SYSPRO SQL Query Generator for Stock, Sales Orders and Jobs
SYSPRO stores company data in SQL Server, so reports, dashboards and integrations often start with a query on tables such as InvMaster, InvWarehouse, SorMaster and WipMaster. This generator fills the database name, warehouse and filters into ready queries you can paste into SQL Server Management Studio.
Fill in
The SQL Server database that holds the company tables.
Stock on hand by warehouse
USE SysproCompanyA;
SELECT w.StockCode,
m.Description,
w.Warehouse,
w.QtyOnHand
FROM InvWarehouse AS w
JOIN InvMaster AS m ON m.StockCode = w.StockCode
WHERE w.Warehouse = '01'
AND w.StockCode LIKE 'GBX%'
AND w.QtyOnHand >= 1
ORDER BY w.StockCode;Sales orders for one customer
USE SysproCompanyA;
SELECT s.SalesOrder,
s.Customer,
s.OrderStatus,
s.OrderDate
FROM SorMaster AS s
WHERE s.Customer = 'CUST001'
ORDER BY s.OrderDate DESC;Jobs for a stock code prefix
USE SysproCompanyA;
SELECT j.Job,
j.StockCode,
j.JobDescription,
j.QtyToMake,
j.QtyManufactured
FROM WipMaster AS j
WHERE j.StockCode LIKE 'GBX%'
ORDER BY j.Job;These queries are read-only SELECT statements. Table and column names are commonly seen in SYSPRO 7 and 8 company databases, but verify them against your version and any custom forms. Run on a reporting copy or with a read-only login, never on a login with write rights.
Ask SYSPRO questions in plain English
Optional: see how a read-only natural language layer could turn questions into reviewed SQL on your own server.
Optional. The tool and every export work without this. No spam.
How to use the generator
Enter the name of your company database, a warehouse code, a stock code prefix, a customer code and a minimum quantity. The three code blocks update as you type. Copy the one you need into Management Studio, a Crystal report command or a Power BI source. Each block is a single SELECT, so you can extend it with extra columns once you confirm it returns what you expect.
Tables used and why
InvMaster holds the stock code master and description. InvWarehouse holds quantities per stock code and warehouse. SorMaster holds sales order headers, and WipMaster holds work in progress job headers. Joining InvWarehouse to InvMaster on stock code gives a readable stock listing. Always filter by a warehouse or prefix, because unfiltered queries on large companies can return hundreds of thousands of rows.
Safe querying habits
SYSPRO business logic lives in the application, so direct writes to its tables are unsafe and can corrupt data. Use read-only logins, query a reporting copy where possible, and prefer SYSPRO e.net business objects for any change. Keep queries simple and avoid locking hints on production. When a figure must match a SYSPRO report exactly, check whether the report uses additional tables or rules.
Common mistakes
People forget to qualify the database name, join on description instead of stock code, or assume a single warehouse. Another mistake is ignoring custom fields and add-ons that change how stock is held. Test every new query against a known stock code and compare it with the figure shown on screen before sharing it.
Frequently Asked Questions
Is it safe to run these queries on a live SYSPRO database?
They are read-only SELECT statements and are generally safe, but large unfiltered queries can slow a busy server. Use a read-only login, filter by warehouse or prefix, and prefer off-hours or a reporting copy for heavy extracts.
Can I write data back with SQL?
You should not. SYSPRO enforces business rules in the application layer. Direct inserts or updates can break integrity between related tables. Use SYSPRO e.net business objects or the supported import tools for any write.
Why do my quantities differ from the SYSPRO screen?
The screen may show available quantity after allocations, in-transit or reserved stock, while the table column shows on-hand quantity. Check which field the screen uses and whether your query applies the same warehouse and status filters.
Do the names change between versions?
Core tables are stable across SYSPRO 7 and 8, but columns can be added and add-ons create their own tables. Look at the table in Management Studio and adjust the column list for your version.
If you want people to ask questions in plain language and get checked SQL back from your SYSPRO database, Netray builds that on-prem with read-only access.
Related Tools
SYSPRO Job Costing Worksheet
Enter estimated and actual material and labour for each WIP job and see cost variance per job and in total. Exports to Excel.
ERP OperationsSYSPRO MRP Checklist
A checklist of the master data, parameters and review steps that decide whether SYSPRO MRP output can be trusted.
ERP OperationsSYSPRO Upgrade Checklist
A phased checklist for upgrading SYSPRO: scoping, backup, customisations, test cycles and cut-over.
Supply Chain & InventorySage Evolution Stock Take Checklist
A practical checklist for running a physical stock take in Sage Evolution, from preparation to posting variances.
More Developer Tools tools
See all- SAP Sales Order ABAP SELECT Generator (VBAK, VBAP, VBFA)
- SAP Sales Order Create BAPI ABAP Generator (BAPI_SALESORDER_CREATEFROMDAT2)
- SAP ABAP Open Items SELECT Generator
- SAP ACDOCA SQL Query Generator
- SAP QM Inspection Lot ABAP SELECT Generator
- SAP Quality Notification Pareto SQL Query Generator
- SAP QM Usage Decision BAPI Skeleton
- ABAP Custom Exception Class Generator
- ABAP Unit Test Class Generator
New to SYSPRO? Start with the SYSPRO guide and toolkit, or plan with Training Path Builder, Upgrade Path Planner, ERP Table and Field Explorer.
Keep exploring
Free tools
- SYSPRO Private AI Layer Blueprint GeneratorGenerate a shareable architecture plan for adding a private, on-prem AI assistant to SYSPRO: read replica, e.net business objects, retrieval index, local model serving, permissions and audit.
- SYSPRO MRP ChecklistA checklist of the master data, parameters and review steps that decide whether SYSPRO MRP output can be trusted.
- SYSPRO Common Table Name ReferenceSearchable list of frequently used SYSPRO tables with module, purpose and key columns, for report writers and integrators.
ERP fixes and how-tos
- SYSPRO SQL Query for Inventory On Hand by WarehouseHow to query SYSPRO inventory on hand by warehouse in SQL Server: company database names, InvMaster and InvWarehouse joins, read-only safety and pitfalls.
- SYSPRO tables list: core database tables by module and safe queriesSYSPRO database naming, the core tables by module for inventory, sales orders and WIP, and safe read-only SQL patterns for reporting without risking data.
- How to Add AI to SYSPRO On-Prem Without Moving Your DataReference architecture for adding a private AI assistant to on-prem SYSPRO: SQL Server read replica, e.net business objects, retrieval, local GPU and audit.
AI on your ERP
- AI for SYSPRO production and job costingHow AI reads SYSPRO WIP jobs, labor and material postings to explain job cost variances and late work orders, with read-only access and on-prem hosting.
- AI for SYSPRO Manufacturing Operations: From Work Centers to AnswersSYSPRO Manufacturing Operations generates data on work centers, routings, and WIP - see how private AI turns it into shop floor answers on-prem.
Integrations
- How to add an AI chatbot to SYSPROAdd an AI chatbot to SYSPRO for staff and customers: grounded in e.NET and SQL data, role-aware answers, portal embedding, and fully on-prem with open models.
- How to connect Power BI to SYSPROConnect Power BI to SYSPRO: SQL Server direct vs data warehouse, on-prem data gateway, manufacturing dashboards, refresh strategy and natural-language Q&A.