Discrete ManufacturingFree worksheetPDF, Excel, Word exportFabrication

Steel Plate Cut List Weight Worksheet (Excel Export)

A cut list with weights is the starting point for a steel order, a freight quote and a lifting plan. This worksheet keeps the arithmetic out of your head: enter size and density once per row and the weights follow.

Free, optional. Reopen it on any device.
Download:
Part markMaterialQtyLength (mm)Width (mm)Thickness (mm)Density (kg/m3)Weight each (kg)Line weight (kg)
37.68
150.72
2.355
28.26
8.512
51.072
2.16
21.6
73.5938
147.1875
Total pieces
34
Total weight (kg)
398.8395
Total weight in tonnes
0.3988
Average piece weight (kg)
11.7306

Weights are theoretical, based on nominal size and the density you enter. Mill tolerance on plate thickness, kerf and edge trim are not included.

Compare ERP item weights to calculated weights

Optional review of how your item master weights compare with the raw material you actually buy.

Optional. The tool and every export work without this. No spam.

Was this tool useful?

How to use the cut list

Enter one row per part mark. Give quantity, length, width and thickness in millimetres, and the density of the alloy in kg per cubic metre. The sheet returns the weight of one piece and the weight of the whole line. Totals and the average piece weight are shown below the table. Use the export button to move the result into Excel for your purchase request or into PDF for a quote file.

  • Keep all dimensions in millimetres
  • Use one row per mark and material
  • Change the density for each alloy
  • Add rows for offcuts you plan to keep

The formula behind the weights

Weight equals volume times density. With dimensions in millimetres, volume in cubic millimetres divided by one billion gives cubic metres, and multiplying by density in kg per cubic metre gives kilograms. A 600 x 400 x 20 mm plate in steel at 7850 kg/m3 is 4.8 million cubic mm, or 0.0048 cubic metres, which weighs 37.7 kg. The same logic works for any flat part, so you can use it for aluminum, stainless or copper alloys by changing the density.

Common mistakes and ERP notes

The most frequent error is mixing units, for example entering thickness in inches against millimetre lengths. The second is using one density for every row on a mixed order. Theoretical weight also differs from mill weight, because plate is rolled to a thickness tolerance and often runs slightly over nominal. When you load parts into an ERP, the net weight field on the item master usually expects the finished part weight, while the purchase weight is the raw plate weight, so keep both columns in your records.

  • Do not forget kerf and trim when ordering whole plates
  • Check whether freight is quoted on theoretical or scale weight
  • Record the density source on the drawing or spec

Frequently Asked Questions

What density should I use for carbon steel?

Use 7850 kg/m3 for carbon and low alloy structural steel. It is the common handbook value and matches most mill weight tables. Stainless steels are slightly higher, about 7900 to 8000, depending on grade and the reference you follow.

Is the result the same as the weight on the mill invoice?

Not exactly. The sheet gives theoretical weight from nominal size. Mills invoice on scale weight, which is usually a little higher because plate is rolled within a thickness tolerance. Expect a small difference and agree the basis with your supplier.

Can I use inches?

Convert to millimetres first, multiplying inches by 25.4. The formula and the density unit assume millimetres and kg per cubic metre. Mixing units in the same row gives wrong weights without any warning.

Does it account for holes and cutouts?

No. It treats each part as a full rectangle. For parts with large cutouts, reduce the dimensions to an equivalent size or subtract the cutout volume by adding a separate negative-quantity row for your own records.

If your item master weights drift from what you actually buy, we can build an agent that compares ERP net weights to calculated stock weights and flags gaps.

Get ERP alerts and new tools

Support deadlines, release changes and new free tools for the ERP you run. A couple of emails a month at most.

Free. Unsubscribe with one click from any email.

ArchRay builder
Design the on-prem AI stack: model, GPUs, RAG pipeline, guardrails
See memory, speed and cost as you swap parts, then export the diagram. Free, in your browser.
Open the builder

Keep exploring

Free tools

Guides

AI on your ERP

Manufacturing hubs