SYSPRO Upgrade Checklist: Plan, Test and Go Live

SYSPRO upgrades go smoothly when custom items, add-ons and backups are handled before the window opens, and badly when they are discovered during it. This checklist breaks the work into planning, environment, customisations, testing and go live.

0%

0 of 28 items complete

9 critical items still open - these are the highest-risk gaps.

Download checklist:

Planning and scope

Environment and backups

Customisations and integrations

Testing

Go live and after

Critical items are the ones where a miss can stop go-live or cause data loss. Close them first and keep evidence of each.

Upgrade risk review

Optional: we can review your custom items and integrations and list the likely rework.

Optional. The tool and every export work without this. No spam.

How to use the checklist

Assign each group to an owner and tick items as evidence is collected, such as a restore log, a signed test script or a vendor email. Treat the critical items as gates: do not move to the next phase until they are done. Use the printed version in project meetings so open items are visible. Reuse the same list for each future upgrade and improve it each time.

Where upgrades usually fail

The common failure points are untested restores, add-ons that are not yet compatible, custom forms or reports that break after the update, and integrations that depend on behaviour that changed. A full dress rehearsal on a copy of live data exposes most of these and gives you a realistic downtime estimate, which users appreciate. Without it, the go-live window is a guess.

Testing that counts

Test the processes the business cannot live without: take a sales order through to invoice, receive a purchase order, run MRP, issue material to a job and close a period. Use real users and real data volumes. A tester who is not the daily user will miss the awkward cases. Record the outcome of each script so the sign-off is auditable.

Common mistakes

Teams skip the test restore, plan the upgrade for the week of a stock take, forget to retest scheduled jobs, or leave users out of testing. Another mistake is upgrading and changing processes at the same time, which makes problems hard to trace. Upgrade first, improve later.

Frequently Asked Questions

How long does a SYSPRO upgrade take?

The live cut-over often takes hours to a weekend, but the preparation takes weeks. Time depends on database size, number of companies, customisations and testing depth. A dress rehearsal gives the most reliable estimate for your environment.

Do I need a test environment?

Yes. Upgrading live without a rehearsal on a copy of production data exposes you to avoidable risk. A test copy lets you verify custom items, integrations and timings before the real window.

What happens to custom forms and reports?

Some survive unchanged and others need adjustment. List them all, retest each in the test environment, and ask your SYSPRO partner or the form author to confirm which need rework before the live upgrade.

Can I roll back after upgrading?

Only if you have a verified backup taken immediately before and a documented rollback decision point. After users have posted new transactions, a rollback means losing them, so decide early and set a time limit.

If you want help analysing custom forms and integrations before an upgrade, Netray can review the code and data flows and flag what is likely to need rework.