes and new free tools for the ERP you run. A couple of emails a month at most.

Free. Unsubscribe with one click from any email.

ArchRay builder
Design the on-prem AI stack: model, GPUs, RAG pipeline, guardrails
See memory, speed and cost as you swap parts, then export the diagram. Free, in your browser.
Open the builder

Keep exploring