ERP OperationsFree checklistPDF, Excel, Word exportSYSPRODiscrete ManufacturingSouth AfricaAll SYSPRO tools

SYSPRO MRP Checklist: Data and Run Review Before You Trust the Plan

MRP only plans as well as the data under it. When SYSPRO suggests nothing, too much, or orders for the wrong date, the cause is almost always master data, supply dates or run parameters rather than the planning engine. This checklist walks through the places to look.

0%

0 of 26 items complete

9 critical items still open - these are the highest-risk gaps.

Free, optional. Reopen it on any device.
Download checklist:

Item master data

Bills of material and routings

Warehouses and supply

Demand and forecast

Running and reviewing MRP

Tick each item you have verified. Critical items cause wrong or missing suggestions when they are wrong, so clear those first.

MRP data health review

Optional: send us your checklist result and we will suggest the quickest data fixes for your planners.

Optional. The tool and every export work without this. No spam.

Was this tool useful?

How to use the checklist

Work through the groups in order: item data, bills and routings, warehouses and supply, demand, and the run itself. Tick items you have verified in your own company and note exceptions. Do the critical items first, since errors there change the plan the most. Run the checklist before go-live, after a major data load, and whenever planners start to distrust the output.

Why these checks matter

Material requirements planning nets demand against stock, scheduled receipts and lead times, then explodes through the bill of materials. Each input is a possible failure. A missing lead time collapses a purchase into the wrong week. An old open purchase order keeps supply that never arrives. A warehouse that should not count can hide a shortage. Treating these as a routine data health check is cheaper than correcting expedites later.

Reading your result

If most critical items are ticked and your planners still see odd results, sample five items and trace the calculation manually from demand to suggestion. If you cannot reproduce the suggestion, a parameter or policy is overriding what you expect. If most critical items are open, fix data first and rerun before changing any planning settings.

Common mistakes

Teams often tune safety stock to hide a lead time problem, or switch to net change runs to save time and then wonder why old demand lingers. Another habit is leaving past due purchase orders open for months. Plan a periodic regenerative run and a clean-up of stale documents to keep the plan honest.

Frequently Asked Questions

Why does SYSPRO MRP suggest nothing for an item?

Common causes are the item not being flagged for planning, no demand within the horizon, enough stock or supply to cover demand, or a warehouse excluded from planning. Check the item's planning settings first, then compare demand and supply by date.

How often should MRP run?

It depends on how fast your demand changes. Many manufacturers run nightly so planners start the day with fresh suggestions, with a full regeneration less often. Pick a cadence, document it, and make sure the people acting on the output know when it last ran.

Should I trust firm planned orders?

Use them deliberately. They hold a decision in place, but they can also hide changes in demand. Review them regularly and release or cancel them so they do not drift away from reality.

Does this apply to other ERPs?

Most of the data checks apply to any MRP engine, including Sage Evolution and Odoo. Screen names and parameters differ, but lead times, bills, supply dates and demand quality drive every system.

If planners spend more time questioning MRP output than acting on it, Netray can build read-only checks over your SYSPRO data that flag missing lead times and stale supply automatically.

Get SYSPRO alerts

Support and maintenance deadlines, release changes that affect SYSPRO sites, and new free SYSPRO tools. A couple of emails a month at most.

Free. Unsubscribe with one click from any email.

ArchRay builder
Design the on-prem AI stack for SYSPRO: model, GPUs, RAG pipeline, guardrails
See memory, speed and cost as you swap parts, then export the diagram. Free, in your browser.
Open the builder

New to SYSPRO? Start with the SYSPRO guide and toolkit, or plan with Training Path Builder, Upgrade Path Planner, ERP Table and Field Explorer.

Keep exploring

Free tools

ERP fixes and how-tos

AI on your ERP

Integrations

Software