Industry TemplatesFree referencePDF, Excel, Word exportMetal Stamping

Stamping Material Density and Shear Strength Reference Table

Weight, cost and press tonnage all start with two material properties: density and shear strength. This reference lists both for the alloys most often stamped, so you can fill the calculators without searching a handbook.

Download:
MaterialTypical grade or temperDensity (lb/in3)Density (g/cm3)Approx. shear strength (ksi)Stamping note
Carbon steel
CR 1008/1010, drawing quality
0.284
7.85
35 to 45
Baseline for most tonnage and weight estimates.
Carbon steel
HR pickled and oiled, 1010
0.284
7.85
38 to 48
Thickness tolerance is wider than cold rolled.
Carbon steel
Spring steel 1050 to 1095, annealed
0.284
7.85
55 to 75
High force; check tonnage and punch wear.
Galvanized steel
G60/G90 coated
0.284
7.85
35 to 45
Coating adds a small weight; zinc can build up on tooling.
HSLA steel
50 to 80 ksi yield
0.284
7.85
45 to 65
More springback; use more clearance.
Stainless steel
304 annealed
0.289
8
55 to 70
Work hardens; sharp tooling and good lubrication.
Stainless steel
316 annealed
0.289
8
55 to 70
Similar to 304; often more galling.
Stainless steel
301 full hard
0.285
7.88
90 to 120
Very high force; common for springs and clips.
Stainless steel
430 annealed
0.28
7.75
40 to 50
Ferritic; lower work hardening than 304.
Aluminum
1100-O to H14
0.098
2.71
7 to 11
Soft; good for deep draws.
Aluminum
3003-H14
0.099
2.73
14 to 16
Common general-purpose aluminum.
Aluminum
5052-H32
0.097
2.68
18 to 21
Good formability and strength balance.
Aluminum
6061-T6
0.098
2.7
28 to 32
Cracks when bending sharp radii in T6.
Copper
C110, half hard
0.322
8.91
24 to 30
Used for busbar and terminals.
Brass
C260, half hard
0.308
8.53
38 to 46
Cartridge brass; strong deep draw alloy when annealed.
Phosphor bronze
C510, half hard
0.32
8.86
45 to 55
Spring contacts and connectors.
Beryllium copper
C172, annealed
0.298
8.25
45 to 60
Hardens on heat treat; special handling for fumes and dust.
Titanium
Grade 2
0.163
4.51
35 to 50
Galling; often warm formed.

Densities are standard handbook values. Shear strengths are approximate ranges for planning and vary with temper, thickness and lot; use the mill certificate for design. A common shortcut is shear strength of about 0.75 times ultimate tensile strength for steels.

Standardize material master data

Optional: a short review of how material grade, density and spec data is held in your ERP item master.

Optional. The tool and every export work without this. No spam.

Was this tool useful?

How to use the table

Search by alloy, grade or temper. Use density in lb/in3 to convert strip area and thickness into weight, as in the strip layout and coil calculators, and use g/cm3 when a metric supplier quotes by kilogram. Use the shear column as a starting point in the tonnage calculator. Where an alloy appears at several tempers, pick the one that matches the purchase order; the strength range can be a factor of two between annealed and full hard.

Where the numbers come from

Densities are the standard handbook figures for each alloy family. Shear strength ranges are typical for the temper listed and are rounded. For steels, ultimate shear strength is about 75 percent of ultimate tensile strength. For aluminum, the ratio is about 0.6 to 0.65. These are planning values, not specifications; they do not replace the mill test report for the lot you will actually run.

  • Density does not change with temper in any practical way.
  • Shear strength rises sharply with cold work.
  • Coatings such as zinc add small weight; ignore for estimating unless the spec is tight.

Common mistakes

Using steel density for stainless or aluminum is the most common mistake in weight estimates, and it is easy to do when a calculator default is left unchanged. Another is using tensile strength in a tonnage formula that expects shear strength. A third is ignoring that full hard and spring tempers can double the force; verify the temper on the print before you pick a press.

Frequently Asked Questions

What is the density of steel in lb/in3?

Carbon steel is about 0.284 lb/in3, which is 7.85 g/cm3. Stainless 304 and 316 are about 0.289 lb/in3 or 8.0 g/cm3. These are the values used in most sheet metal weight calculations.

How do I estimate shear strength from tensile strength?

For many steels, ultimate shear strength is roughly 75 percent of ultimate tensile strength. For aluminum, use about 60 to 65 percent. Use the mill certificate if you have it; it is better than a table range.

Why do ranges differ so much for the same alloy?

Temper and cold work. Annealed stainless is around 55 to 70 ksi shear, while full hard 301 can be above 100 ksi. Always confirm the temper on the print before using a value for tonnage.

Can I use these for non-stamping work?

Densities are general. Shear values are for sheet and strip in typical stamping tempers, so check them against the relevant material standard for structural or fatigue design.

If material properties and grades are scattered across item descriptions and spreadsheets, we can help structure them in the ERP so weight and cost calculations stay consistent.

Get ERP alerts and new tools

Support deadlines, release changes and new free tools for the ERP you run. A couple of emails a month at most.

Free. Unsubscribe with one click from any email.

ArchRay builder
Design the on-prem AI stack: model, GPUs, RAG pipeline, guardrails
See memory, speed and cost as you swap parts, then export the diagram. Free, in your browser.
Open the builder

Keep exploring

Free tools

Guides

Manufacturing hubs